Loading...
HomeMy WebLinkAbout20221561.tiffINVENTORY of ITEMS FOR CONSIDERATION Applicant Willard and Linda Owens (US Solar Corp) Case Number LISR22-0007 Submitted or Prepared Friar to Hearing At Hearing I SPo Response HOW Investments, ILLS — Applicant Video - https://youtu.be/OcNN7DzblYNA SPo Response - Weilert hereby certify that the two items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commissioners herring. Bela Snyder April 29, 2022 From: William Welch To: Angela Snyder Cc: swelch; Josh Welch Subject: PROPOSED USS Ricadilly Solar LLC Project Weld County, Co: Revised Comments and Objections Date: Monday/ April 25" 2822 2:48:81 PM Attachments: imageQCil.png drawings Westwood USR Site Plan 20220225 C201Sito Hydrology only.pdf Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Angela, Will welch here. This email is to correct a typo in the first sentence. The property owner is "HCW" as revised below not "rCwH" as originally sent. Good afternoon Angela, Will Welch here. I am working with HCW Investments/ LLC who own property located east of, and adjacent to, WCR23B, approximately 2,600 feet south of State Hwy 392; and directly south of the proposed project location. HCW's property information is: Account #: 80898501 and Parcel #080723000053. HCW has an historic irrigation water diversion off the Greeley Canal No. 2 and conveyance that traverses the proposed project site that appears to be impacted and obstructed by the proposed development of the property. We attended the public meeting held on April 18, 2022 and discussed our concerns with the USS Solar development project manager. We have also communicated by email with them about our concerns. The developer has been very pleasant and responsive to our communications but we have as of this date not received a proposed solution. As this irrigation lateral is essential to the continued farming of the HCW property, a solution needs to be found. For your information and use is USS Picadilly Solar LLC project Sheet C2.o1 dated 2/25/2022 prepared by Westwood Professional Services, Inc. titled Site Hydrology with annotations showing the approximate locations of the irrigation headgate, irrigation lateral alignment and conflict/impact area. We are assuming that this email meets weld County's requirements for written comments and objections to project applications under review. If we need to provide this information to weld County by letter please advise. Thanks for your attention to this matter. If I may be of service please let me know. Sincerely, Will Welch William T. Welch Program Manager 970/215-4099 1Vm T. Welch Company PROJECT NAVIGATION 7785 Highland Meadows Pkwyt Ste. 202 Windsor, CO 80528 EXHIBIT Applicant Video - https://youtu.be/OcNNI7pzblYM VIV7pzL lYM C i wutube.comiwatch?v=UcNtOpzbilYMaab_channel=USSolar W Intra Atcela Portal a CODE ® ICRIS W APPS FEMANEM_ E-PERIAIT CENTER 2: USGS The National... Enterprise aIS ArcOnline Motivatior Allian.e iheart gg SAN News ell YouTube Drone Tour of a Solar Garden 252 views Sep 14, 2020 Search 4 DISLIKE 4. SHARE 4- DOWNLOAD =+ SAVE ... Weld County Board of Commissioners 1150 O St P.O. Box 758 Greeley, CO 80631 Dear Weld County Board of Commissioners: a EXHIBIT 3 My name is Jesse Weilert and I live off Stagecoach Road in Willow Springs Estates with my wife and 2 sons. Our 2.5 acres is directly adjacent to the proposed Picadilly Solar Project. I recently learned about the proposed solar project and have attended two community meetings to better educate myself on the project and what to expect. The property proposed for this project, owned by Will Owens, has had several potential/rumored development plans over the years and, in my opinion, none have been as desirable as the current proposal. Solar is a good fit for our region based on sunlight potential and from a neighbor perspective there are some very desirable characteristics of the development. • Low/no noise and light pollution • Limited traffic to/from the site once construction is complete • Love profile panel design (< 8 ft) and no overhead powerlines within the solar field • very limited use of concrete and permeant structures • The potential for improved electrical infrastructure in the area • Ground cover of native grasses and wildflowers that will help maintain habitat for insects and birds. • Natural screening offerings to neighbors to help keep the line of sights as natural as possible. Although I do not speak for Willow Springs Estates or any specific neighbors in the area, I will say that (like myself) several others in the area have voiced similar positives about the project in comparison to other more intrusive development options. From a relationship perspective, LAS Solar has been very open to sharing information and taking the necessary time to cover questions and work with us to decide which screening options will be best for our property. Overall, I support the implementation of solar power as a part of Weld County's overall energy plan and feel that this solar project is a good option to balance economics that come with development and the respect to neighbors that desire to have a rural -agricultural feel. Based on this I am in support of the Board of County Commissioners approving the application for this solar project. Sincerely, Jesse Weilert 32723 Stagecoach Road Windsor, CO 80550 Hello