Loading...
HomeMy WebLinkAbout20223220.tiffBOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW PASS -AROUND TITLE: BOCC Agenda Item - Approve Road Maintenance Agreement for: PDC Energy, Inc.—1041WOGLA22-0025 Guanella Comprehensive Development Plan DEPARTMENT: Planning Services DATE: November 8, 2022 PERSON REQUESTING: Jazmyn Trujillo -Martinez Brief description of the problem/issue: The Department of Planning Services received a request from the applicant, PDC Energy, Inc., requesting that the Board of County Commissioners consider approving the Road Maintenance Agreement for (1041WOGLA22-0025 Guanella Comprehensive Development Plan). No collateral is required with this agreement. The Oil and Gas Energy Department's hearing for 1041 WOGLA22-0025 Guanella Comprehensive Development Plan is scheduled for November 10, 2022. Weld County Planning Services, Public Works, and Oil and Gas Energy Departments have reviewed the above mentioned signed original document and observed the following: • All Public Works related items, of the "Road Maintenance Agreement According To Policy', are found to be acceptable. • This Agreement complies with the terms of the 1041 WOGLA Permit, as signed by the Director of Oil and Gas Energy Department. • This Agreement follows the template approved by the County Attorney. What options exist for the Board? (include consequences, impacts, costs, etc. of options): 1. Have this BOCC Hearing item be placed on the next available agenda as part of the Consent Agenda. 2. Have this BOCC Hearing item be placed on the next available agenda as part of the Regular Agenda. Recommendation: Option 1. The Departments of Public Works, Planning Services, Oil and Gas Energy, and the County Attorney's Office are recommending approval of the Road Maintenance Agreement According To Policy for 1041 WOGLA22-0025 Guanella Comprehensive Development Plan, and that this item be placed on the next regularly scheduled BOCC Hearing, as part of the Consent Agenda. Approve Recommendation Perry L. Buck Mike Freeman, Pro-Tem Scott K. James, Chair Steve Moreno Lori Seine &frx-4-"-t ll- /G - a4 Schedule Work Session Other/Comments: • PL(AA IaTM) II/30/22. CPL) iZ/43/ate 2022-3220 06-oo0 3 ROAD MAINTENANCE IMPROVEMENTS AGREEMENT PDC Energy, Inc. — 1041 WOGLA22-0025 Guanella Comprehensive Development Plan THIS AGREEMENT is made this ' day of cp,P4(.r, 2022-, by and between PDC Energy, Inc., a corporation organized under the laws of the State of Delaware, whose address is 1775 N Sherman Street, Suite 3000, Denver, CO 80203, hereinafter referred to as "Operator," authorized to do business in the State of Colorado, and the County of Weld, a body corporate and politic of the State of Colorado, by and through its Board of County Commissioners, whose address is 1150 "0" Street, Greeley, Colorado 80631 hereinafter referred to as "County." WITNESSETH: WHEREAS, "Operator" is the responsible party of the 1041 Weld Oil & Gas Location Assessment (1041 WOGLA) Comprehensive Development Plan (CDP) permit located on the following described property in the County of Weld, Colorado: Township 5 North, Range 65 West, 6th P.M. Sections 30-31: W1/2 Township 5 North, Range 66 West, 6th P.M. Section 17: W1/2 Sections 18-19: All Section 20: W1/2 Section 24: W1/2 Section 25: All Sections 26-30: S1/2 Sections 31-36: All Township 5 North, Range 67 West, 6th P.M. Sections 13-14: All Sections 23-26: All Sections 35-36: All Township 4 North, Range 65 West, 6th P.M. Section 6: S1/2, NW 1/4 Section 7: All Sections 18-19: All Section 30: All Township 4 North, Range 66 West, 6th P.M. Sections 1-5: All Section 6: E1/2, NWl/4 Sections 10-15: All Section 16: NE1/4, /4, S1/2 Section 17: S1/2 Sections 18-27: All Township 4 North, Range 67 West, 6th P.M. Sections 1-3: N1/2 Section 4: NEI/4 PDC Energy, Inc. — I041 WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 Page 1 of 8 hereinafter referred to as "the Property," and WHEREAS, Operator has received approval by the Hearing Officer of the Oil and Gas Energy Department for 1041 WOGLA22-0025, and WHEREAS, Operator will submit separate 1041 WOGLA permit applications for each individual site that is a part of the 1041 WOGLA22-0025 Guanella CDP and this Agreement will be tied to each individual site and 1041 WOGLA permit, and WHEREAS, Operator acknowledges that the final approval of 1041 WOGLA22-0025 is conditional upon Operator's agreement to fund road maintenance, as described in this Agreement. NOW, THEREFORE, IN CONSIDERATION OF the foregoing and of the promises and covenants contained herein, the parties hereto promise, covenant and agree as follows: PART I: SITE SPECIFIC PROVISIONS A. PRIOR TO CONSTRUCTION AND OPERATIONS: 1.0 Haul Routes: The Operator shall provide haul routes to be reviewed and approved by the Department of Public Works. The Operator shall be financially responsible for its proportional share of the County's costs associated with maintaining and/or improving designated haul/travel routes as related to traffic generation. Traffic generated from this site shall enter and exit at the approved access at each individual site and travel to the nearest paved arterial or collector road, or highway, and remain on paved roads for further dispersal. Any County roads used by traffic associated with 1041 WOGLA22-0025 CDP may become part of the established haul/travel routes. 1.1 Haul Routes. The following roads are designated as haul/travel routes for any time period designated as construction or high -volume traffic to and from the Property: 1) See "EXHIBIT A" - Haul Route Overview Map. 2) A site -specific haul route map for each individual 1041 WOGLA permit site in the 1041 WOGLA22-0025 CDP shall be submitted and made part of this Agreement. 3) The haul route shall remain in effect during all times of heavy road use including but not limited to, construction, drilling of wells, and hydraulic fracturing. 2.0 Notice of Construction. A pre -construction inspection and a post -construction inspection shall be performed by County personnel to determine the site -specific condition of the road. The Operator shall provide the Weld County Departments of Public Works and Planning Services with two weeks advance notice of the start of construction activities authorized by each issued 1041 WOGLA permit within the CDP and shall give additional notice within two weeks after construction has been completed. 3.0 Weight Limits. No travel vehicles may exceed CDOT required specifications for pounds -per -axle and axle configurations unless overweight permits have been applied for and granted. Operator is responsible for researching weight limited bridges and obtaining a Special Transport Permit in accordance with Chapter 8, Article XV, when establishing haul routes, and furthermore, must follow County overweight permit and regulations. PDC Energy, Inc. — 1041 WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 Page 2 of 8 4.0 Temporary Deviations. The Weld County Department of Planning Services Director may approve temporary (six months or less) deviations from the haul routes described above. To receive such approval, the Operator must submit an updated haul route map and written request stipulating the reasons for the deviation, which will be reviewed County personal. Any change in haul route lasting more than six months shall require an amendment to this Agreement approved by the Board of County Commissioners. 5.0 Haul Route Signage. Operator shall install travel route signs, if applicable, as per Manual of Uniform Traffic Control Devices standards, at all exit points of the Property which can be clearly seen by drivers leaving the facility and which clearly depict County approved travel routes. 6.0 No Deviation from Permitted Haul Routes. Except as authorized by the Weld County Board of County Commissioners or the Director of the Department of Weld County Planning Services, pursuant to this Agreement, no use of any roads other than those specifically authorized for use in this Agreement is permitted without the prior written amendment of this Agreement. B. Maintenance Requirements: 1.0 Off -site recurring maintenance, if applicable, and as required by the Departments of Planning Services, Public Works, and/or Oil and Gas Energy, shall only be performed by a County approved contractor, and have a county Right -of Way permit for that specific location: 2.0 Dust Control. Operator shall be financially responsible for maintaining dust control on unpaved designated haul/travel routes during any period of construction, heavy truck traffic, and/or high -volume trip generation. The amount and extent of dust control will be coordinated with Public Works Gravel Roads Division by site -specific conditions at the time. Operator shall use a County -pre -approved contractor for chemical applications. Chemical treatment of unpaved roads along the relevant haul/travel route(s) is expected to occur approximately two to five times per year, or as required by Public Works. If traffic associated with this use exceeds 200 vehicles per day, per Weld County Code Section 8-6-100, the Operator shall be responsible for dust abatement. On the basis of damage or complaints, as determined by the County, the Operator shall cause to be performed within two days of notification, at its sole expense, chemical dust control, or other treatment, by a contractor approved by Weld County Public Works. Should the traffic related to any sites that are part of 1041 WOGLA22-0025 CDP deteriorate the chemical application performed by the County, the Operator will be responsible for re -applying chemical to return the road to pre -construction condition. Depending on the amount of maintenance, as related to traffic associated with this use, the Department of Public Works may require an alternative treatment method which may or may not include topical chemical application, full -depth chemical application, recycled asphalt, or other surface I. treatment. 3.0 Repair. Operator shall be financially responsible for its proportional share of the repair or improvement, including but not limited to, excavation, patching, pavement and/or gravel repair, grading, installing material on designated haul/travel routes. The amount and extent of repair and/or paving measures will be determined by site -specific conditions at the time, as determined exclusively by County personnel. 86 Weld County and Operator will work together on a plan needed for repair of any roads, including who m ; Y performs the repair. Operator shall provide the County with a pre -approved contractor to be used for repairs. -3� °f fi► -i 4;�� 4.0 Need for Immediate Repairs: In the event of damage to a designated haul/travel route by project °• LLh traffic that causes an immediate threat to public health and safety or renders the road impassible ° u n ("Significant Damage"), County shall, after inspection, notify Operator of such Significant Damage. N ! Operator shall identify the repair required and shall consult with County on the extent, type, timing, �aY materials and quality of repair (i.e. temporary versus permanent) within twenty-four (24) hours after receipt of such notice and shall commence such repair within forty-eight (48) hours after receipt of such notice. If ~U� Nr No a PDC Energy, Inc. - 1041 WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 1"Z12:-.1 Page 3 of 8 Operator identifies Significant Damage prior to receiving notice thereof from County, Operator may commence repair of such Significant Damage and shall concurrently notify County of the extent, type, timing, materials and quality of repair (i.e. temporary versus permanent). 5.0 Repair of Road: On or before December 31 of the calendar year in which County staff has determined through site analysis and/or pavement testing that a particular haul/travel route road portion will require paving measures or major gravel maintenance in order to protect the public health, safety, and welfare, and the County has budgeted sufficient funds for the following calendar year to pay its share of the Off -Site Improvement/Repair Costs, County shall notify Operator in writing that the Off -Site Improvements/Repairs sial I be undertaken and shall provide an alternate haul route for the duration of those repairs. In County's sole discretion, County may undertake the repairs and/or improvements. Operator's payment for its Proportionate Share of the road repairs/improvements will be calculated as determined in this Agreement. Operator will be invoiced accordingly for those proportional share costs. 6.0 Calculation of Operator's Proportional Share of Costs. The County shall notify Operator of County's preliminary determination and assessment of Operator's proportional share of costs of maintenance, repair, or improvements to Operator's designated haul/travel routes. Prior to County's final determination and assessment, County shall provide Operator with a reasonable opportunity to review, comment upon and supplement County's data, collection methodology, and determinations. The County shall review and consider Operator's input prior to making a final determination and assessment. The County shall have sole responsibility for determination of Operator's proportional share of costs. Operator agrees to pay such proportional share of costs within 30 days of receiving an invoice from County. 7.0 Annual Road Inspection. County may conduct a road inspection annually with the cooperation of Operator for the haul routes designated in this Agreement. As a result of the annual inspection, County, in its sole discretion, shall determine actual conditions and shall further determine what road repair/improvement/maintenance work is to be performed during that construction season. Notification to the Operator of the required roadway repairs will be given as soon as the data become available. 8.0 Notification. The County shall notify Operator of County's preliminary determination and assessment of Operator's proportionate share of costs of maintenance, repair, or improvements to Operator's designated haul/travel routes. Prior to County's final determination and assessment, County shall provide Operator with a reasonable opportunity to review, comment upon and supplement County's data, collection methodology, and determinations. The County shall review and consider Operator's input prior to making a final determination and assessment. ▪ PART II: GENERAL PROVISIONS 8.2 • A. Permits: The Operator is required to apply for and receive all permits required by the County or = any other applicable local, State, or federal permit, including but not limited to: o 1.0 Access Permits. Operator shall not use any access onto any County road unless and until an access permit has been issued by the Department of Planning Services. Planning Services may condition the m3 issuance of an updated access permit on the amendment of this Agreement if the updated access permit w� _x authorizes the use of an additional access point, or if there is a change in use of the current access point, as permitted by Article XIV of Chapter 8 of the Weld County Code. "..'"="2.0 Right -of -Way (ROW) Permits. Per Article XIII of Chapter 8 of the Weld County Code, any work occurring within County ROW requires a ROW permit issued by the Department of Public Works. No work 1aYt shall occur without said ROW permit. Nom` NOP.. PDC Energy, Inc. — 1041WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 Page 4 of 8 3.0 Transport Permits. Per Article XV of Chapter 8 of the Weld County Code, a Weld County Transport Permit is required for Extra -legal vehicles using Weld County roadways to ensure the operation and movement of Extra -legal Vehicles and Loads occurs in a safe and efficient manner. B. Enforcement and Remedies: 1.0 Violation of Terms of Agreement. If in County's opinion, Operator has violated any of the terms of this Agreement, County shall notify Operator of its belief that the Agreement has been violated and shall state with specificity the facts and circumstances which County believes constitute the violation. Operator shall have fifteen (15) days within which to either cure the violation or demonstrate compliance. If, after fifteen (15) days have elapsed, County believes in good faith that the violation is continuing, County may consider Operator to be in breach of this Agreement. 2.0 Remedies for Breach by Operator. In the event that County determines that Operator has violated the terms of this Agreement, and has failed to correct said violation, County may exercise any or all of the following remedies, or any other remedy available in law or equity. 2.1 Court Action. County may seek relief in law or equity by filing an action in the Weld District Court or Federal District Court for the District of Colorado, except that no such civil action or order shall be necessary to access collateral for the purpose of completing improvements as described above. 2.2 Revocation of 1041 WOGLA Permit. Operator acknowledges that failure to comply with the terms of this Agreement constitutes cause to revoke the 1041 WOGLA, and County may exercise this option in its sole discretion by proceeding with revocation under the current provisions of the Weld County Code. 3.0 Termination of Agreement. This Agreement shall terminate upon the earliest of the following events: 3.1 Failure to Commence. County may terminate this Agreement upon or after rescission of the underlying 1041 WOGLA permit approval under Weld County Code Chapter 21. However, County may still exercise all necessary activities under this Agreement that the County determines necessary to protect the health, safety, and welfare of the residents of Weld County. 3.2 Cessation of all Permit Related Activities. Termination of this Agreement shall occur upon Operator's complete cessation of all activities permitted by the 1041 WOGLA, including any clean up or restoration required. A partial cessation of activities shall not constitute a Termination of this Agreement, nor shall County's issuance of a partial release/vacation constitute a Termination. Unless informed in writing by the Operator of cessation of activities, and verified by the County, cessation shall only be presumed if the County determines that the site has been inactive for three (3) years. 3.3 Execution of Replacement Agreement. This Agreement shall terminate following County's execution of a new Improvements Agreement with a new Operator who has purchased the Property or has assumed the operation of the business permitted by the 1041 WOGLA, and intends to make use of the rights and privileges available to it through the then existing WOGLA. 3.4 Revocation of 1041 WOGLA. This Agreement shall terminate following County's revocation of Operator's WOGLA, except that the Operator shall only be released from this Agreement after the successful completion of any/all reclamation required under this Agreement. PDC Energy, Inc. — 1041WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 Page 5 of 8 C. General Provisions: 1.0 Successors and Assigns. 1.1 Except for the assignment of all or substantially all of Operator's assets, Operator may not delegate, transfer, or assign this Agreement in whole or in part, without the prior express written consent of County and the written agreement of the party to whom the obligations under this Agreement are assigned. Consent to a delegation or an assignment will not be unreasonably withheld by County. In such case, Operator's release of its obligations shall be accomplished by County's execution of a new Agreement with the successor Operator of the property. 1.2 County's rights and obligations under this Agreement shall automatically be delegated, transferred, or assigned to any municipality which, by and through annexation proceedings, has assumed jurisdiction and maintenance responsibility over roads affected by this Agreement. 2.0 Severability. If any term or condition of this Agreement shall be held to be invalid, illegal, or unenforceable by a court of competent jurisdiction, this Agreement shall be construed and enforced without such provision, to the extent that this Agreement is then capable of execution within the original intent of the parties. 3.0 Governmental Immunity. No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act §§24-10-101 et seq., as applicable now or hereafter amended. 4.0 No Third -Party Beneficiary. It is expressly understood and agreed that the enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties and nothing in this Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be an incidental beneficiary only. 5.0 Entire Agreement/Modifications. This Agreement including the Exhibits attached hereto and incorporated herein, contains the entire agreement between the parties with respect to the subject matter contained in this Agreement. This instrument supersedes all prior negotiations, representations, and understandings or agreements with respect to the subject matter contained in this Agreement. This Agreement may be changed or supplemented only by a written instrument signed by both parties. 6.0 Board of County Commissioners of Weld County Approval. This Agreement shall not be valid until it has been approved by the Board of County Commissioners of Weld County, Colorado or its designee. 7.0 Choice of Law/Jurisdiction. Colorado law, and rules and regulations established pursuant thereto, shall be applied in the interpretation, execution, and enforcement of this Agreement. Any provision included or incorporated herein by reference which conflicts with said laws, rules and/or regulations shall be null and void. In the event of a legal dispute between the parties, the parties agree that the Weld County District Court or Federal District Court for the District of Colorado shall have exclusive jurisdiction to resolve said dispute. 8.0 Attorneys' Fees/Legal Costs. In the event of a dispute between County and Operator, concerning this Agreement, the parties agree that each party shall be responsible for the payment of attorney fees and/or legal costs incurred by or on its own behalf. PDC Energy, Inc. — 1041 WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 Page 6 of 8 9.0 Release of Liability. Operator shall indemnify and hold harmless the County from any and all liability loss and damage County may suffer as a result of all suits, actions, or claims of every nature and description caused by, arising from, or on account of the design and construction of improvements, and pay any and all judgments rendered against the County on account of any such suit, action or claim, and notwithstanding Section 7.0 above, together with all reasonable expenses and attorney fees incurred by County in defending such suit, action or claim whether the liability, loss or damage is caused by, or arises out of the negligence of the County or its officers, agents, employees, or otherwise except for the liability, loss, or damage arising from the intentional torts or the gross negligence of the County or its employees while acting within the scope of their employment. All contractors and other employees engaged in construction of the improvements shall maintain adequate worker's compensation insurance and public liability insurance coverage and shall operate in strict accordance with the laws and regulations of the State of Colorado governing occupational safety and health. 10.0 Binding Arbitration Prohibited. Weld County does not agree to binding arbitration by any extra judicial body or person. Any provision to the contrary in this Agreement or incorporated herein by reference shall be null and void. 11.0 Authority to Sign. Each person signing this Agreement represents and warrants that he or she is duly authorized and has legal capacity to execute and deliver this Agreement. Each party represents and warrants to the other that the execution and delivery of the Agreement and the performance of such party's obligations hereunder have been duly authorized and that the Agreement is a valid and legal agreement binding on such party and enforceable in accordance with its terms. If requested by the County, Operator shall provide the County with proof of Operator's authority to enter into this Agreement within five (5) days of receiving such request. 12.0 Acknowledgment. County and Operator acknowledge that each has read this Agreement, understands it and agrees to be bound by its terms. Both parties further agree that this Agreement, with the attached or incorporated Exhibits, is the complete and exclusive statement of agreement between the parties and supersedes all proposals or prior agreements, oral or written, and any other communications between the parties relating to the subject matter of this Agreement. 13.0 Notwithstanding any other provision contained in this Agreement, for any conflict or potential conflict between any term in this Agreement and the Resolution of the Board of County Commissioners approving the underlying land use permit, the provisions of the Board's Resolution shall control. In the event of a discrepancy between this agreement and the Weld County Code in effect at the time of the agreement, the terms of the Weld County Code shall control. PDC Energy, Inc. — 1041 WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 Page 7 of 8 IRevgal£iewedby LeQep[ :I Date: 173 °/Za L Title: Director of Land Operations and Attorney -in -Fact STATE OF COLORADO SS. County of Weld The foregoing instrument was acknowledged before me this day of Sz, 0,620t,, 202) , by 'Paul LOW SG► r WI am a NOTARY PUBLIC STATE OF COLORADO Notary Pub NOTARY ID 19964006795 MY COMMISSION EXPIRES 03126/2025 WELD COUNTY: ATTEST. v•�� BOARD OF COUNTY COMMISSIONERS Weld you y Clerk to the Beard WEL COUNTY, COLORADO BY: / iek Deputy Cie/ to ' e B. /� l K. James, Chair 1 o 2522 PDC Energy, Inc. — 1041WOGLA22-0025 Guanella Comprehensive Development Plan — RMA22-0018 Page 8 of 8 " 25 I . - . ��i 11 28 22 n _- _ I _ ' - - - r, a '- 85 i {3 'incisor �-" ' `'''''.N �'` . ; . . i;_ f . ,� �.I_ ,., t. cc ` \\ans.� a t� r 'ice ; J J T7tC7T1 �► �. �ii� �1 X1,1 u ■ t I!1 iii ■ii �1�■ �/11I� I ■■ 5 4 n �� 1111 • f �+� Y�I/i1��■.ate - _ _ -'�� -. I --LL_ _ -Cd 60 - -� 41l'� '_.. - - -�? "•- = _ -, .._ --•_ -. ` 257 �' o-R ' ' 111�1i1�' �f■■_■S■■� ■■�y = ....y■■■■■■.■ 9 7 8 10 ti 2 ♦� ■■ � �a I���■■■■. r■■ t III CJrL'L'IP ' .' c. oil re � :7k; �si 'll •+ e�� i BYPASS STATE I 7l. 15 16 14 13 18 �•.:.. Sill ■ t �, ♦� ..! .. 4II r -1�1l11- t �{• 257! Garden Lily °���.---� � �' DENALI STATE-- -- - . ! 56 34 Co•Rd 56 34 _.!: < Co Rd -. - ^ 5N/67W — ... �.li Cameron 4% C i, f`�Ai �f ' 22 Zz 19 q `- - - - - - '1 - - 21 2. • mm �� WINDOM Sanford11 R�_ � '• Facilit Y 1 E, arts • --_• p ,_ .'■1 --- - Co Rd 54 - - - ..._. _ :... 1,I `■1■V C _. (Existing) ' 1 ',- L`If•1 t, I■ a i ' per ... f�■ %lV SANFORD ST • .� kl BOOTH STATE t 26 25 v 28 -..:t.......... 27 ' 1 �•� / J IV .. -_-- - Co'Rd 52 ' ' / Trout Creek --d ' ` N. )' Co'Rd 52 '` BONA STATE'''± ----Raton /S '� 35 36 Co Rd 50.5 33 34 • 36 36 31 n 3 Rd po I 32 tt QUANDAR .- Co r' n 32 �� r , �,' ue,A� I _ / c c sa Sit ii %a r� fie,'$ G° W CAPITOL ' Co -Rd 50 ` ' l Co=N I J - BEL FORD Rd so rfi '�► , �.'_.. HYALE N, v OXFORD - , / Je r 3 3 �,` I 'a f 4 f . % 5 4396:` ,. Cad 111.3 ' 0.396 p 2 a j 6 c' —.. tt 0- 4 a° ffi - 4 I, BLACKBURN FEDERAL .. N ,1• a H r--- �.3g• ,'�o; ; ERSTAD z - Go 9u ^ FEDERAL ce R4 4e V / U -..-:=CORY { n• ,mot' 1 ♦ 1 1 i __ w ..-_ 11 e„q .o ... ., 9 AUGUSTA -r .lulutxfu,►'it'' Ili o! a [Iw FEDERAL '.� • 7 ..._ caid IB.5 �\ 8 9 4 10 �_ ry (60 e 8 ri „l a j j ��� �' � : 7 Link- h V V y ; i k / 4 85_ 1s; I 11 TETON I -� �----�-' Co Rd 46 q-' i 4 �1 i- Cad 46 Cad 46 4- - - 1 ffr II _ ARENAL FEDERAL ( Fremont t THERA 115 18 17 18 Guanella CAP Development Schedule ' 0 4 REDOUBT ss FEDERAL) Half Year Quarter Pad Phase ss _ , 6 CoRd 44 2H 2023 4Q 2023 Bypass State Cameron Trail Ridge 24 v 5 MAROON BELLS 1H 2024 10 2024 Windom Cameron Ql a 19 ST. HELENS �'' - ►\\_ 19 t 20 2H 2024 3Q 2024 Denali State Cameron 20 21 2H 2024 .3Q2024 Blackburn Federal Raton ' Li II 2H 2024 4Q 2024 Capitol Raton .j. z Battle eiCa , _ `oRd42—° Mo"unta►n I 2H 2024 4Q2024 Booth State Cameron w_- I r'') fir-/ u FUJI FEDERAL 85 1H 2025 3Q 2025 Bona State Cameron 13Gilcresi U ' 30 29 2H 2025 3Q 2025 Sanford State Trout Creek 27 26 25 140.5 ., 29 2H 2025 4Q 2025 Quandary Trout Creek 2H 2026 3Q 2026 Fuji Federal Battle Mt --Co Rd 40 Co Rd 40 Co Rd 40 - Co Rd 40 F' 2 2H 2026 4Q 2026 St Helens Battle Mt 0 1H 2027 1O2027 Belford Trout Creek ,,, 1H 2027 2Q 2027 Yale Trout Creek 32 _ 35 so 31 32 - Lead 365 13 2 2H 2027 3Q 2027 Oxford Raton ;' es 2H 2027 4Q 2027 Maroon Bells Trail Ridge HUM rills' CI Co Rd 30 Co 8438 1H 2028 1O2028 Redoubt Federal Trail Ridge "°-� 1 2H2028 3Q2028 Thera Fremont 85 I a O 2H 2028 4O2028 Arena' Federal Fremont 6 , 5 z 4 3 2 1 b 5 1H 2029 1O2029 Teton Fremont in wi r. " 1H 2029 2Q 2029 Augusta Federal Fremont t I U I CoRd36- 2H 2029 3O2029 BierstadtFederal_. - Flemont 4d46 t e 9 10 11 12 7 8 4 - - - -- --- - - -- 1, Miles 0 025 05 1 1 5 2 PDC Exhibit A -i ENERGY Legend City Boundary Developmet Phases CAP Roads Rule 314-e.(3).B. _gellin �� � L - Count Battle Mountain > - - — Proposed Pad Access Road y Road Map .14,i ...,,,,,,.% i 4,.1•,.r, Cameron Highways/Main Roads o_.r Other •r•-1.. s� Date: 6/21/2022 Illil Fremont Paved County Roads/Local Roads : Interstate �7__ 1, Raton N State Hwy ° z "IBS -YiO•.,r(rr,only '.Y.ri-. Trail Ridge • cJ * w : ru n... u .. , Mo s .t , e.-, o.. e.. r . U S Hwy S�^off o!, ,QC C ea •t crew, t-crr••. .e mro .n . _a is � fEP- •..j eanti were r ObflI.%..®�.•• flaw, tlotrt ?rp r.ry. =.e�-t.r..r..°a.-...„-- n.o„ Trout Creek Railroad Oran s i.. WS ..limn ax'.f ,1 =can In t •unaq A tad tete, tag •Y nowt' ornm'xC.n"r"4r'""^'° - Planned Pad •,.1. i,,:.N —� Din __ _— -- Aunor CC 4 R.I Pa' H(C Contract Form Entity Information Entity Name* PDC ENERGY, INC, New Contract Request Entity ID* 8O0015331 Contract Name* ROAD MAINTENANCE AGREEMENT PDC ENERGY, INC 1041WOOLA22-O025 GUANELLA COMPREHENSIVE DEVELOPMENT PLAN Contract Status CTB REVIEW ❑ New Entity? Contract ID 6476 Contract Lead* JTRUJILLOMARTINEZ Contract Lead Ernail jtrujillomartineznreldgov.c OM Parent Contract ID Requires Board Approval YES Department Project # Contract Description* ROAD MAINTENANCE AGREEMENT PDC ENERGY.. INC 1041 WOGLA22-0025 GUANELLA COMPREHENSIVE DEVELOPMENT PLAN NO COLLATERAL REQUIRED Contract Description 2 Contract Type* AGREEMENT Amount* $0.00 Renewable* NO Automatic Renewal Grant IGA Department PLANNING Department Email CM -Plan ningA'weldgov.com Department Head Email CM -Planning- Does Contract require Purchasing Dept. to be included? DeptHeadOweldgov.com NO Requested BOCC Agenda Date* 11'16;2022 Due Date 1112 2022 Will a work session with BOCC be required?* NO County Attorney GENERAL COUNTY ATTORNEY EMAIL County Attorney Email CM- COU NTYATTORN EY TWELDG OV.COM If this is a renewal enter previous Contract ID If this is part of a MSA enter NSA Contract ID Note: the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in On Base Contract Dates Effective Date Review Date" Renewal Date 11x16+2024 Termination Notice Period Committed Delivery Date Expiration Date* 1 1 16,'2026 Contact Information Contact Info Contact Name Purchasing Contact Type Contact Email Contact Phone 1 Contact Phone 2 Purchasing Approver Purchasing Approved Date Approval Process Department Head TOM PARKO JR. DH Approved Date 11 10 2022 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date 11 16 2022 Originator JTRUJILLOMARTINEZ Finance Approver CHERYL PATTELLI Legal Counsel BRUCE BARKER Finance Approved Date Legal Counsel Approved Date 11,10:2022 11 10 2022 Tyler Ref # AG 111622 Hello