HomeMy WebLinkAbout20220166.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE
OF COUNTY ROAD 80 BETWEEN COUNTY ROAD 37 AND U.S. HIGHWAY 85
FOR APPROXIMATELY 3.5 MONTHS, FOR BRIDGE DEMOLITION AND
RECONSTRUCTION FOR COUNTY ROADS 80 AND 37 INTERSECTION PROJECT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 80, between County Road 37 and
U.S. Highway 85, be temporarily closed, with said closure being effective January 17, 2022,
through April 30, 2022, for the bridge demolition and reconstruction for the County
Roads 80 and 37 Intersection Project, and further, that standard official traffic control devices
shall be erected at said closure giving notice of the restrictions.
2022-0166
1 /27/22 EG0024
TEMPORARY CLOSURE - COUNTY ROAD 80
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 12th day of January, A.D., 2022.
ATTEST:
Weld County Clerk to the Board
Deputy Clerk to the Boa
AP
County 7kiorney
Date of signature:
BOARD OF COUNTY COMMISSIONERS
WELD OUNTY, COLORADO
Sco K. James, Chair
Derr , Pro -Tern
L. Buck
Steve More
Lori Saine
2022-0166
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: January 10, 2022
FROM: Clay Kimmi, Public Works Department
SUBJECT: BOCC Agenda Item
Structures, Inc. and Public Works is requesting permission to close the west leg of CR 80 from the
intersection with CR 37 from 01/17/2022 through 04/30/20 in order to demolish the existing bridge and
construct a new bridge as part of the CR 80 and CR 37 Intersection Project.
See attached closure diagram.
2022-0166
SUMMARY OF DEVICES
ti
MHT#1 MHT #1
3 -END ROAD WORK
9• ROAD WORK AHEAD ADVANCED WARNING
4 -VMS
REVISED 1/7/2022
ROM
wonR • 6No
85 X61 3E WORN
C7 - 36" % 16" 0)
6'J CD
1000 ft
WCR82/SH14
c�•y �j WCR82/SH14
DOUBLE
POSTED
Message AOM
g RViNOERK . —
•Panel 1 Panel 2 500 ft
G20 -la
WVRe,
R�AD
DETOUR XX/XX/XX eenowbnN N
AHEAD TO __ POSTEE
POSTED PROJECT LOCAIgN
FROM XX/xx/xx 500 n ' 500 n-
WCR 80 ROAD
WCR 80 1/2
ANKH
DOUBLE
POSTED
g Messa a fsoo n� If soon
RORp
Panel 1 Panel 2 1 woRN
ROM >N61
Week
ROAD XX/XX/XX 1»Fw
CLOSED TO
FROM XX/XX/XX
N-
()
Rata Type Distance Retw..n Signs
A B C U
U11iy9Oe 6taadl• 1W FM 100 Faet 100 Feat (�I� e
Urpan hI speedj 350 Feet Je0 Feel 3GG Fee: W"" 78 e
Expressway l Freeway 1000 feet I r50OFee1 i '_640 Feet
NOTES:
1) PLAN IS FOR ADVANCED WARNING AND ENDING SEQUENCE
SIGN PLACEMENT
2) EXACT PLACEMENT SHALL BE BASED ON ON SITE CONDITIONS,
OR AS APPROVED BY PROJECT ENGINEER
3) PLAN DRAWN BASED ON 2019, M&S STANDARDS, S-630.1,
CASE NO 24
4) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL
UTILIZE PROPER PPE IN ACCRDANCE WITH 05HA REGULATIONS
5) PLAN IS FOR BRIDGE REPAIR
6) WORKING HOURS AS APPROVED
71 WORKERS SHALL NOT CROSS LANES OF LIVE TRAFFIC
DURING THE WORK OPERATION
8) CONTRACTOR SHALL ENTER AND EXIT THE PROJECT
ATAPPROVED ACCESS POINTS AS PER THE PLANS OR
AS APPROVED BY THE PROJECT ENGINEER
9) SEE ADDITIONAL TCP'S FOR DETOUR DETAILS
10) MHT #1 SHALL WORK IN CONJUNCTION WITH
SUBSEQUENT TRAFFIC CONTROL PLANS
11) DEVICES SHALL MEET OR EXCEED MUTCD OR MASH COMPLIANT
AS REQUIRED
12) ON SITE ADJUSTMENTS SHALL BE MADE AS NEEDED
AND APPROVED
13) SIGN SPACING MAY BE MODIFIED TO FIT FIELD CONDITIONS
T
2a 500 ft
IXa a&1 ROAD
CO ROADWORK fl WORK
Co M 36"%19' NKw 0)
W M
Wale County
STRUCTURES
AWP
UP
AWP
Date: 1/6/2
Customer:
Type of Road: County Road
Traffic Volume: light to Moderate
AREA WIDE PROTECTIVE
J Legend
A Portable Sign Stand
F VMS
All signs & devices shall be placed in accordance with the latest provisions of the Manuel
on Uniform Traffic Control Devices (MUTCD) 4/or Colorado Department of Transportation
(C DOT)-M&S Standard Drawings with respect to any applicable provisions from
Weld County.
Access to residential and commercial driveways to be maintained at all times.
PLANS ARE NOT TO SCALE
Sheer 1 011
Co
a -. •
b•,}`' ,max. ji r
Weld County
Sig UCTURES
AP
NOTES:
1) ADVANCED WARNING PER SAINT 1
2) TRAFFIC PLAN IS BASED ON M A S STANDARDS
CASE 020 & 24, AND MUTCD TA NO. 20
3) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT
ON SITE CONDITIONS CHANGES ARE TO BE IMPLEMENTED
WHERE APPLICABLE, AS APPROVED BY ENGINEER
4)ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE
SHALL UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA
REGULATIONS
6) WORKERS SHALL NOT CROSS LIVE LANES OF TRAFFIC
ON FOOT WITHOUT THE ASSISTANCE OF FLAGGERS,
USING THE "BUDDY SYSTEM" OR A DESIGNATED CROSSWALK
6) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE
CLOSURE SWILL BE EQUIPPED WITH BACK UP ALARMS OR
UIILQE A SPOTTER
T) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK
OFF THE ROADWAY ON THE SAME SIDE AS THE CLOSURE
I) DURATION TO BE DETERMINED: WORKING HOURS ARE
DAYLIGHT HOURS
s) SIGNS SHALL BE SPACED A MINIMUM OF 100 FT OR AS
SPACE ALLOWS. AS APPROVED BY ENGINEER
10) ALL DEVICES SHALL MEET OR EXCEED MUTCD S MASH
COMPLIANT STANDARDS
II) NON -VEHICULAR ACCESS: BICYCLISTS ARE TO BE TREATED
AS A VEHICLE, PEDESTRIAN FACILITIES ARE TO BE MAINTAINED
WHEN POSSIBLE A VIABLE DETOUR ROUTE WILL BE PUT INTO
PLACE AS REQUIRED
12) PRIVATE ACCESS 15 W BE MAINTAINED AT ALL TIMES WITHIN
PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY
PROPERTY OWNER
13) EMERGENCY VEHICLES WILL BE OWEN THE RIGHT OF WAY
AS SOON AS IT IS SAFE TO DO 50
14) CLOSURES SHALL BE KEPT TO A MINIMUM IN BOTH LENGTH AND
DURATION
15) CONTRACTOR IS RESPONSIBLE FOR PROVIDING ENGINEER TO
VERIFY SAFE CONDITION PRIOR TO OPENING THE ROAD
.el x
( Dn a>m Ij
.
11
Inuol
aiA YYAd.I n a rw
k.50011 500ft,,Ais
•4
LpeE0 a DERWR ,
AHEAD WCR SO
1 P Ra-
(
J V�
J
OO
O O
m o
0
1e
ROaD
aosEo �
L enm'
500 ft
_� vE*ouR
\ o `
500 ft
500 ft ; 5
- . L Ii. R:.2 aM•
K as T .ti
T
H 500 ft - ! 500 ft ft
S
vno uA
500 ft
40AC
ec
arvEAc
Break Line A
AHEA
AREA WIDE PROTECTIVE
MHT #2
DETOUR
PHASE I
A
SUMMARY OF DEVICES
4- ROAD CLOSED AHEAD
4- DETOUR AHEAD
1 - ROAD CLOSED 600 FT
4- TYPE III BARRICADE
1 - ROAD CLOSED
1 - ROAD CLOSED TO THRU TRAFFIC
6- DETOUR RIGHT (M4-9)
6 -DETOUR LEFT (M4-9)
1 - DETOUR LEFT (M4-10)
1 - DETOUR EACH WAY (M4-10)
11- WCR 80
1 - NO LEFT TURN
1 -NO RIGHT TURN
DNS: 1/62
Cu66omar:
Type of Road. County Road
Traffc Volume Light to Moderate
Portable Sign Stand
DO Type III Barricade
09 Work Area
37 Bridge - Wald County, CO
AN signs & devices shag be placed in accordance with the latest provisions of the Manual
on Uniform Traffic Control Devices (MUTCD) Nor Colorado Department of Transportation
(CDOT)-M&S Standard Drawings with respect to any applicable provisions from
Weld Cougy.
Acuas to residential and commercial driveways to be maintained at all times.
PLANS ARE NOT TO SCALE
Sheet 1 of 2
Break Line A Break Line A
@..
COOT
s1RIKTURES
NOTES:
1)ADVANCED WARNING PER MHT 1
2) TRAFFIC PLAN 15 BASED ON M S 5 STANDARDS
CASE 020 & 24, AND MUTCD TA NO. 20
J) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT
ON SITE CONDITIONS CHANGES ARE TO BE IMPLEMENTED
WHERE APPLICABLE, A5 APPROVED BY ENGINEER
4) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE
SHALL UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA
REGULATIONS
5) WORKERS SHALL NOT CROSS LIVE LANES OF TRAFFIC
ON FOOT WITHOUT THE ASSISTANCE OF FLAOGERS,
USING THE "BUDDY SYSTEM" OR A DESIGNATED CROSSWALK
6) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE
CLOSURE SHALL BE EQUIPPED WITH BACK UP ALARMS OR
UTILIZE A SPOTTER
7) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK
OFF THE ROADWAY ON THE SAME SIDE AS THE CLOSURE
8) DURATION TO BE DETERMINED: WORKING HOURS ARE
DAYLIGHT HOURS
S) SIGNS SHALL BE SPACED A MINIMUM OF 100 FT OR AS
SPACE ALLOWS, AS APPROVED BY ENGINEER
t0) ALL DEVICES SHALL MEET OR EXCEED MUTCD & MASH
COMPLIANT STANDARDS
11) NON-VEHCULAR ACCESS: BICYCLISTS ARE TO BE TREATED
AS A VEHICLE, PEDESTRIAN FACILJTIES ARE TO BE MAINTAINED
WHEN POSSIBLE A VIABLE DETOUR ROUTE WILL BE PUT INTO
PLACE AS REQUIRED
12) PRIVATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN
PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY
PROPERTY OWNER
13) EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY
AS SOON AS IT IS SAFE TO DO $0
14) CLOSURES SHALL BE KEPT TO A MINIMUM IN BOTH LENGTH AND
DURATION
15) CONTRACTOR IS RESPONSIBLE FOR PROVIDING ENGINEER TO
VERIFY SAFE CONDITION PRIOR TO OPENING THE ROAD
CR
78
f
t
MHT]E1
DETO
PHAS
*� �' e ). SUMMARY OF DEVICES
MHT#2
4 -ROAD CLOSED AHEAD
- ^ - 4- DETOUR AHEAD
1 -ROAD CLOSED 600 FT
4- TYPE III BARRICADE
1 - ROAD CLOSED
1- ROAD CLOSED TO THRU TRAFFIC
6 -DETOUR RIGHT (M4-$)
��' 6- DETOUR LEFT (M4-9)
• f1 -DETOUR LEFT(M4-10)
1 -DETOUR EACH WAY (M4-10)
�' 11-WCR80
1 -NO LEFT TURN
1- NO RIGHT TURN
AREA WIDE PROTECTIVE
Portable Sign Stand
Type III Barricade
Work Area
37 Bridge - Weld County. CO
•W1 Type of RCounty Road
. --- ' Ium Light t TrafficTraVoume: to Moderate
1 85, ! All signs S devices shall be placed in accordance with the latest provisions of the Manuel
II on UNlorm Traffic Control Devices (MUTCD) Idor Colorado Department of Transportation
(COOT)-M&S Standard Drawings with reaped to any applicable provisions from
Weld County.
Access to residential and commercial driveways to be maintained at all times.
PLANS ARE NOT TO SCALE Sheet 2 of 2