HomeMy WebLinkAbout20231231.tiffSY'
COLORADO
Department of Public
Health Es Environment
Weld County - Clerk to the Board
1150O St
PO Box 758
Greeley, CO 80632
April 27, 2023
To Whom it May Concern:
RECEIVED
APR 2 7 2023
WELD COUNTY
COMMISSIONERS
On April 27, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Crestone Peak Resources Operating, LLC - Herren 1A -33H 41 33. A copy of this public notice is
enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
Pvbl;C Rev:ec)
O5/03/23
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
cc:PLere/Mw) HL(bs) O6 OA,
PW (CH/ER/cK/oo/oN)
0.4/2% /23
2023-1231
4441
Notice of a Proposed Project or Activity Warranting Public
-
Comment
Air Pollution Control Division
Website Title: Crestone Peak Resources Operating, LLC - Herren 1A -33H 41 33 - Weld County
Notice Period Begins: April 27, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Crestone Peak Resources Operating, LLC
Facility: Herren 1A -33H 41 33
Well Production Facility
SENE quadrant of Section 33, Township 3N, Range 67W
Weld County
The proposed project or activity is as follows: Initial permit application for low pressure separator venting.
The gas is sent to an enclosed combustor during vapor recovery unit (VRU) downtime, but for the purposes
of this application, it will be conservatively estimated that the VRU is down 100% of the time. This facility is
synthetic minor for VOC OP and NANSR programs.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 21WE0368 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe apcd airpermitcomments@state.co.us
• Send written comments to our mailing address:
Air Pollution Control Division - Oil a Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02
„ Km
COLORADO
Department of Publle
Health 6 Environment
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
I SC
COLORADO
Department of Pu6Lt:
Health & Envltonment
Hello