Loading...
HomeMy WebLinkAbout20231255.tiffCoMMU( ; cost-;or1 S 05/0V/23 owN.na v,.. One Williams Center MD WRC2-6 Tulsa, OK 74172 Mobile 816-500-4796 April 27, 2023 RE: Courtesy Notification for Overland Pass Pipeline LLC Dear Landowner or Lessee: Williams Field Services Company, LLC, ("Williams"), as Operator for Overland Pass Pipeline Company LLC, is about to begin an assessment via launching an inline inspection (ILI) tool run, also described as pigging. The ILI's progress will be tracked by accessing above ground markers every one-half (1/2) mile along the right of way. Once the ILI tool run is complete, the above ground markers will be retrieved on the date of the assessment. This notice is being provided as a courtesy to inform all landowners of our intent to inspect and survey the pipeline Right of Way located on your property. The inspection is necessary to ensure the continued safety of the pipeline system. The inspections are planned to begin May 6th through May 15th, 2023. The inspections will require that our employees drive, walk or cross your property along the right-of-way in pickups, on four wheelers, or on foot in order to perform the inspections. Please be aware that these dates may change slightly due to unforeseen circumstances, but our goal is to accomplish this work as quickly as possible. If inspection of the pipeline and the right-of-way determines that certain areas need repairs or further review, you will be notified by our representatives before any repair work begins. We appreciate your cooperation in this matter and look forward to our continued good neighbor relationship with you and the other landowners along the Overland Pass pipeline system. If you should have any questions regarding the scope of work to be performed or if we may be of assistance in any way, including which properties are going to be inspected, please do not hesitate to contact Chris Roberts at (816) 500-4796 or email at Chris.robertsl@williams.com. Sincerely, Chris Roberts Contract Land Representative Overland Pass Pipeline, LLC C c : SG ('c -t/56) pL (T7/MN) PW (c H/ER) OS/o4 123 2023-1255 Weld County Public Works Department 1111 H Street Greeley Colorado 80632 Hello