Loading...
HomeMy WebLinkAbout20231929.tiffS-MGM M, elo COLORADO Department of Public Health Et Environment Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 June 23, 2023 To Whom it May Concern: RECEIVED JUN 2 3 2023 WELD COUNTY IOMMISSIONERS On June 23, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for Noble Energy, Inc. - D22 -13-A Econode T3N-R64W-S22 L01. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. .of co., 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Potis, Governor I Jilt Hunsaker Ryan, MPH, Executive Director L'i'p E+L (1)5 J LL') 2023-1929 Pkl (, I G-1- J cA I DD/n N)1 o f! J MO '7I1lz3 „7„,. a- Pollution Control Division `''� Notice of a Proposed Project or Activity Warranting Public � Comment Website Title: Noble Energy, Inc. - D22 -13-A Econode T3N-R64W-S22 LO1 - Weld County Notice Period Begins: June 23, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Noble Energy, Inc. Facility: D22 -13-A Econode T3N-R64W-S22 LO1 Well Production Facility SWSW quadrant of Section 22, Township 3N, Range 64W Weld County The proposed project or activity is as follows: Request to lower throughput for points 002 (produced water tank) and 004 (heater treater and surge drum gas streams). The previously permitted emission factors will be maintained for both points. Point 003 will be removed from the facility wide permit, as it has fallen below APEN reporting thresholds. This facility is in the severe ozone nonattainment area and is synthetic minor for VOC NANSR, PSD, and OP programs, as well as synthetic minor for n -hexane. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 19WE0964 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation • Send an email to cdphe apcd airpermitcomments®state.co.us • Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 1 COLORADO Department of Publle Health 6 Envf:=tt NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 2 Is COLORADO Deyxtrnent of Publ3e Health 6 Env(ronment Hello