August 18, 2023
To Whom it May Concern:
RECEIVED
AUG 18 2023
WELD COUNTY
COMMISSIONERS
On August 18, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Noble Energy, Inc. - WELLS RANCH BB11 ECONODE T5N-R63W-S11 L01. A copy of this public notice is
enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 vvvvw.colorado.gov/cdphe
Pub`.,Jared Polis, Governor , Jill Hunsaker Ryan, MPH, Executive Director
D$I'y��Z3 Ce1. I�L(TF(N1.MH-L (DSlLL),
"PN&i. C tia I Cot C,K 'Dp I -.), 01, Gs M>
D -B Izz(z3
MtM.M Air Pollution Control Division
g
`+ • its
Notice of a Proposed Project or Activity Warranting Public
�
Comment
Website Title: Noble Energy, Inc. - WELLS RANCH BB11 ECONODE T5N-R63W-S11 L01 Weld County
Notice Period Begins: August 18, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Noble Energy, Inc.
Facility: WELLS RANCH BB11 ECONODE T5N-R63W-S11 L01
Well Production Facility
SWNW Section 11, Township 5N, Range 63W
Weld County
The proposed project or activity is as follows: Applicant requests to modify permit 18WE0830 by decreasing
requested throughput for point 004 (gas venting). Point 002 will be removed from this permit issuance, since
it was removed from site and cancelled in 2020. The facility is in the severe ozone nonattainment area and
is synthetic minor for NOx and VOC NANSR and OP programs, as well as CO OP.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 18WE0830 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd_airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 1 1
COLORADO
Department of Public
Health 6 EnvSron Zt.
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.