Loading...
HomeMy WebLinkAbout740570.tiff RESOLUTION WHEREAS, heretofore and on May 16, 1973, by Resolution, the Board of County Commissioners, Weld County, Colorado, did authorize the execution of a contract and agreement with Livingston Construction Co. , Fort Collins, Colorado, to construct the Weld County Public Health Building and to pay therefor from Federal Sharing Revenue Funds, all pursuant to proper advertisement for bids in accordance with statutes for said purpose, and WHEREAS, it has now come to the attention of the Board that said construction of the aforementioned building is subject to AIA Document G701 concerning Change Order No. 6, with reference made to Architect's Project No. 73-1 -CCA-0118 concerning complete con- struction work and further reference made to contract date of September 17, 1973, copies attached hereto for ready reference, and WHEREAS, in order to be in compliance with the Federal Law, the Board believes it to be in the best interest of the County to incorporate the aforementioned Change Order No. 6 within the contract and agreement previously entered into with Livingston Construction Co. NOW, THEREFORE, BE IT RESOLVED, by the Board of County Commissioners, Weld County, Colorado, that Change Order No. 5 here- inabove mentioned and made a part hereof by reference, be and the same hereby is ordered to be made a part of the contract and agreement here- tofore mentioned and entered into between Weld County and Livingston Construction Co. for the erection of the Weld County Public Health Building. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 3rd day of April, A. D. , 1974. BOARD OF COUNTY COMMISSIONERS WELD 9O�UNTY, COLORADO ATTEST / Weld County Clerk and Recorder and Clerk to the Board Ciat(inot_Liki Deputy Cou y Clerk APPROVED AS TO F�uM Ceunty Att ey- 740570 o e. CHANGE OWNER ARCHITECT ORDER CONTRACTOR ID FIELD �x AM DOCUMENT G701 • OTHER x CCA PROJECT: Weld County Public Health CHANGE ORDER NUMBER: Six (6) (name,address) 16th Street and Hospital Road Greeley, Colorado 80631 TO (Contractor) [—Livingston Construction, Inc. ARCHITECT'S PROJECT NO: 73 1 CCA 0118 P. 0. Box 1951 CONTRACT FOR: Complete Construction Work Fort Collins, Colorado 80521 L I CONTRACT DATE: September 17, 1973 You are directed to make the following changes in this Contract: • 1. Provide all labor, materials, and equipment necessary to install three duplex receptacles to the project. One duplex receptacle in Room No. 166, one in Room No. 170, and one in Room No. 171. These receptacles are to be used to . power x-ray view boxes. ADD: $242.00 2. Provide all labor, amterials, and equipment necessary to provide electrical service to the 3/4 H.P. boiler blower motor located in Room No. 137. ADD: $347.00 • 3. Provide all labor, materials, and equipment necessary to relocate an existing • floor drain in Room No. 137. ADD: $178.00 • TOTAL ADD: $767.00 • The original Contract Sum was $ 673,700.00 Net change by previous Change Orders • $ 12,953.64 The Contract Sum prior to this Change Order was $ 686,653.64 The Contract Sum will be (increased) (sdstwxasedk(ucxiaed) by this Change Order . . $ 767.00 The new Contract Sum including this Change Order will be $ 687,1420.64 The Contract Time will be (:icaceearl1 Cdarti7:asef) (unchanged) by ( 0 ) Days. The Date of Completion as of the date of this Change Order therefore is October 31, 1974 CNC/NHPQ, INC. _ Livingston Construction, Inc. Weld County Commissioners ITE�T CONTRACTOR OWNER Mil Clubhouse Drive P. O. Box 1951 Weld. County Courthouse Address Address Address Greeley Colorado 8063 Fort Collins Colorado 80521 Greeley, Colorado 80631 BY • BY 'L^1�' BY I6€Lt o ;� C�- DATE •3-24 . 7 y DATE /Y14 �y s f /%7k DATE — — MA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • AIA@ • © 1970 • THE ONE PAGE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 Hello