Loading...
HomeMy WebLinkAbout20231698.tiffMEMORANDUM TO: Clerk to the Board DATE: June 7, 2023 FROM: Public Works Department SUBJECT: End of Month Report For the month of May 2023, the following roads were closed less than 72 hours. •WCR 16 between WCR 15 and WCR 17 was closed from 5/16/2023 thru 5/18/2023 for culvert replacement. See attached diagram. For the month of May 2023, the following roads were closed due to emergency repairs caused by flooding: •WCR 76 between WCR 51 and WCR 53 was closed from 5/10/2023 thru 5/12/2023 for flooding. •WCR 48 between WCR 43 and WCR 45 was closed from 5/11/2023 thru 5/13/2023 for flooding. No diagrams were made for these closures due to emergency. Re% rl-5 06/21(23 2023-1698 www.invarion.com • d ujuK\JAW CM p,1M f- a"' a Lit A u o it Q 4 W • a sit ca Q0 Z Z 40 ROHOEROSA ST L, _L ,,,«,,ta, , H ti - ri r t t+; I I d I wcR r>1aa♦♦--i�aasL-mat IJAdis IS r aJ.1.f_aa.11ka 16 Soli s-"-tIL II J W20-3 W20-3 M4-10 PROJECT #AN -59 ROAD CLOSURE DESCRIPTION WCR closed for Emergency 16 5/10/2023 between culvert WCR thru 5/12/2023 replacement 15 and WCR 17 NOTICE TO PUBLIC Road signs and barricaded DETOUR ROUTE WCR SH WCR 52 15 between 17 between between WCR WCR SH 16 15 and 52 and and WCR WCR SH 52 1 17 1 16 1 mile mile mile paved paved gravel NOTES: ADTofWCR Culvert New: Culvert 18"CSPA is replaced .3 west is. 455/2020 is of irrigation: WCR Old: 15 18" ARCH CMP Prepared 5/9/2023 by: Ryan Reynolds Hello