HomeMy WebLinkAbout20221139.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF
TEMPORARY CLOSURE OF COUNTY ROAD 15 BETWEEN COUNTY ROADS
40 AND 42 FOR AN ADDITIONAL THREE (3) WEEKS, FOR UNANTICIPATED
DELAYS DUE TO WEATHER AND UNEXPECTED UTILITY CONFLICT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of
Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on
County roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic
thereon for the safety of the general public and that said traffic control devices shall conform to
the Federal Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that the temporary closure of County Road 15, between
County Roads 40 and 42, be extended, with said extended closure being effective March 9, 2022,
for approximately an additional three (3) weeks through May 13, 2022, for unanticipated delays
due to weather and an unexpected conflict with utilities, and further, that standard official traffid
control devices shall be erected at said closure giving notice of the restrictions.
cc:SoCP$),p',sPatch,CSP
s IW /22
2022-1139
EG0024
EXTEND TEMPORARY CLOSURE — COUNTY ROAD 15
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 20th day of April , A.D., 2022, nunc pro tunc March 9, 2022.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: da9164) je40:K
Weld County Clerk to the Board
Scbtt K. James, Chair
Mike man, Pro-Tem
BY:
AP
County A ttorney
Date of signature: 4/29/22
Lori
2022-1139
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: April 18, 2022
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
SMH West is requesting permission to extend the closure of CR 15 between CR 40 and CR 42 until
5/13/2022 due to weather delays and an unexpected utility conflict.
This closure was originally approved for 3/9/22 through 4/22/22 for the installation of a 16" water main
for the Town of Johnstown.
See attached closure diagram.
2022-1139
o4/ Zo �C- cui-1
Amy -
From: Dan Jones
To: Amy Mutchie
Cc: J<C Young; jeffrev Meis; Trent Foley
Subject: Johnstown Waterline - CR 15 Full Closure Revised TCP
Date: Friday, March 4, 2022 8:23:31 AM
Attachments: jmage001.onq
CR 15 Clsr MHT#16 - REV 1.odf
Importance: High
is.email originated -from outside of Weld Caul.'
e Sender and know the'content is safe.' .'
Do not click links or open :a
timents unless
Please see the attached revised TCP for the full closure of CR 15. After discussing internally, we feel
that adding the waterline installation to operation will be most efficient schedule wise and cause the
least impact to the residents and farmers in the area. This will increase the duration that we need to
have the road closed by a couple of weeks.
We expect to need the closure from March 9th, 2022, to April 22nd, 2022.
We are going to go ahead and set out the message boards today in good effort to have then out for
the required days ahead of the closure hoping that we can get approval to start on Wednesday, that
will be a 6 -day notification.
Please let me know if you have any questions or concerns.
Thank you,
Daniel Jones
Sr. Project Manager
SMH West, LLC
p: 720.703.5935 f: 952.492.5705
a: 900 Castleton Rd, Ste. 125, Castle Rock, CO 80109
w: SMHWest.com e: dan.jones@smhwest.com
SMH West // S.M. Hentaes & Sons // Est. 1981
www.lovelandbarricade.com
LOVELAND
BARRICADE
ott Sree sawee
use control -sy,s man.Mp a IMAM -
PawinM enang -no.. arphs
4336WWAse
Loveland, C080638
Phone. WO) 61131311
yr. PM 6634270
TRAFFIC CONTROL PLAN
Loation WCR 15 a Ernen
Extension Canal
MHT #16
City: Iohaetow4 CD
o m Farmaan, 2y 2g22
NOT DRAWN TO
SCALE
NOTE:
-Sign spacing will be determined according to
Table 6H-3 in the Manual on Uniform Traffic
Control Davieas (MUTCD).
- Loveland Barricade LL.C. does not accept
any liability if another Company or Individual
sets -up or adjusts the Traffic Control
represented on this PIanIM.H.T.
Tabulation of Devices:
6 -Road Work Ahead
2 - Road Closed Ahead
2 - Detour Ahead
2 - Detour Track Right
4 - Detour Tracker Left
1 - Type III Barricade Road Closed
To Thru Traffic Detour Left
1 - Type III Barricade Road Closed
Detour Right
1 - Type III Barricade Road Closed
2 - Type III Barricade Plain
2 - Variable Message Board
12 - Channelizers
WCR 15
CLOSED
STARTING
3-9-22
THRU
4-22-22
bb
Farmers
Extension
Canal
4-
WCR 15
WCR 15
CLOSED
STARTING
3-9-22
THRU
4-22-22
Bore Location
Approx.
1160 ft
II
WCR 42
WCR 40
Ostrich St
Hello