Loading...
HomeMy WebLinkAbout20232488.tiffCOLORADO Department of Public Health & Environment Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 August 18, 2023 To Whom it May Concern: RECEIVED AUG 18 2023 WELD COUNTY COMMISSIONERS On August 18, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for Noble Energy, Inc. - WELLS RANCH BB11 ECONODE T5N-R63W-S11 L01. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 vvvvw.colorado.gov/cdphe Pub`.,Jared Polis, Governor , Jill Hunsaker Ryan, MPH, Executive Director D$I'y��Z3 Ce1. I�L(TF(N1.MH-L (DSlLL), "PN&i. C tia I Cot C,K 'Dp I -.), 01, Gs M> D -B Izz(z3 MtM.M Air Pollution Control Division g `+ • its Notice of a Proposed Project or Activity Warranting Public � Comment Website Title: Noble Energy, Inc. - WELLS RANCH BB11 ECONODE T5N-R63W-S11 L01 Weld County Notice Period Begins: August 18, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Noble Energy, Inc. Facility: WELLS RANCH BB11 ECONODE T5N-R63W-S11 L01 Well Production Facility SWNW Section 11, Township 5N, Range 63W Weld County The proposed project or activity is as follows: Applicant requests to modify permit 18WE0830 by decreasing requested throughput for point 004 (gas venting). Point 002 will be removed from this permit issuance, since it was removed from site and cancelled in 2020. The facility is in the severe ozone nonattainment area and is synthetic minor for NOx and VOC NANSR and OP programs, as well as CO OP. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 18WE0830 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe apcd_airpermitcomments@state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 1 1 COLORADO Department of Public Health 6 EnvSron Zt. NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 2 I a COLORADO =„7=1 Hello