HomeMy WebLinkAbout20233287.tiff RESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING EXTENSION OF TEMPORARY CLOSURE OF COUNTY ROAD 7 BETWEEN COUNTY ROAD 48 AND STATE HIGHWAY 56 FOR APPROXIMATELY AN ADDITIONAL THREE(3)WEEKS, FOR UNANTICIPATED ADDITIONAL ROAD WORK AND SUPPLY DELAYS WHEREAS,the Board of County Commissioners of Weld County,Colorado,pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County,Colorado,and WHEREAS,pursuant to C.R.S.§42-4-106(6)(a): "...local authorities,with their respective jurisdiction may,for the purpose of road construction and maintenance,temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall,in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...",and WHEREAS,on the 25th day of September,2023,pursuant to said statute and upon the basis of traffic and personnel investigations,the Board determined that conditions exist which made it necessary to temporarily close County Road 7, between County Road 48 and State Highway 56,to through traffic and to regulate,warn and guide vehicular traffic by posting signs thereon,with said closure being effective October 9,2023,for approximately one(1)month for culvert replacements and road work,and WHEREAS,on the 6th day of November,2023,pursuant to said statute and upon the basis of traffic and personnel investigations,the Board has determined that conditions continue to exist which make it necessary to extend said temporary closure of County Road 7,between County Road 48 and State Highway 56,with said extended closure being effective November 9, 2023, for approximately an additional three (3) weeks through December 2, 2023, for unanticipated additional roadwork and supply delays,and further,that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. NOW,THEREFORE,BE IT RESOLVED that the Board of County Commissioners of Weld County,Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads and any intersections thereof,and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate,warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. cc•.So(as),D:SPo.-ci,Gs p 2023-3287 i �l I/23 EO0024 EXTEND TEMPORARY CLOSURE-COUNTY ROAD 7 PAGE 2 BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the closure of County Road 7, between County Road 48 and State Highway 56,be,and hereby is,extended,with said extended closure being effective November 9,2023,for approximately an additional three(3)weeks through December 2,2023,for unanticipated additional roadwork and supply delays,and further,that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 6th day of November,A.D.,2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY,COLORADO ATTEST: detiLsj C,s`eito;� EXCUSED ��G[ Mike Freeman,Chair Weld County Clerk to the Board 4?AitifrS'el43.14.P.A BY: tOC1A,1,67c-k— Perry L.Buck,Pro-Tem Deputy Clerk to the Board �.•�,,,�� ,/��•1tK.Jam AP ED A •�. M: # , tip,,; +� �� vi .Ross Po County' orney " ~� �� r) i\ Saine Date of signature: I T i Z3 '�•■►�"'i 2023-3287 EG0024 f MEMORANDUM if r : TO:Clerk to the Board DATE:November 2,2023 a', r FROM: Amy Mutchie,Public Works Department 1,4 SUBJECT: BOCC Agenda Item Weld County Public Works is requesting approval from the board for an extension for the closure on WCR 7 between WCR 48 and SH 56.The project is taking longer than previously anticipated due to more profiling and widening work,and the distance that the trucks are having to drive to bring in the material for the job is causing a delay. The original closure dates were 10/09/2023 thru 11/09/2023 and the requested extension will be to 12/02/2023. See attached closure diagram. 2023-3287 k 1/Co EG ooC-I- www.invarion.com[it O - iT�Trf1Ti _ �._ a - - a - ! M4-103 DfTGIJR ; f-' . ' JJfi-i M4-103 I 3- ..3M4 9 t% i i s al Jed �,--- IF rn� rW20-3 '� V • • i I NI ' a • 4, aY J aC - - :—II- i r W20-3 L 1`�j t , - .- - - - . . . . . PROJECT # rc-127 t '� PJ WCR 48 .. . n . 1 R W20- 1F c" 4 9 . /11 ROAD CLOSURE DESCRIPTION aII , a 1 WCR7 between WCR 48 and SH 56 • ' ; Closed 10/9/2023 thru 12/1 /2023 i r i for culverts replacement and road work w NOTICE TO PUBLIC• r • • • I a r Road signs and barricaded , v l • 9 rei' vtr. I WCR48 Message Boards to be used � a - t417.14... • �a-iii.+ ♦!►Oaa .L4a �fs . 11.i-♦LS • aa t . .i�� -�♦ � if � i e • 6aw. <a ..... .....se-♦�a � �Af�i . �a♦�-111 -0•0,0 I ,. �' DETOUR ROUTE I a 41, / • � . r...:A. + " 4 a W20- 1F t44-103 $ 1 I SH 56 between WCR 7 and WCR 3 2 miles paved WCR 3 between SH 56 and SH 60 I 3 mile gravel a SH 60 between W CR 3 and WCR 7 2 milespaved i l ; rTC V V ' N _ I a + i I: 'TH' a a ADT of WCR is: 1665/2022 1741; I ;� , M.,� �:. �.Setae Culvert replaced is Drainage: OLD: 36" , 18", 30 t, _ - - - � M4-y --- -,�__ _ -T - - . - - a - _ ARCH CMP -a~ `-ice Pd M4-103 M4-10 ira ?' Water to be used for dust control M4- 103 Iiil Se W20- 1F ; I Cif 8 Prepared by: Ryan Reynolds 9/20/2023 Hello