HomeMy WebLinkAbout20231698.tiffMEMORANDUM
TO: Clerk to the Board DATE: June 7, 2023
FROM: Public Works Department
SUBJECT: End of Month Report
For the month of May 2023, the following roads were closed less than 72 hours.
•WCR 16 between WCR 15 and WCR 17 was closed from 5/16/2023 thru 5/18/2023 for culvert
replacement.
See attached diagram.
For the month of May 2023, the following roads were closed due to emergency repairs caused by
flooding:
•WCR 76 between WCR 51 and WCR 53 was closed from 5/10/2023 thru 5/12/2023 for flooding.
•WCR 48 between WCR 43 and WCR 45 was closed from 5/11/2023 thru 5/13/2023 for flooding.
No diagrams were made for these closures due to emergency.
Re% rl-5
06/21(23
2023-1698
www.invarion.com
•
d
ujuK\JAW CM
p,1M
f-
a"' a
Lit A
u o
it Q
4 W
• a
sit
ca
Q0
Z Z
40
ROHOEROSA ST
L, _L ,,,«,,ta, ,
H
ti -
ri
r
t
t+;
I
I
d
I
wcR
r>1aa♦♦--i�aasL-mat IJAdis IS r aJ.1.f_aa.11ka 16 Soli s-"-tIL II J
W20-3 W20-3
M4-10
PROJECT
#AN
-59
ROAD CLOSURE
DESCRIPTION
WCR
closed
for
Emergency
16
5/10/2023
between
culvert
WCR
thru
5/12/2023
replacement
15
and
WCR
17
NOTICE
TO
PUBLIC
Road
signs
and
barricaded
DETOUR ROUTE
WCR
SH
WCR
52
15
between
17
between
between
WCR
WCR
SH
16
15 and
52 and
and
WCR
WCR
SH
52 1
17 1
16 1
mile
mile
mile
paved
paved
gravel
NOTES:
ADTofWCR
Culvert
New:
Culvert
18"CSPA
is
replaced
.3
west
is.
455/2020
is
of
irrigation:
WCR
Old:
15
18"
ARCH
CMP
Prepared
5/9/2023
by:
Ryan
Reynolds
Hello