Loading...
HomeMy WebLinkAbout20220428.tiffCOLORADO • Department of Public Health & Environment Weld County - Clerk to the Board 1150 O St PO Box 758 Greeley, CO 80632 January 20, 2022 To Whom it May Concern: RECEIVED JAN 2 62022 WELD COUNTY COMMISSIONERS On January 21, 2022, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Evans 7-26 Pad. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director ':c 9 PU bl ; c. ReV'. 6W CC: Pl-(T?),HC-0DSITR',P�I(JM/CR/CH/CK), O{ /3I /22 O6C3") of/?G/?... 2022-0428 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public M� Comment Website Title: PDC Energy, Inc. - Evans 7-26 Pad - Weld County Notice Period Begins: January 21, 2022 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Evans 7-26 Pad Well production facility SWNE SEC 26 T5N R66W Weld County The proposed project or activity is as follows: PDC Energy, Inc is requesting reduction of process limits and permitted emissions of condensate storage vessels from an existing major source of VOC located in the non - attainment area. With this modification, operator is attempting to obtain a federally enforceable limit on the potential to emit of the source in order to avoid other requirements. No other modifications were requested. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • The source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements. The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 17WE0395 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation • Send an email to cdphe.commentsapcd@state.co.us • Send comments to our mailing address: Diego Chimendes Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 (COLORADO 2.01 1 I Department of Public Health 6 Envfronmm t Hello