Loading...
HomeMy WebLinkAbout20222814.tiffRESOLUTION RE: ACTION OF THE BOARD CONCERNING REGULATING, WARNING AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROAD 50 BETWEEN COUNTY ROADS 53 AND 55 FOR APPROXIMATELY FIVE (5) DAYS, FOR CULVERT REPAIR WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, and WHEREAS, at a hearing held on the 10th day of October, 2022, the Board found that the temporary closure of County Road 50, between County Roads 53 and 55, with said closure to be effective October 24, 2022, for approximately five (5) days for a culvert repair, be continued to October 17, 2022, at 9:00 a.m., to allow staff further time for project review. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, that the temporary closure of County Road 50, between County Roads 53 and 55, with said closure to be effective October 24, 2022, for approximately five (5) days for a culvert repair, be, and hereby is, continued to October 17, 2022, at 9:00 a.m. cc:5O(RS) ,C5p 10/14 /2Z 2022-2814 EG0024 CONTINUE TEMPORARY CLOSURE - COUNTY ROAD 50 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 10th day of October, A.D., 2022. BOARD OF COUNTY COMMISSIONERS WD COUNTY, COLORADO ATTEST: ditko ' ;„k, Weld County Clerk to the Board ounty Attorney Date of signature: 1O/14 /22 bottt K. James, Chair eman, Pro - 2022 -2814 EG0024 MEMORANDUM TO: Clerk to the Board DATE: October 5, 2022 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 50 between WCR 53 and WCR 55 closed 10/24/2022 thru 10/28/2022 for culvert repair. See attached diagram. 2022-2814 101(0 Ci OUZy www.invarion.com assaults _ W20-3 ',VCR 48 ! _S a . e e -e arli 1.a' t a-45-a'SS W20 -1F an0laa aae- -t s - W20-3 W20 -1F Vi CR 56 d a to I I IX !O W20 -1F I 2 3 a JUL— If O of • 1 I $ a WCR 4Es Los WGR4.8 • .� w ...Can �. +r a are- -s a 40 • a�-+�- i la r a "ea S. a. s as --1r .s L o s e ■ u . 11. a . -* s e .J •i.a�. a • • 'SS O 0 1 c I 1.11 W20 -1F INSPECTION: DATE, REMARKS, INSPECTOR INITIALS ,PROJECT # AN -59 ROAD CLOSURE DESCRIPTION closed for WCR culvert 50 10/24/2022 between repair WCR thru 53 and 10/28/2022 WCR 55 NOTICE TO PUBLIC Road Message signs and boards barricaded to be used DETOUR ROUTE WCR WCR WCR 53 48 55 between between between WCR WCR WCR 50 and 53 and 50 and WCR WCR WCR 48 55 48 1 1 1 mile mile mile paved gravel gravel NOTES. ADT Culvert Water Culvert of to WCR replaced is be .1 used 623/2019 Mile is irrigation: for east dust is: of WCR controll with 53 new on 12" WCR PVC 50 pipe 10/5/2022 Prepared by: Ryan Reynolds Hello