Loading...
HomeMy WebLinkAbout20232315.tiffUSE BY SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE, AMOUNT APPLICATION RECEIVED BY DATE RECEIVED. CASE # ASSIGNED: PLANNER ASSIGNED: PROPERTY INFORMATION Is the property currently in violation? N No I Yes Violation Case Number: Parcel Number: 0' 6 3 _ 1 7 = 2 Site Address: 25490 CR 58 Greeley CO 80631 0 0 0 0 2 Legal esori pti n : Lot A and B Rec Ex 4672 Section: 17 , Township 5 N, Range 6 64 Zoning District: ag Acreage: 79 Within subdivision or townsite? No / Ill Yes Name: Water (well permit # or water district tap #): Central Weld Sewer (On -site wastewater treatment system permit # or sewer account #): Floodplain No / II Yes Geological Hazard No I Yes Airport Overlay No /Yes PROJECT USR Use being applied for: Future Building and Expansion of Storage Yard Name of proposed business: M and M Excavation PROPERTY OWNER(S) (Attach additional sheets if necessary.) Name: Terry Miller Company: M and M Excavation Phone #: 970-539-2302 Email: terry@mmexcavation.com Street Address: 25490 CR 58 City/State/Zip Code: Greeley Co 80631 APPLICANT/AUTHORIZED AGENT (AuthorizationForm must be included f there is an Authorized Agent) Name: Eric Werrsman Company: Wernsman Engineering and Land Development LLC Phone #: 9nn-539-2655 Email: ejwems25@gmail.com Street Address: Po Box 105. City/State/Zip Code: LaSalle CO 80651 I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our) knowledge. All fee owners of the property must sign this application. If an Authorized Agent signs, an Authorization Form signed by all fee owners must be included with the application. If the fee owner is a corporation, evidence must be included indicating the signatory has the legal authority to sign for the corporatin. Signat� _ Terry )111 Print Print ure r1 C trottestriss ter A. siert tits.. 3 Dat 12/15/21 9 Owne ' ignature AUTHORIZATION FORM I, me), Terry Miller (Owner — please print) DEPARTMENTS OF PLANNING BUILDING, DEVELOPMENT REVIEW AND ENVIRONMENTAL HEALTH 1555 NORTH 17TH AVENUE GREELEY, CO 80631 give permission to Eric'ernsrnan (Authorized Agent/Applicant—please print) to apply for any Planning, Building, Access, Grading or OWTS permits on our behalf, for the property located at (address or parcel number) below: 25490 Cr 58 Lot AandB�RecEsc4672 1 5 64 Township N. Range Subdivision Name: Lot Block Property Owners Information Address: Terry Miller Phone:9M-539-2302E-mail: terry@rnmexcavation.com Authorized Agent/Applicant Contact Information: Address: Eric Wernsman Phone: 970-539-2656 Correspondence to be sent to: Owner E�l' ail: ejwerns25@gmail.com Authorized Agent/Applicant Ja by: Mail Email Additional Info: Please email to both Terry Miller and Eric Wernsman I (We) hereby certify, under penalty of perjury and after carefully reading the entire contents of this document, that the information stated above is true and correct to the best of my (our) knowledge. Date V/ & .Z) Date Owner Signature Subscribed and sworn to before me this i (p day of Pflo4c,h Teat M. t ter My commission expires 01 109/ 7pa S CANDENCE LYNN HOOD Notary Public State of Colorado Notary ID # 20214003868 My Commission Expires 01-29-2025 20 (93 by Notary Public MUST BE TYPED FILING FEE: $50.00 MUST SUBMIT TWO COPIES Please include a typed self-addressed envelope Mail to: Secretary of State Corporations Section 1560 Broadway, Suite 200 Denver, Co 80202 (303) 894-2251 Fax (303) 894-2242 ARTICLES OF ORGANIZATION For office use only 19971172.215 0.00 -z n a t ■ r r 1� 2 f 16:21:12 I/We the undersigned natural person(s) of the age of eighteen years or more, acting as organizer(s) of a limited liability company under the Colorado Limited Liability Company Act, adopt the following Articles of Organization for such limited liability company: FIRST: The name of the limited liability company is: M & M Excavation Co. LLC SECOND: Principal place of business (if known): 1431 E. 16th S t . THIRD: Greeley, CO 80631 The street address of the initial registered office of the limited liability company is: 1431 E. 16th St. Greeley, CO 80631 The mailing address (if different from above ) of the initial registered office of the limited liability company is: P.O. Box AA Greeley, CO 80632 The name of its proposed registered agent in Colorado at that address is: Michael Miller FOURTH: The management is vested in managers (check if appropriate) FIFTH: The names and business addresses of the initial manager or managers or if the management is vested in the members, rather than managers, the names and addresses of the member or members are: NAME Michael D. Miller Terrance S. Miller SIXTH: The name and address of each organizer is: NAME Michael D. Miller etliSigned Organizer ‘Dtevacaks it r ADDRESS (include zip codes) 2650 64th Ave. Greeley, CO 80634 200 N. 35th Ave. #104 Greeley, CO 80634 ADDRESS (include zip code) 2650 64th Ave. Greeley, CO 80634 Signed Organizer USE BY SPECIAL REVIEW (USR) PLANNING QUESTIONNAIRE Answer the following questions per Section 23-2-260. A, B, C & E of the Weld County Code. Please type on a separate sheet. If a question does not pertain to your proposal, please respond with an explanation — do not leave questions blank. 1. Explain the proposed use and business name. The site currently serves as a base of operation and storage yard for M and M Excavation an Excavation and Trucking Company that mainly constructs Oil and Gas Pad Sites. M and M self performs repairs on its earth moving equipment and trucking fleet. The future building will be used for additional storage space of equipment and or trucks that are being repaired or waiting on parts to complete the repairs. Up to 12 Tractor Trailers 2 Scrapers, 2 loaders, 4 Bulldozers, 2 motor graders, 2 excavators, 2 backhoes and 6 flatbed semi trailers and 6 trailers that are pulled behind pickups could be stored on the site. Equipment may be stored indoors and/ or outdoors 2. Explain the need for the proposed use. Please see #1 3. Describe the current and previous use of the land. The site has been the base of operations for M and M Excavation since approx. 2012 4. Describe the proximity of the proposed use to residences. There is a residence to the north of the site that will be submitting a letter of approval for the expansion. 5. Describe the surrounding land uses of the site and how the proposed use is compatible with them. There is a farm/ residence to the north of the site. Dryland and Irrigated Farm land is along the east south and west sides. A silage stockpile site is near the north east corner of the site. 6. Describe the hours and days of operation (i.e. Monday thru Friday 8:00 a.m. to 5:00 p.m.). The facility will be open 6 am to 7:00 PM Monday through Friday and 6:00 am to 12:00 pm Saturday 7. Describe the number of employees including full-time, part-time and contractors. If shift work is proposed, detail number of employees, schedule and duration of shifts. No shift work is planned. There will be up to 10 employees on site during business hours and 30 employees that may visit the site during the day to report to work and collect equipment and leave. Describe the maximum number of users, patrons, members, buyers or other visitors that the site will accommodate at any one time. There could be up to 45 total people that could access the site on a dairy basis 9. List the types and maximum numbers of animals to be on the site at any one time (for dairies, livestock confinement operations, kennels, etc.). The owner has 2 dogs that visit the site. 10 List the types and number of operating and processing equipment. The site will have small machining equipment used tor diesei and hydraulic repair purposes 11. List the types, number and uses of the existing and proposed structures. A 10,800 s.f. building is existing and is used for office, equipment repair and equipment storage. A 6000 s.f. building is planned -ior equipment storage and parts storage. 12. Describe the size of any stockpile, storage or waste areas. Up to 4000 gallons of Waste oil is stored long enough to be used for heating the facility. Trash is disposed of weekly. 13. Describe the method and time schedule of removal or disposal of debris, junk and other wastes associated with the proposed use. -.lease see # 12 14. Include a timetable showing the periods of time required for the construction of the operation. It is anticipated that the building d rid site work will be completed by 10/2024 12/15/21 13 USE BY SPECIAL REVIEW (USR) PLANNING QUESTIONNAIRE 15. Describe the proposed and existing lot surface type and the square footage of each type (i.e. asphalt, gravel, landscaping, dirt, grass, buildings). Grass 30,314 Roofs 27,600 Concrete Surfaces 16,353 Driveways, Gravel 177,456 Total Area 240,923 16. How many parking spaces are proposed? How many handicap -accessible parking spaces are proposed? 17. Describe the existing and proposed fencing and screening for the site including all parking and outdoor storage areas. The existing buildings screen the site from CR 58. A new screening fence will be placed along the north side of the storage yard expansion. 18. Describe the existing and proposed landscaping for the site. There are existing trees along the north side of the current site. 19. Describe reclamation procedures to be employed as stages of the operation are phased out or upon cessation of the Use by Special Review activity. The storage yard could have the gravel reclaimed and the building and foundation could be removed. 20. Describe the proposed fire protection measures. The new building will be designed with fire wall separation to mitigate the need for a sire sprinkler 21 Explain how this proposal is consistent with the Weld County Comprehensive Plan per Chapter 22 of the Weld County Code. Weld County code allows for certain uses in the ag district via the USR process 22. Explain how this proposal is consistent with the intent of the zone district in which it is located. (Intent statements can be found at the beginning of each zone district section in Article III of Chapter 23 of the Weld County Code.) Weld County code allows for certain uses in the ag district via the USN process 23. Explain how this proposal will be compatible with future development of the surrounding area or adopted master plans of affected municipalities. The existing site has functioned for over 10 years in it's current location with no issues. The new building and additional storage yard will have little affect on future zoning concerns. 24. Explain how this proposal impacts the protection of the health, safety and welfare of the inhabitants of the neighborhood and the County. this addition to M and M Excavation will have almost no affect on the inhabitants of Weld County 25. Describe any irrigation features. If the proposed use is to be located in the A (Agricultural) Zone District, explain your efforts to conserve prime agricultural land in the locational decision for the proposed use. I _ he majority of the irrigated farm land will ue preserved with this proposal. The existing dryland corner and approximately 2 acres of the irrigated farm land will be used to construct this facility. 26. Explain how this proposal complies with Article V and Article XI of Chapter 23 if the proposal is located within any Overlay Zoning District (Airport, Geologic Hazard, or Historic Townsites Overlay Districts) or a Special Flood Hazard Area identified by maps officially adopted by the County. The site is not in any special districts 27. Detail known State or Federal permits required for your proposed use(s) and the status of each permit. Provide a copy of any application or permit. No state or federal permits are required for this facility. 12/15/21 13 USE BY SPECIAL REVIEW (USR) ENVIRONMENTAL HEALTH QUESTIONNAIRE Answer the following questions per the Weld County Code, Chapters 14, 23 and 30. Please type on a separate sheet. If a question does not pertain to your proposal, please respond with an explanation — do not leave questions blank. 1. Discuss the existing and proposed potable water source. If utilizing a drinking water well, include either the well permit or well permit application that was submitted to the State Division of Water Resources. If utilizing a public water tap, include a letter from the Water District, a tap or meter number, or a copy of the water bill. W nere is an existing central weld water tap 2. Discuss the existing and proposed sewage disposal system. What type of sewage disposal system is on the property? If utilizing an existing on -site wastewater treatment system, provide the on -site wastewater treatment permit number. (If there is no on -site wastewater treatment permit due to the age of the existing on -site wastewater treatment system, apply for a on -site wastewater treatment permit through the Department of Public Health and Environment prior to submitting this application.) If a new on -site wastewater treatment system will be installed, please state "a new on -site wastewater treatment system is proposed." (Only propose portable toilets if the use is consistent with the Department of Public Health and Environment's portable toilet policy.) i-here is an existing septic permit ( SP -1200132) but a new septic field will be designed and installed to allow for the new building placement and additional employees. 3. If storage or warehousing is proposed, what type of items will be stored? Describe where and how storage and/or stockpile of wastes, chemicals, and/or petroleum will occur on this site. There could be up to 16,000 gallons of diesel, 2500 gallons of engine and hydraulic fluids, ai id 4000 gallons of waste oil that is used to heat the building. All tanks have secondary containment. 5. If there will be fuel storage on site, indicate the gallons and the secondary containment. State the number of tanks and gallons per tank. Please see #4 If there will be washing of vehicles or equipment on site, indicate how the wash water will be contained. Any washing off equipment or vehicles will occur where there is a flo0r drain to collect tine runoff. W ne drains empty to a vault If there will be floor drains, indicate how the fluids will be contained. The floor drains in the existing facility *rain to a vault that is emptied as required. Indicate if there will be any air emissions (e.g. painting, oil storage, etc..). There will not be any air emissions Wan MIS application. 9. Provide a design and operations plan if applicable (e.g. composting, landfills, etc.). N/A 10. Provide a nuisance management plan if applicable (e.g. dairies, feedlots, etc.). N/A 11. Additional information may be requested depending on type of land use requested. l here is a SPCC plan at the site. ENVIRONMENTAL HEALTH CONTACT LIST Environmental Planner: Lauren LightIlight@weldgov.com(970) 400-2211 On -site Wastewater Treatment Systems Coordinator: Katie Sall ksall@weldgov.com (970) 400-2216 Waste Program Supervisor: Ben Frissell bfrissell-durley@weldgov.com (970) 400-2220 12/15/21 17 USE BY SPECIAL REVIEW (USR) DEVELOPMENT REVIEW QUESTIONNAIRE Answer the following questions per Section 8-11-40, Appendix 8-Q, and Section 8-14-10 of the Weld County Code. Please type on a separate sheet. If a question does not pertain to your proposal, please respond with an explanation — do not leave questions blank. 1. Describe the access location and applicable use types (i.e., agricultural, residential, commercial/industrial, and/or oil and gas) of all existing and proposed accesses to the parcel. Include the approximate distance each access is (or will be if proposed) from an intersecting county road. State that no existing access is present or that no new access is proposed, if applicable. The existing access will remain unchanged. The access permit is AP12-00007 2. Describe any anticipated change(s) to an existing access, if applicable. No changes planned 3. Describe in detail any existing or proposed access gate including its location. No changes planned 4. Describe the location of all existing accesses on adjacent parcels and on parcels located on the opposite side of the road. Include the approximate distance each access is from an intersecting county road. 5. Describe any difficulties seeing oncoming traffic from an existing access and any anticipated difficulties seeing oncoming traffic from a proposed access. 6. Describe any horizontal curve (using terms like mild curve, sharp curve, reverse curve, etc.) in the vicinity of an existing or proposed access. 7. Describe the topography (using terms like flat, slight hills, steep hills, etc.) of the road in the vicinity of an existing or proposed access. 12/15/21 19 WE l\NS Mi`-V ENGINEERING AND LAND DEVELOPMENT LLC Eric Wernsman PO Box 105 LaSalle CO 80645 Decommissioning Plan: In the event that the site needs to be decommissioned, the buildings and structures could be removed and recycled and or hauled to a landfill. Septic systems would be abandoned per Weld County Regulations. The site would be reseeded or reclaimed for farmland once the improvements were removed. Please let us know if you have any further questions. Eric Wernsman of one NON HATCHED AREAS TO REMAIN IN CURRENT CONDITION OR RESEEDED TO NATIVE GRASSE S 8856'58' W 388.56' Mc-MExcavation MUSR ETENTION PO _ — .�� MIN VOLUME = —11. 94,473 chic feet NEW CHAIN LINK /T - FENCE YARD EXPANSION o gco LEGAL DESC: LOT A and B, RECORDED EXEMPTION 4762 , PART OF THE EAST HALF OF THE NORTH WEST QUARTER OF SECTION 17 TOWNSHIP 5 NORTH RANGE 64 WEST OF THE 6TH PRIME MERIDIAN. WELD COUNTY COLORADO ALL AREA SOUTH OF THE FENCE TO REMAIN ,„.........".......„,- AGRICULTURAL 0 50 100 150 25490 County Road 58 Greeley, CO 80631 CR 58 ROW CREATED 1/8/1881 BY PETITION BOOK 2 PAGE 363 NK D YARD 10 COMMERCIAL ACCESS PERMIT# AP12-00007 Z T -S-88.56'58'14— ... EXISTING BUILDING FF.46 63931' 1 200520 SQ. WA EXISTING WATER DUMPSTER ENCLOSURE QUALITY POND TO BE '�`71- FILLED IN SITE PLAN 4619.46' IIIIII AZAREA It EQUIPMENT PARKING AREA EIpCE TO BE REMOVED BERWEEN EXISTING AND NEW YARD It • EXISTING WATER QUALITY POND t TRUCK PARKING TRUCK, SEMI TRAILER AND PICKUP TRAILER PARKING FUEL TANKS LEGEND PROPERTY LINE ROW/EASEMENT EXTENT OF OUTDOOR STORAGE EXTENT OF GRAVEL SURFACE 6' CHAIN LINK FENCE nfl �� EJW 6JW 3/16/;023_ T -50' Cl 25490 County Road 58 Greeley, CO 80631 dill Inlo,. UPI' IIIIIIMID tllINIMill l. o 2 > m8 > oo al cc W S U m o m co O M N EJW 2/512023 r -50' 11.61 C2 5' X Sr x Iff TYPE 'L' RIP RAP DOWNSTREAM OF / SPILLWAY _4 r ID' X 10' X ID TYPE RIP RAP DOWNSTREAM OF SEC 0-0 S X8'56'58' W 1 388.56' Mcf. MExcavation MI/SR 25490 County Road 58 Greeley, CO 80631 COUIVTT RD 58 .S 88.56'58° 639.9t ]5' WNEW AE EEMERGENCY CON CR w1REtDIEVATON O 4717 WASHOUT AREA 50 100 150 EROSION CONTROL PLAN ]Oslo Sp. Pe°I 0.6)]X Acrn EXISTING BUILDING 4619.46' LOSPNG WATER I OMAl1TY POND T REMAIN 1 KEY TITLE SF SILT FENCE ED EXTENT OF DISTURBANCE ® CONCRETE WASHOUT AREA PERMANENT SEEDING SYMBOL/ LINEWORK s I' 0, J 6C621; EJW EJW 215/2023 r=w' C3 I1 1$i pil 1 1 i.gi. ` s A @R gb c 2 i Ali ! P P. 4 6 ;O ih 6 1 O1 l'a A Pi agA IRl s d 8 i 14 d e I. 9 ---iI lE 9 �6 a �4 111? i EE AA h i! it 4`t -. I5 1! €`aa 1 F.; OE ti °. ra as Y5 d3 ! 9g . aq l3 ARC r'� it� �° aFi A n n g I a gI 5 B 9 4 i gli 'i _ 2F ji 5 di i,�� u c, P i$99 RI ix x yi& /! i g 1 1 e �0 D h3 icy i lR $r rg . ! AE 81 99 a's 41 eE ESQ- el ! Ega i Via 5 4 i ,e3 E - . E E4 !i. I i{5p 4q ' I �yE{g g87. 9i ig %_f (i Ai KTt SSy !! ll pEp If pp AA EY 1 i q C .iS 5pJ �,5 �gep 7p a R{`ag w• 1 fi I A i 9I wG; ; IC iT lili irj�g'•e� R '2_ Pi lid w °- si al WI . $a,64. 114 i 54 6$, R� I gg�A E(yAy 6§ 1 @f@¢ Zvi -5i1 t, 1, .: B'. 3; ! pgl.1 I R p99, fifigs @4 ' �4}'e; �ts g A9 fi� p,NA. BA '¢,A �!9 d It j -d itsigm itak II& n •y o� `N' a 1 4 ASI 3,�' 8. ® . _ L ,qy :a� I 4 ta n 4 �„_______. !-,, z/e%263 ,,, WERNSMAN ENGINEERING AND LAND DEVELOPMENT LLC 16493 ESSE( ROAD SOUTH PLATTENLLE CO 80651 PHONE 970-539-2656 f _ M and M Excavation 25490 County Road 58 Greeley, CO 80631 l f 1 f _ DRAWN FOR Tam/ 1®m asw CartyPndss Ora% CO OM l SC -2 Sediment, Control Log (SCL) (uAnri f'^) SC CW ono wcw T. "Tor IRTTIATTT COMPOST' SEDIMENT CONTROL 103 (WEIGHTED) L 5 TI N ZUMPGSI S2DIMkNT CANTINA L O QII#IIIIIIIIIIiiiiii R wrio sr.wKM =2 IlI1IIIIIIIlIIIvII TOG JOINTS SCL-2 COMPOST SEDIMENT CONTROL I OS ile/ElEKTD). t12� LISA ONapa0m4NmAARiot W E4eA SPv UAI4. 0Yu2Fm1 Vaim LNPmbnUIS SC -2 Sediment Control Log (SCL) .322.01_0711.102.03181.1.0.71.127 I. SEE PL07 yr. Ma Ltt000 AYD 181014 C' 5.704 FCM O Sacs. SIGI7CO•CCHINOt L. TRH AU SAPS... MINX N.. CC MTH. AVOR .3. PLO.. CCKPOLLus cOKASECF'SINA7 Scam. Neu. et IlIGE Of MY nAAO N® KLPSOO Chars dN¢ Rim RU! 4. semen. mHNOL .] 1777 EC ASED AS SAL OEa OK H mans (NT sw2 P.Tn LCOOAxa man DE 11Ae1 M.. IC TAwaFn OM SE SIAM In Rpm a 0x05 00SI E M0AOR o0Ea3U (PTO 1E R w'rHNAm+ Wen ouE wT 1P o..wr I I A RO 0 A0 H I IC E WE SFS ... a-NaoTAa0 0In .wE wAAT w em FaumE AK. an e M w`SPECCS SS., STARES KTLAGIV WNW TON STOP. r.iOKEW. YYAsm� .s 0077. Of TIE CAawAYOF1 STALL Pow. no Too M I. STAPES EDT WR I:AOIEN PRIOR TO TOTNUIHN SWL Be: QRACm...n Of E SRO. or w LFID+. a^vFrt smut Twm• WON. Ks. 7P.A• MN w.f.. 4.70 touvit.IPEN ESIONE moor. Omani, A• K SHA677.0 eE 6.47 .70701 50 * 50 *. TWO v JA.F� Poo MST. AN:WM 0,00140. ASPECT.. MO KKK. SHAJLO 3. WHO Naos ow To.. WAR 00 AS ACHANO SMAO E oM1ED NNW. Of 1M ALNw ¢�MOf 1 TE ma, lM1CFE SA RAAA o S .r .... NAAND NTED \ANNE ItTN, lOF vE ssAaK1 a0XI. L00:.. S %GM* Cwm%ALOC SCULL BE ApAaEmrt Tr Oro m CONSINCiGNtNCST A �PPFINE�su it emu r c.® no1077 SOL =NO KO .1.0425 Go onus SANAS LOCAL Gi7049 As• KArr Of7.1.0 RAC TAP MO. Silo 1Hov NTti a iD a usDARN1�CN UNSOA.VAPe4E1mSCAK*DASH. MOSmLa2aUI 4S o PoA W na1a.)a 0Ra M M®I VOA I D. EtWUSHAN0aO MOWL PREVENTION THE CONTRACTOROWL FOUH OWL FEDERAL. STATE AND LOCAL REOUATIWm PENTOS. TO MATERIAL HANEL.. SELL PREVENTION AM3 SPILL CLEANUP. TM CONTRACTOR SHALLMTPYTHEAPPROKUATE SIA "IO A. A SPILL OCCURS. TIEFOLLONOm AERECOWE20EDRLIGNIK-'S FORTI¢OONTRACTORAN] mNLLEDTREP KE00VEoaBRAL GOMAETC WASHOUTSTRUCTURE CONCRETE WASHOUT STRUCTURES ARE USED TO CONTAIN CISCRETEND UOUIDS AMEN THE CHUTES OF CONCRETE MINK AR O HOMERS OF CONCRETE PIMPS ARE.. OUT AFTER DEILRV.THE VONHOUT IOUTIES CON CCOSTRICUED OR RFADYRIADE ALLWA0HWIT 0A RTES COH00IICATE SOLOS FOR EASIER 6oSALNOP AOR OAMFF OF LIMO. TEEWALT WATER SAMMIED CONTAINSHCNLEVna OF 121.0.1.1. CHGNLEAOIINTOTHEOROUONLCOMNSNATEORO NDWATEN IT CANAIm NORATETOA STORM MACH VASI. CAN INCREASETEPHOF NEARBY WATEAYAYSANOHMMADUATICUM FEET UPSTREAM FROM ABTORN ANON, 0TREULEALKIN POMP OR WATERWAY. ARSHALL DASTALLTIEWALCUT AMINM.MOFIW ▪ AC1LTEB SHALL BE CLEANED OUT ONCE THEY ME DI FULL M NEV FACILITIES BE CONSTRUCTED TO PROVIDE ADDITION LSTORADE SOLVENTS, FI+.OR TO WAS.WATER ERO PROHIBITED. . FFNOR RYI.0MSFMKA AL OF CONCRETE WASRCIIT WASTEON THECOL'TRUCTCN ERE LS PROHBIIED. COP., OF L YAE FALL A0BE W A LEML MANOR. WWTCKN1 NIE HAMMEDSOLDWASTE WWOEENT: BUILDING MATEMI9O ONOO F TO 0 CCRSIRICICNSTE EP. THE RISK OF ROU00 1. PRACTYFSNIGIAS04 SAMMY IMMIOI SA4 REGYtla4 PCPERE NWT BE PROPER...AMAZED.. � LITPLMPDENVCEMDNiLL PREVENTION AND CLEANUP MEASURES CAN RmC£TRE POTENTIAL FOR STORIMATBi RUNOFF TO NDBBDE CONSTRUCTIONSITEWASTF_SANOCONTAIMATEGURFACEOROROUNDWATEFL . THECONSUKTORSHALL * STREAK THAT LSAT LEAST MOPES' RAAIE' AWAY FROM A STORY MN STREAM POD OR WATERWAY. • TBnORALOnWTMYEAsoTIES.O OBELOCATEDATLEAST SOFEET AWAYBbN MMLb0VAYS. SHORN DRAINS MAURY FACROEDAREASOPHIONTRAFN AVERS. SHALL T BE ALLOWED D TO FLOW INTO STORM SEYA:.3AW ORAJWOEMVS ONLY UCEIISELI HAULERSSNALL F WO OF WASTE FACILMESSLALLEC-@ED IHTO PREVENT OVERNRNNOIN AR • COTBTRUCTM WASTESVULBESEORWATED PROPSLLYPRO VARIOUSCATEOMIBSKII ASHATMOOUSMATECALS, TOPIC UOUDSD MOWNYARCOUS OAKU . • CONTAINERS M UM. SHOULD HAVE SECONDARY CONDIMENT' D RESTORED AWAY FROM DRAJNMEWAYS STORM OWNS. HBEIWNOWATFASMEASM KKW TRKFIC. DARFASS1.9SfDlETO i1DOON0. COMAINERSEWLL ALSOEPROPERLYLABELED. VIOL PREVENTION D CONTROL SPILL PIEY TWIV CONTROLAME COUNTER MEASURE FLAN (WOG) SIWLCLFARLY AMATERULT AMPTRNN PERGONNS. OPPREVENTTOP THE GOLE °FA�AND TCONTROLL FUTURE SPUSCON. THEE:FICLEAN wSNYS ARE O EOFOWMAVINATED CONSTRUCT. SRBWEOE IWAAITWNWASTE MESRORE0 M USED. WARN.. WASTE INCLUDESFFSIImES AWTS^F • AoR800CISNMPmacO¢ %DR�ON,EMROLDWUOWMEASGRE 1ARN CO FOLIANCEWRNETATEEA DFFFDEULLR®UATIOS . TPOIDSWL BEWMAIMD ANOP CLEANED LPMCOONASPOEHNE • REGIONALS LEFT OVER LP ACTATY, SUCH AS ABSORBENT PADS OR CONTOTANISOF S41 TERIAL SHALL DEC S.°OFPROPERLY. . PROPER SPILL ANOTHlbT O5SUCIEREPORIT O PROCLOUREDINGDONOGALINOTHEAPROPOATESTATE MEU2ES SOUL BE POLL.. FOR BOTH HALMOWSD NONFM2ARDW9 MATERWB • SPILLS SHALL NOT BEWALSNED OONN INTO THE SHORN CRAW OR BRED ANYWHERE TECOMCICTO R SHALLREFERTOTHESTATEDFIDBULSPILL000NDEN.WUAL (WNp FOR ADOrON. RECIUMPIENTO Stabilized Staging Area (SSA) SM-6 nwsw 550-1. STARE IZFD RASING AREA rw"'"dw to t$ O OCAP ASIA arK Mwax assemomsmsdnammosasmamsnomammarad Iwo... mom osso mos moo d o mom a- mamma tss FNS ""'" N [s rsAwrt w F= I+'NI wv cuss` w Nalmb.ml0 U70705Al.rsoOiNNI.E.vdmu) 1. THE EROSON CONTROL WSFECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS POOR TO ANY CONSIRJCRDN ON 1X15 Erg 2. THERE SHALL BE NO EARTH-ESTURBINC ACTIVITY WTSOE TINE OUTS DESIGNATED EN THE ACCEPTED PLANS. 1 ALL REQUIRED PERIMETER ALT AND CONSTRUCTION TENONS SHALL BE INSTALLED POOR TO ANY LAND DISTURBING ACONIY (STOCKP¢WC. STRIPPING. GRADING. ETC). ALL OTHER REWIRED EROSION CONTROL MEASURES SMALL BE INSTALLED AT THE APPROPRIATE TIME W THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE. CONSTRUCTION PLANS. AND EROSION CONTROL REPORT. ALL TIMES DURING CONSTRUCTION. THE DEVELOPER STALL BE OESPONABU FOR PEVENTNG AND CONTROWNC ON -SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED 50 AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR WSTALUNG AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HERON. B. PRE -DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF (METRO PFACO TATDN SHALL BE LIMITED TO ME AREA(S) REWIRED FOR IMMEDIATE CONSTRUCDEN OPERATIONS AND FOR THE SHORTEST PRACTICAL or THE B. KEPT INSA ROUG ROUGHENED CWDmon Al RIPPPINGDISTURBING OR ASN0NE TY (STOPPING. CONTOURS UNIV.NMULCH. VET T000 .STOCco AMER moor, ERMANENTT EROSION 00NTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS -OF -WAY SHALL REMAIN D:POSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (00) DAYS BEFORE REWIRED TEMPORARY OR PERMANENT EROSION CONTROL (EC. SEED/MULCH. LANDSCAPING. ETC .) IS INSTALLED. UNLESS OTHERWISE APPROVED BY THE LOCAL BITTY. P. IN ORDER TO MINIMIZE EROSION POTENTIAL ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES AHALU A BE INSPECTED AT A MIIMUM OF ONCE EVERY TWO (2) WEEKS D AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED M RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONSOLED PERFORMANCE Cr THOR INTENDED FUNCTION. B. REMAIN IN PLACE UNTIL WOH TIME AS All THE SURROUNDING DISTURBED AREAS ARE SUFHOENTLY STABILIZED AS OETERUINEO BY THE EROSION CONTROL INSPECTOR. G BE REMOVED AFTER THE SITE HAS BEEN SIFFICENTLY STABILZEO AS DETERMINED BY THE EROSION CONTROL INSPECTOR. B. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE OEM UP AND REMOVAL OF ALL SEGMENT D DEBRIS THAN ALL DRAINAGE INFRASTRIICIURE AND OTHER PUBLIC FOCUSES. 9 THE CONTRACTOR SHAH CLEAN UP ANY INAOVERTEIT DEPOSND MATERIAL IMMEDIATELY AND MME SURE STREETS ARE FREE OF ALL MATERIALS BY THE END OF EACH HORNING OAK TO. AU. RETAINED SEDIMENTS, PARTICULARLY 8105E ON PAVED ROADWAY SURFACES. SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CORY NOR RFZEASE INTO ANY WATERS OF THE UNITED STATES Il. NO Sal STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKRIES SMALL BE PROTECTED FROM SEGMENT TRANSPORT BY SURFACE ROUGHENING. WATERNG. AND PERIMETER ALT FENONG ANY SOIL STOCKPILE REMAINING WIER THIRTY (001 DAYS SHALL BE arm AND MULCHED. 12. THE STORMWAIER VOLUME CAPAOTY OF CEIENTON PONES WLL EE RESTORED AND STORM SEWER LINES WILL GE CLEANED UPON COMPLETION OF THE PROJECT AND armor TURNING THE MAINTENANCE OVER TO THE LOCAL DIRTY OR HOMEOWNERS ASSOCIATION (000). TO. COUNTY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (COPS) REQUIREMENTS TAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION NIES. POLLUTANTS INCLUDE BUT ARE NOT UNITED TO DISCARDED BUILDING MATERIALS. CONCRETE TRACK WASHOUT. CHEMICALS. EL AND CAS PRODUCTS. UTTER. AND SANITARY WASTE THE DEVELPOLLUTANTS ON THE SITE IN ACCORDANCE WIPER SHALL AT ALL ours TAKE TH ANY AND ALL APPUCAOLE LOCAL, ASURES ARE NECESSARY TO A�TE. D FEDERAL RE THE PROPER CONTAINMENT AND DISPOSAL OF M. A DESOLATED AREA SHALL BE PROVIDED CR SHE FOR CONCRETE TRUCK CHU. WASHOUT- THE AREA SHALL E COMSTRUCEO SO AS TO CONTOF CD S mg WASHOUT MATERIAL D LOCATED AT LEAST FIFTY (SO) FEET AHOY FROM ANY WATERWAY WRING CONSTRUCTION. UPI. APLET N RESTORED. CONSTRUCTION actroo CONCRETE WASHOUT WO.. WALL BE RRUOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA BEING 15. TO ENSRE THAT SEDMENT DOES NOT MOVE OFT OF WOMOUAL LOTS ONE OR MOTE OF THE FCLLO050 YDITENT/0R04EI CMTHOL BOPS STALL BE INSTALLED AND MAINTAINED UNTIL TE LOTS AE SU0OENTLY STARIUZED. AR DETERMINED BY THE MO500 CONTROL INSPECTOR, A. BELOW ALL COTTER DOWNSPOUTS. B. OUT TO DRAINAGE PALES. C. ALONG LOT PERIMETER D. OTHER LOCATIONS. IF NEEDED. TB. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY. AS DIRECTED BY THE COUNTY. II. A 0E0CLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CI.STRUCOON EQUIPMENT. INCLUDING BUT NOT LOOTED TO ORR800 VEHICLES EMIING EMSIING ROADWAYS N T EARTHEN SOADNO E $TONE DIRT. ETC. SHALL BE ONCE W THE CURB a T. rre' M ROADWAY AS A RAMP TO ACCZ55 TEMPORARY SiOO(PIRFS. StAGNG ME/5. CONSTRUCTION MAlEOA15. CONCEIE WASNWT ALAS D/01 BUILDING SINES. STADAgAle Management (SP) AIM -2 STOCXPF E PROITMIN PLAN Steno A Sp -1 STOYXPRE PROTECYOT( n..mu.1r 2aw..s ro.A.._.n.Mol 971 EC -6 Rolled Erosion Control Products (RECP) FCR-I PLR. OUTLET 10 ORAWACEWAT en ree-2 SHAH DR. OR DRAJNAGWAY UtiaOrlw.o urVa O Eif V U 7 ghE W � osm EJW _ mom EJW IL'0 SEC A -A CHANNEL SLOPE =0.3% Ng 5' MIIN 6" SEC B6 B CHANNEL SLOPE = 20% HIGH WATER DURING OVERFLOW OF OFF SITE PASS THROUGH STORM FLOW. 100 -YEAR OVERFLOW SPILLWAY 4' 4 1' -OW MINIMUM FREE BOARD 4' 4' [.s. CLR•J �B MINIMUM THICKNESS NOTE: 2 - #5 BARS (SEE NOTE) TRENCH FOR WEIR OUTLET STRUCTURE USING NATIVE GROUND AS FORM WORK. CONSTRUCT WEIR B' MINIMUM THICKNESS. UPON COMPLETION OF TRENCHING, PLACE TEMPERATURE STEEL AND CONCRETE IMMEDIATELY. FORM TOP 4'. SECTION A - A CONCRETE WEIR OVERFLOW STRUCTURE CONCRETE WEIR STRUCTURE CENTERED IN BERM A PROPOSED TOP OF BERM 451B OVERFLOW ELEVATION 4617 A DETAIL A OUTLET AND SPILLWAY DETAILS CFN1� OF NOTRCRT0N 1-800-922-1987 OUTLET AND SPILLWAY DETAILS DETAIL 11-7 ScuA N.T.S. nfl EJW EJW 2/5/2023 V-50' C6 DRAINAGE REPORT FOR MAND MEXCAVATION USR- PREPARED FOR: TERRY MILLER 25490 County Road 58 Greeley, CO 80631 DATE: March 15, 2023 CONSULTING ENGINEER: WERNSMAN ENGINEERING AND LAND DEVELOPMENT, LLC PO Box 105 LaSalle, CO 80645 WE l\NlJMi `N ENGINEERING AND LAND DEVELOPMENT LLC Eric Wernsman PO Box 105 LaSalle CO 80645 March 15, 2023 Weld County Public Works Department 1111 H Street Greeley, CO 80631 RE: M and M Excavation site at 25490 County Road 58 Dear Sirs: Wernsman Engineering and Land Development, LLC is pleased to submit this Drainage Report for the proposed the M and M Excavation Site, located at 25490 WCR 58 Greeley CO. Please review at your earliest convenience. We look forward to your comments and ultimate approval of the Drainage Report. Please feel free to contact me at (970) 539-2656 if you have additional questions. Sincerely, Wernsman Engineering and Land Development, LLC Eric Wernsman, P.E. PROFESSIONAL ENGINEER'S CERTIFICATION I hereby certify that this Drainage Study for the M and MExcavation site was prepared by me (or under my direct supervision) in accordance with the provisions of the Weld County Storm Drainage Criteria Manual for the owners thereof. Eric Wernsman, P.E. Registered Professional Engineer State of Colorado No. 33371 Index Page 1-8 9-12 13 14 15 16 17 18 18.1 19 20 21-24 25 Drainage Report Rainfall Imperviousness Dl Sub -basin runoff OS1 Sub -basin runoff Sec A -A Sec B -B Retention Pond Volume Requirements Retention Pond Volume Provided Emergency Overflow Fema Firmette NRCS Hydrologic Soil Information Vicinity Map I. General Location and Description A. Location The M and M Excavation Site is located on Lot A and B RE 4762 which is in the East 1/2 of the northwest 1/4 of Section 17, Township 5 North, Range 64 West of the 6th Prime Meridian within the unincorporated area of Weld County, Colorado. The site address is 25490 WCR 58. The site is adjacent to CR 58 and approximately 1300 feet east of WCR 51. To the east south and west are agricultural land. Across CR 58 to the north is a residential home and farm. This site is located in a rural, non - urbanizing area of Weld County. Highway 34 is located about a half a mile of this site. There are no major drainage ways that are located within or adjacent to this site. With the exception of the residence to the north, there are no adjacent developments. B. Description of Property The entire site consists of approximately 79 acres, however, only the northern 9.5 acres is developed or will be developed. The current ground cover is grasses, gravel, concrete and buildings. The develop portion site is sloping from the north to south. The undeveloped portion site is sloping from the west to the east at about a 0.3% slope. According to the USDA Natural Resources Conservation Service's Web Soil Survey, the soil on this site consists of Altvan Sandy Loam which is classified as being a Hydrologic Group "B". The proposed development is the expansion to an existing building, a future building as well as the expansion of the gravel storage yard. When completed, the proposed development consists of two buildings (26,620 sq ft) with 6.6 acres of gravel surefaces. The retention pond area will be seeded with native grasses. II. Drainage Basins and Sub -Basins A. Major Basin Description The site is tributary to the South Platte River. The majority of the basin consists of agricultural land. There is no Weld County Master Drainage Plan that includes this site. Per FIRM Panel No. 08123C1565E, the site is not in the 100 -year flood plain, see attached FIRMette. This site is located in a rural, non -urbanizing area of Weld County. 1 B. Sub -Basin Description The existing developed site generally slopes from the south to the north. The site drains to (2) water quality ponds that are east and west of the existing building. The eastern existing basin will remain in its current condition. There is no new impervious surface planned for this basin east of the building. The western portion of the existing site will generally remain in the same condition except the existing water quality pond will be filled in and made to drain to a new retention pond on the west side the western expansion of the site. The western portion of the site that is planned for the new yard expansion and future building will have a new retention pond that will hold runoff from the yard expansion and the western portion of the existing developed site. Currently, a small portion of the agricultural property on the west side drains on to the site. In the developed condition, there will be 1 onsite subbasin and 1 offsite subbasin. Runoff from the onsite subbasin, together with the offsite subbasin, will be directed to the proposed retention pond that is located in the western portion of the site. The onsite developed subbasin consists of rooftop, gravel parking, concrete, gravel storage and landscaping/open space. Existing Conditions Sub -Basin H1 (Onsite). The site generally slopes from the south to the north. This sub -basin consists of approximately 6.05 acres. The soil within this subbasin is classified as Hydrologic Group "B". Sub -Basin 051 (0ffsite). The site generally slopes from the west to the east. This sub -basin consists of approximately 3.6 acres. For the Historic Conditions, the entire site was assumed to be covered with grass. The soil within this subbasin is classified as Hydrologic Group "B". III. Drainage Design Criteria A. Regulations The design criteria for this study are directly from the Weld County Code, Chapter 8, Article XI — Storm Drainage Criteria, Weld County Engineering and Construction Guidelines updated January 2021, and Urban Drainage and Flood Control District's (aka Mile High Flood District) Urban Storm Drainage Criteria Manuals Volumes 1, 2 and 3. No deviations were made from the Criteria for this study. The NOAA website was utilized for determination of the rainfall amounts for each storm frequency. 2 B. Development Criteria Reference and Constraints The developed site will convey runoff to the design point in a safe and effective manner. The retention pond will be constructed to retain the entire developed 100 - year 24 hour storm and then multiplied by 1.5 per Weld County requirements. C. Hydrological Criteria The 100 -year was used for the major storm event. From the NOAA website, the 10 - year one hour rainfall depth is 1.42 inches and the 100 -year one hour rainfall depth is 2.7 inches. These storms have been used as a basis for planning and system design. The peak flow rates for design points have been calculated based on the Rational Method as described in the Criteria Manual with storm duration set equal to the time of concentration for each subbasin. The runoff calculations were bases on the SCS Hydrologic Soil Group "B". Urban Drainage and Flood Control District (UDFCD) UD-Detention V2.35 was utilized to size the retention pond with the 100 -year 24 Hour Storm multiplied by 150% The Water Quality Capture Volume is included within the retention. D. Hydraulic Criteria The define outfall point for this site is the retention pond located along the western boundary. The overflow spillway for the retention pond is sized to convey the developed onsite and offsite 100 -year runoff. E. Waiver/Variance Criteria A variance for a retention pond will be requested from the Weld County Code, Chapter 8, Article XI — Storm Drainage Criteria, Weld County Engineering and Construction Guidelines updated January 2021. F. Stormwater Quality Considerations The retention pond will provide sufficient storage for the Water Quality Capture Volume (WQCV) for the site. IV. Drainage Facility Design A. General Concept The majority of the onsite will drain to a proposed retention pond located near the north west corner of this site. The retention pond was sized to hold the 100 -year 24 hour storm multiplied by 150%. In the event that the pond overtops an emergency spillway will convey the developed 100 -year runoff to the outfall point along CR 58. 3 B. Specific Details Sub -Basin D1, 6.06 -acres, 39% impervious, developed onsite area consisting of roof tops, gravel paving and open areas that drains to the western detention pond. Basin runoff coefficient is 0.50 for the 100 -year storm events. The time of concentration (with the urban check) is 13.92 minutes. The calculated runoff is 17.66 cfs for the 100 -year storm event. Sub -Basin OSI (Offsite), 3.6 -acres, 2% impervious, that drains onto this site from the south. Basin runoffs coefficient is 0.36 for the 100 -year storm events. The time of concentration (with the urban check) is 13.9 minutes. The calculated runoff is 9.72 cfs for 100 -year storm event. Sub -Basin OSlwill drain onto the developed site and will be conveyed to the proposed retention pond. Retention Pond The retention pond is located on the north west corner of the development. The 100- yr 24 hour storm volume required by using the Modified FAA method was determined to be 1.45 acre feet(63,162 cubic feet). Using the required 150% of that volume requires 94,873 cubic feet for retention pond volume. With a pond bottom of 4608 and a 100- year high-water elevation is 4816, The available volume provided is approximately 94,884 cubic feet. An emergency spillway is designed in the retention pond berm to allow onsite and offsite flows to leave the retention pond. The emergency overflow is provided at elevation 4817. The spillway base shall be a minimum of 25 feet wide and will limit the flow depth to 0.5 feet at a discharge rate of 27.27 cubic feet per second. A 5' x 41' area of Type L buried riprap shall be placed downhill of the emergency overflow to control erosion. Please refer to the appendix for the calculations regarding the overflow and spillway. V. Conclusions The proposed site will direct the developed storm water flows to the onsite detention pond. The retention pond will retain the developed runoff from the 100 -year 24 hour storm with a 150% safety factor. The retention pond spillway will direct the flow to the CR 58 at the northwest corner. The design should be adequately to protect the public health, safety, and general welfare and have no adverse impacts on public rights -of -way or offsite properties. VI. Compliance with Standards This report and design will meet the Weld County Code, Chapter 8, Article XI — Storm Drainage Criteria, and the Weld County Engineering and Construction Guidelines updated January 2021, with a variance request for a retention pond. The design should be adequate to prevent either onsite or offsite runoff flows from creating damages. This site is not part of any Weld County Master Drainage Plan. 4 VII. Stormwater Quality Water quality structures are being proposed for the development of the site. A water quality pond can be included in the retention pond. In addition to the water quality volume, the bottom of the pond will be grass lined. The grass lining will naturally filter out the oil and heavy metals contained in the stormwater runoff. The owner of the site will be responsible for the maintenance of the EDB. VIII. Erosion and Sediment Control This section describes methods recommended to control wind erosion, soil erosion and sediment from storm runoff during and after the construction of drainage structures and site grading. This development of erosion control criteria establishes the methods and guidelines used to perform the erosion analysis and develop the erosion control plan. A. Discussion The clearing and stripping of land for site grading, overlot grading or for the construction of drainage structures and swales may cause localized erosion rates with subsequent deposition and damage to offsite properties. Uncontrolled, such erosion could destroy the aesthetic and practical values of individual sites and cause damage to downstream property. In general, erosion and sediment control measures will consist of minimizing soil exposure, controlling runoff across exposed areas and controlling sediment at drainage structures. Each of these measures is described below and shall be utilized by the developer and/or the contractor during any construction activity occurring at this site. B. General Erosion and Sediment Control Measures Minimizing Soil Exposure: Where practical, the construction area and duration of soil exposure will be kept to a minimum. All other areas will have a good cover of vegetation or mulch including gravel. Grading will be completed as soon as possible after it is begun. A temporary cover crop, a permanent vegetative cover crop or other landscaping will be established in disturbed areas. Re -vegetation will consist of native grasses. Decorative rock, flower gardens or shrubs will also be utilized in the final landscaping to cover the soil. Re -seeded areas will be crimped and mulched with straw or hay to protect exposed soil until vegetation is established. A layer of gravel may be substituted for re -vegetation in parking and storage areas. Controlled Runoff Across Exposed Areas: Where practical, construction may include constructing temporary swales to intercept and direct storm water around exposed areas. Swales can be constructed to control surface water, which collects on exposed areas and prevent gross erosion in the form of gullies. Riprap, wattle filter, or other temporary erosion control devices may be installed to control storm water velocities across exposed areas. 5 Sediment Control: Temporary and/or permanent sediment control devices will be installed at the major drainage structures and flow concentration points shown on the Drainage Exhibit. Such structures shall be used to intercept and trap sediment once it is produced and prevent it from being conveyed offsite onto downstream property. C. Location and Description of Other Pollution Sources Other than sediment, the only known potential pollution source are mobile fueling vehicles and paint (chemicals). Refueling vehicles will be limited to refuel at one location at the site, to be determined, at least 100 feet from any stormwater conveyance. In addition, one concrete washout area and chemical storage area will be designated, also at least 50 feet from any stormwater conveyance. D. Materials Handling and Spill Prevention Building materials and paint will be stored onsite. If the materials are to be exposed for a significant amount of time, they will be covered to prevent unnecessary polluted runoff. Waterline and sanitary sewer will also be present on site. There will be no concrete or asphalt batch plants or fertilizers located on site. One area at least 50 feet from any stormwater conveyance will be designated for concrete truck washout and construction vehicle refueling. E. Erosion and Sediment Control Plan The following summarizes the overall erosion control plan for this project. The details will be shown on the construction drawings. 1. Wattles will be used on the proposed swales to reduce the transporting of sediment downstream. 2. Final stabilization is reached when all soil disturbing activities at the site have been completed and vegetative cover has been established with a density of at least 70 percent of pre -disturbance levels or when equivalent permanent erosion reduction methods have been utilized (gravel paving). Upon final stabilization, all temporary BMP's may be removed. 3. Other erosion control measures will be used as necessary to help minimize erosion for this project. This includes the use of riprap downstream of the detention outlet pipe and the use of vehicle tracking control at the site exit. 4. Silt fence will be utilized around the temporary stockpile. 5. Permanent seeding will be used in open areas and landscaped areas. IX. Maintenance The following is the drainage/site maintenance plan for the project: 1. At all times, any erosion that may occur shall be corrected as soon as possible to mitigate the chance of sediment leaving the site. 2. All swales shall be inspected regularly and cleaned if necessary. 3. Any seeded areas that are not covered with vegetation shall be re -seeded and irrigated as necessary to establish permanent vegetation. 4. Snow should not be piled in swales or near the retention pond. 5. Any necessary repairs shall be made as soon as possible. Repairs to privately owned stormwater facilities shall not be the responsibility of Weld County. Retention Pond Maintenance (EDBs): The following description was taken from Urban Drainage- Urban Storm Drainage Criteria Manual Volume 3 (November 2010): EDBs have low to moderate maintenance requirements on a routine basis, but may require significant maintenance once every 15 to 25 years. Maintenance frequency depends on the amount of construction activity within the tributary watershed, the erosion control measures implemented, the size of the watershed, and the design of the facility. 7.1 Inspection Inspect the EDB at least twice annually, observing the amount of sediment in the bottom of the pond. 7.2 Mowing and Plant Care When starting from seed, mow native/drought tolerant grasses only when required to deter weeds during the first three years. Following this period, mowing of native/drought tolerant grass may stop or be reduced to maintain a height of no less than 6 inches (higher mowing heights are associated with deeper roots and greater drought tolerance). In general, mowing should be done as needed to maintain appropriate height and control weeds. Mowing of manicured grasses may vary from as frequently as weekly during the summer, to no mowing during the winter. See Section 4 of this chapter for additional recommendations from the CSU Extension. 7.3 Aeration For EDBs with manicured grass, aeration will supply the soil and roots with air and increase infiltration. It reduces soil compaction and helps control thatch while helping water move into the root zone. Aeration is done by punching holes in the ground using an aerator with hollow punches that pull the soil cores or "plugs" from the ground. Holes should be at least 2 inches deep and no more than 4 inches apart. Aeration should be performed at least once per year when the ground is not frozen. Water the turf thoroughly prior to aeration. Mark sprinkler heads and shallow utilities such as irrigation lines and cable TV lines to ensure those lines will not be damaged. Avoid aerating in extremely hot and dry conditions. Heavy traffic areas may require aeration more frequently. 7.4 Mosquito Control Although the design provided in this manual implements practices specifically developed to deter mosquito breeding, some level of mosquito control may be necessary if the BMP is located in close 7 proximity to outdoor amenities. The most effective mosquito control programs include weekly inspection for signs of mosquito breeding with treatment provided when breeding is found. These inspections can be performed by a mosquito control service and typically start in mid- May and extend to mid -September. Treatment should be targeted toward mosquito larvae. Mosquitoes are more difficult to control when they are adults. This typically requires neighborhood fogging with an insecticide. The use of larvicidal briquettes or "dunks" may be appropriate. These are typically effective for about one month and perform best when the basin has a hard bottom (e.g., concrete lined micropool). 7.5 Irrigation Scheduling and Maintenance Adjust irrigation throughout the growing season to provide the proper irrigation application rate to maintain healthy vegetation. Less irrigation is typically needed in early summer and fall, with more irrigation needed during July and August. Native grass and other drought tolerant plantings should not require irrigation after establishment. Check for broken sprinkler heads and repair them, as needed. Completely drain the irrigation system before the first winter freeze each year. Upon reactivation of the irrigation system in the spring, inspect all components and replace damaged parts, as needed. 7.6 Sediment Removal from the Forebay, Trickle Channel, and Micropool Remove sediment from the forebay and trickle channel annually. If portions of the watershed are not developed or if roadway or landscaping projects are taking place in the watershed, the required frequency of sediment removal in the forebay may be as often as after each storm event. The forebay should be maintained in such a way that it does not provide a significant source of resuspended sediment in the stormwater runoff Sediment removal from the micropool is required about once every one to four years, and should occur when the depth of the pool has been reduced to approximately 18 inches. Small micropools may be vacuumed and larger pools may need to be pumped in order to remove all sediment from the micropool bottom. Removing sediment from the micropool will benefit mosquito control. Ensure that the sediment is disposed of properly and not placed elsewhere in the basin. 7.7 Sediment Removal from the Basin Bottom Remove sediment from the bottom of the basin when accumulated sediment occupies about 20% of the water quality design volume or when sediment accumulation results in poor drainage within the basin. The required frequency may be every 15 to 25 years or more frequently in basins where construction activities are occurring. 7.8 Erosion and Structural Repairs Repair basin inlets, outlets, trickle channels, and all other structural components required for the basin to operate as intended. Repair and vegetate eroded areas as needed following inspection. X. References 1. Weld County Engineering and Construction Guidelines, January 2021. 2. Weld County Code, Chapter 8, Article XI — Storm Drainage Criteria 3. Urban Drainage & Flood Control District, Urban Storm Drainage Design Criteria Manual, V. 1-3, 2001, updated August 2018. 4. FEMA Flood Insurance Rate Map, Weld County, Colorado Unincorporated Area, Community Panel Number 08123C2145E, dated 1/20/2016. 8 2/6/23, 8:04 AM Precipitation Frequency Data Server NOAA Atlas 14, Volume 8, Version 2 Location name: Greeley, Colorado, USA* Latitude: 40.4057°, Longitude: -104.5766° Elevation: 4617.98 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps _ & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration 5 -min 10 -min 15 -min 30 -min 60 -min 2 -hr 3 -hr 6 -hr 12 -hr 24 -hr 2 -day 3 -day 4 -day 7 -day 10 -day 20 -day 30 -day 45 -day 60 -day Average recurrence interval (years) 1 0.244 (0.200-0.302) 0.358 (0.293-0.441) 0.436 (0.357-0.538) 0.587 (0.480-0.724) 0.730 (0.598-0.901) 0.874 (0.720-1.07) 0.957 (0.793-1.17) 1.09 (0.912-1.32) 1.27 (1.07-1.52) 1.51 (1.28-1.79) 1.74 (1.49-2.05) 1.91 (1.64-2.23) 2.04 (1.75-2.37) 2.31 (2.00-2.67) 2.55 (2.22-2.93) 3.26 (2.86-3.72) 3.85 (3.39-4.37) 4.55 (4.03-5.14) 5.12 (4.55-5.76) 2 0.295 (0.241-0.365) 0.433 (0.354-0.534) 0.528 (0.431-0.651) 0.709 (0.579-0.875) 0.870 (0.711-1.07) 1.03 (0.849-1.26) 1.12 (0.924-1.36) 1.29 (1.08-1.56) 1.52 (1.27-1.82) 1.78 (1.50-2.11) 2.05 (1.75-2.41) 2.21 (1.90-2.59) 2.35 (2.02-2.74) 2.68 (2.32-3.11) 2.97 (2.58-3.43) 3.77 (3.30-4.30) 4.41 (3.88-5.01) 5.22 (4.61-5.89) 5.90 (5.23-6.64) 5 0.392 (0.319-0.485) 0.574 (0.467-0.711) 0.700 (0.570-0.867) 0.940 (0.765-1.16) 1.15 (0.932-1.42) 1.35 (1.11-1.66) 1.45 (1.20-1.78) 1.69 (1.40-2.05) 1.97 (1.65-2.37) r 2.26 (1.90-2.69) 2.58 (2.19-3.05) 2.75 (2.35-3.23) 2.90 (2.48-3.39) 3.32 (2.86-3.85) 3.67 (3.18-4.24) 4.58 (3.99-5.24) 5.32 (4.66-6.06) 6.27 (5.52-7.10) 7.10 (6.28-8.02) 10 0.484 (0.391-0.603) 0.709 (0.573-0.883) 0.865 (0.699-1.08) 1.16 (0.939-1.45) 1.42 (1.15-1.77) 1.68 (1.37-2.07) 1.80 (1.47-2.21) 2.08 (1.72-2.54) 2.40 (2.00-2.90) 2.71 (2.27-3.24) 3.07 (2.59-3.64) 3.24 (2.75-3.82) 3.39 (2.89-3.99) 3.86 (3.30-4.50) 4.26 (3.66-4.94) 5.24 (4.54-6.03) 6.04 (5.26-6.92) 7.10 (6.22-8.09) 8.05 (7.07-9.13) r 25 0.629 (0.496-0.837) 0.922 (0.726-1.23) 1.12 (0.885-1.50) 1.51 (1.19-2.01) 1.86 (1.47-2.49) 2.21 (1.77-2.95) 2.39 (1.92-3.17) 2.73 (2.21-3.57) 3.08 (2.49-3.95) 3.40 (2.77-4.31) 3.79 (3.10-4.72) 3.97 (3.26-4.92) 4.13 (3.40-5.08) 4.63 (3.83-5.62) 5.07 (4.19-6.09) 6.13 (5.10-7.26) 7.01 (5.86-8.25) 8.20 (6.88-9.57) 9.28 (7.80-10.8) 50 0.756 (0.575-1.01) 1.11 (0.842-1.49) 1.35 (1.03-1.81) 1.82 (1.38-2.44) 2.26 (1.72-3.04) 2.70 (2.08-3.61) 2.92 (2.26-3.90) 3.30 (2.58-4.35) 3.66 (2.86-4.74) 4.00 (3.15-5.12) 4.39 (3.49-5.54) 4.58 (3.65-5.74) 4.74 (3.79-5.91) 5.25 (4.22-6.47) 5.69 (4.59-6.95) 6.80 (5.52-8.19) 7.74 (6.31-9.26) 9.01 (7.38-10.7) 10.2 (8.36-12.0) 100 0.895 (0.651-1.23) 1.31 (0.954-1.81) 1.60 (1.16-2.20) 2.15 (1.57-2.97) 2.70 (1.97-3.73) 3.24 (2.39-4.45) 3.52 (2.61-4.83) 3.95 (2.95-5.34) 4.29 (3.22-5.71) 4.64 (3.52-6.10) 5.03 (3.84-6.52) 5.22 (4.00-6.73) 5.38 (4.14-6.91) 5.89 (4.55-7.45) 6.32 (4.91-7.93) 7.46 (5.83-9.23) 8.44 (6.63-10.4) 9.78 (7.72-11.9) 11.0 (8.71-13.3) 200 1.05 (0.725-1.49) 1.54 (1.06-2.18) 1.87 (1.30-2.66) 2.53 (1.75-3.59) 3.19 (2.21-4.55) 3.85 (2.70-5.45) 4.21 (2.97-5.93) 4.67 (3.32-6.50) 4.99 (3.57-6.84) 5.35 (3.86-7.24) 5.72 (4.16-7.64) 5.92 (4.33-7.85) 6.08 (4.46-8.03) 6.55 (4.83-8.55) 6.97 (5.16-9.01) 8.11 (6.06-10.3) 9.13 (6.85-11.6) 10.5 (7.94-13.2) 11.8 (8.93-14.7) 500 1.27 (0.838-1.86) 1.86 (1.23-2.72) 2.27 (1.50-3.32) 3.07 (2.02-4.49) 3.92 (2.59-5.74) 4.76 (3.18-6.92) 5.23 (3.51-7.57) 5.73 (3.88-8.20) 6.00 (4.09-8.46) 6.36 (4.38-8.86) 6.69 (4.65-9.21) 6.90 (4.82-9.43) 7.06 (4.96-9.61) 7.46 (5.27-10.0) 7.83 (5.55-10.4) 8.96 (6.41-11.8) 10.0 (7.20-13.1) 11.4 (8.28-14.8) 12.8 (9.26-16.4) 1000 1.46 (0.923-2.14) 2.13 (1.35-3.13) 2.60 (1.65-3.82) 3.52 (2.23-5.17) 4.52 (2.87-6.64) 5.52 (3.54-8.04) 6.09 (3.93-8.81) 6.62 (4.31-9.49) 6.83 (4.49-9.68) 7.18 (4.78-10.1) 7.47 (5.02-10.4) 7.69 (5.20-10.6) 7.84 (5.33-10.8) 8.17 (5.60-11.2) 8.48 (5.84-11.5) 9.58 (6.67-12.9) 10.6 (7.46-14.2) 12.1 (8.54-16.1) 13.4 (9.51-17.7) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=40.4057&Ion=-104.5766&data=depth&units=english&series=pds 9 1/4 2/6/23, 8:04 AM Precipitation Frequency Data Server Precipitation depth (in) C Precipitation depth (in) PDS-based depth -duration -frequency (Dan curves Latitude: 40.4057°, Longitude: -1043766° a i 5 10 25 50 100 200 NOAA Atlas 140 Volume 8, Version 2 C La La .n in I Lb i Duration Lai f IV r0 ea ra -0 13 -0 '0 -0 r m N 6 Average recurrence interval (years) >a>, nj M 1 6 6 LA6 500 1000 Created {GIST): Mon Feb € 15:04:39 2023 Back to Top Maps & aerials Small scale terrain Average recurrence interval, (years) 1 2 10 25 50 100 200 500 1000 Duration 5- ron . 2 -day O-fnNn 3 -day 15-ingn — 4 -day 0-11 in — 7 -day ► 'inwri — 10 —day 2 -hr — 2 ay 3 -hr — 30 -day 5 -hr 45 -day 12 -hr — 5O -day 24 -fry 10 https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=40.4057&Ion=-104.5766&data=depth&units=english&series=pds 2/4 2/6/23, 8:04 AM Precipitation Frequency Data Server VALLEY +IRE Ei EY WELD C MR aORT ■ i County Rd 76 3km I2m i I .erne` 4 • 1444. •�L 'L ti v Large scale terrain Large scale map Large scale aerial 11 https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=40.4057&Ion=-104.5766&data=depth&units=english&series=pds 3/4 2/6/23, 8:04 AM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer 12 https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=40.4057&Ion=-104.5766&data=depth&units=english&series=pds 4/4 Sub -basin Imperviousness M and M Excavation 3/15/2023 D1 Developed Site Land Use Area (ft2) I (%) Impervious Area, Grass 57947 2 Roofs 16800 90 Concrete Surfaces 16353 100 Driveways, Gravel 172804 40 Wghtd Avg & Total Area 263904 39 Acres 6.06 13 CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Terry Miller D1 Basin I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = D1 Basin 6.06 39.00 B II. Rainfall Information Design Storm Return Period, Tr = C1 = C2= C3= P1= Acres A, B, C, or D I (inchlhr) = Cl * P1 /(C2 + Td)AC3 100 28.50 10.00 0.786 2.70 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.49 0.29 _a Peach :3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Peach 2 f overland. Reach 1 flow LEGEND a Beginning Flow Direclion C atc Jute nt B o limitary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input 0.0100 328 0.29 N/A 1 0.0020 377 2 3 4 5 Sum 705 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 3.97 6.35 6.35 inch/hr inch/hr inch/hr 20.00 Flow Velocity V fps output 0.21 0.89 Flow Time Tf minutes output 26.42 7.02 Computed Tc = Regional Tc = User -Entered Tc = Peak Flowrate, Qp = Peak Flowrate, Qp = Peak Flowrate, Qp = 33.44 13.92 13.92 11.85 18.94 18.94 cfs cfs cfs ENTIRESITE100.xls, Tc and PeakQ 3/15/2023, 1:19 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Terry Miller OFFSITE I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = OFFSITE 3.60 2.00 B II. Rainfall Information Design Storm Return Period, Tr = C1 = C2= C3= P1= Acres A, B, C, or D I (inchlhr) = Cl * Pi /(C2 + Td)AC3 100 28.50 10.00 0.786 2.70 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.36 0.08 _a Peach :3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Peach 2 f overland. Reach 1 flow LEGEND a Beginning Flow Direclion C atc Jute nt B o limitary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input 0.0020 500 0.08 N/A 1 0.0020 170 2 3 4 5 Sum 670 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 2.26 6.39 6.39 inch/hr inch/hr inch/hr 7.00 Flow Velocity V fps output 0.12 0.31 Flow Time Tf minutes output 69.93 9.05 Computed Tc = Regional Tc = User -Entered Tc = Peak Flowrate, Qp = Peak Flowrate, Qp = Peak Flowrate, Qp = 78.98 13.72 13.72 2.95 8.33 8.33 cfs cfs cfs offsite100.xls, Tc and PeakQ 3/15/2023, 1:18 PM Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: Terry Miller SEC A -A REQD TO PASS 28 CFS MAX F VT I I I IIIII I_ T Z1 C t_ B 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = n= B= Z1 = Z2 = F= Y= 0.0030 0.040 0.00 100.00 25.00 1.00 0.68 ft/ft ft ft/ft ft/ft ft ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= V= A= T= P= R= D= Es= Yo= Fs= 28.72 0.30 0.99 28.90 85.00 85.02 0.34 0.34 0.70 0.22 0.46 cfs fps sg ft ft ft ft ft ft ft kip SECA-A.xlsx, Basics 3/15/2023, 1:21 PM Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: Terry Miller SEC b -b PASS 28 CFS MAX F VT I I I IIIII I_ T Z1 C t_ B 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = n= B= Z1 = Z2 = F= Y= 0.2000 0.016 5.00 0.01 0.01 1.00 0.33 ft/ft ft ft/ft ft/ft ft ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr= V= A= T= P= R= D= Es= Yo= Fs= 30.24 5.62 18.32 1.65 5.01 5.66 0.29 0.33 5.54 0.16 1.09 cfs fps sgft ft ft ft ft ft ft kip 17 SECb-b.xlsx, Basics 3/15/2023, 1:22 PM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Terry Miller Basin ID: WEST STORAGE YARD (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness I. = 39.00 percent Catchment Drainage Imperviousness I. = 39.00 percent Catchment Drainage Area A = 6.050 acres Catchment Drainage Area A = 6.050 acres Predevelopment NRCS Soil Group Type = B A, B, C, or D Predevelopment NRCS Soil Group Type = B A, B, C, or D Return Period for Detention Control T = 10 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 10 minutes Time of Concentration of Watershed Tc = 10 minutes Allowable Unit Release Rate q= 0.10 cfs/acre Allowable Unit Release Rate q= 0.00 cfs/acre One -hour Precipitation Pi = 1.19 inches One -hour Precipitation P1 = 2.70 inches Design Rainfall IDF Formula i = C1* P1/(C2+Tj"C3 Design Rainfall IDF Formula i = C1* P1/(C2+Tj"C3 Coefficient One C1 = 28.50 Coefficient One C1 = 28.50 Coefficient Two C2 = 10 Coefficient Two C2 = 10 Coefficient Three C3 = 0.789 Coefficient Three C3 = 0.789 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.35 Runoff Coefficient C = 0.49 Inflow Peak Runoff Qp-in = 6.76 cfs Inflow Peak Runoff Qp-in = 21.46 cfs Allowable Peak Outflow Rate Qp-out = 0.61 cfs Allowable Peak Outflow Rate Qp-out = 0.00 cfs Mod. FAA Minor Storage Volume = 8,903 cubic feet Mod. FAA Major Storage Volume = 66,264 cubic feet Mod. FAA Minor Storage Volume = 0.204 acre -ft Mod. FAA Major Storage Volume = 1.521 acre -ft 30 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5 -Minutes) Rainfall Duration minutes (input) Rainfall Intensity inches / hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) Rainfall Duration minutes (input) Rainfall Intensity inches / hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 30 1.85 0.162 0.67 0.40 0.017 0.145 30 4.19 0.513 0.67 0.00 0.000 0.513 60 1.19 0.208 0.58 0.35 0.029 0.179 60 2.69 0.660 0.58 0.00 0.000 0.660 90 0.90 0.235 0.56 0.34 0.042 0.194 90 2.03 0.747 0.56 0.00 0.000 0.747 120 0.73 0.255 0.54 0.33 0.054 0.201 120 1.65 0.810 0.54 0.00 0.000 0.810 150 0.62 0.271 0.53 0.32 0.067 0.204 150 1.40 0.860 0.53 0.00 0.000 0.860 180 0.54 0.284 0.53 0.32 0.079 0.204 180 1.23 0.901 0.53 0.00 0.000 0.901 210 0.48 0.295 0.52 0.32 0.092 0.203 210 1.09 0.936 0.52 0.00 0.000 0.936 240 0.43 0304 0.52 0.32 0.104 0.200 240 0.99 0.967 0.52 0.00 0.000 0.967 270 0.40 0.313 0.52 0.31 0.117 0.197 270 0.90 0.995 0.52 0.00 0.000 0.995 300 0.37 0.321 0.52 0.31 0.129 0.192 300 0.83 1.020 0.52 0.00 0.000 1.020 330 0.34 0.328 0.52 0.31 0.142 0.187 330 0.77 1.043 0.52 0.00 0.000 1.043 360 0.32 0.335 0.51 0.31 0.154 0.181 360 0.72 1.065 0.51 0.00 0.000 1.065 390 0.30 0.341 0.51 0.31 0.167 0.175 390 0.68 1.085 0.51 0.00 0.000 1.085 420 0.28 0.347 0.51 0.31 0.179 0.168 420 0.64 1.103 0.51 0.00 0.000 1.103 450 0.27 0.353 0.51 0.31 0.192 0.161 450 0.61 1.121 0.51 0.00 0.000 1.121 480 0.26 0.358 0.51 0.31 0.204 0.154 480 0.58 1.137 0.51 0.00 0.000 1.137 510 0.24 0363 0.51 0.31 0.217 0.146 510 0.55 1.153 0.51 0.00 0.000 1.153 540 0.23 0.368 0.51 0.31 0.229 0.139 540 0.53 1.168 0.51 0.00 0.000 1.168 570 0.22 0.372 0.51 0.31 0.242 0.131 570 0.51 1.182 0.51 0.00 0.000 1.182 600 0.22 0.377 0.51 0.31 0.254 0.122 600 0.49 1.196 0.51 0.00 0.000 1.196 630 0.21 0.381 0.51 0.31 0.267 0.114 630 0.47 1.209 0.51 0.00 0.000 1.209 660 0.20 0.385 0.51 0.31 0.279 0.105 660 0.45 1.222 0.51 0.00 0.000 1.222 690 0.19 0.388 0.51 0.31 0.292 0.097 690 0.44 1.234 0.51 0.00 0.000 1.234 720 0.19 0.392 0.51 0.31 0304 0.088 720 0.42 1.246 0.51 0.00 0.000 1.246 750 0.18 0.396 0.51 0.31 0.317 0.079 750 0.41 1.257 0.51 0.00 0.000 1.257 780 0.18 0.399 0.51 0.31 0.329 0.070 780 0.40 1.268 0.51 0.00 0.000 1.268 810 0.17 0.402 0.51 0.31 0342 0.061 810 0.39 1.279 0.51 0.00 0.000 1.279 840 0.17 0.406 0.51 0.31 0.354 0.052 840 0.38 1.289 0.51 0.00 0.000 1.289 870 0.16 0.409 0.51 0.31 0.367 0.042 870 0.37 1.299 0.51 0.00 0.000 1.299 900 0.16 0.412 0.51 0.31 0.379 0.033 900 0.36 1.309 0.51 0.00 0.000 1.309 930 0.15 0.415 0.51 0.31 0.392 0.023 930 0.35 1318 0.51 0.00 0.000 1318 960 0.15 0.418 0.51 0.31 0.404 0.014 960 0.34 1.327 0.51 0.00 0.000 1.327 990 0.15 0.421 0.51 0.31 0.417 0.004 990 0.33 1.336 0.51 0.00 0.000 1.336 1020 0.14 0.423 0.50 0.31 0.429 -0.006 1020 0.32 1.345 0.50 0.00 0.000 1.345 1050 0.14 0.426 0.50 0.31 0.442 -0.016 1050 0.32 1.353 0.50 0.00 0.000 1.353 1080 0.14 0.429 0.50 0.31 0.454 -0.025 1080 0.31 1.362 0.50 0.00 0.000 1.362 1110 0.13 0.431 0.50 0.31 0.467 -0.035 1110 0.30 1.370 0.50 0.00 0.000 1.370 1140 0.13 0.434 0.50 0.31 0.479 -0.045 1140 0.30 1.378 0.50 0.00 0.000 1.378 1170 0.13 0.436 0.50 0.31 0.492 -0.055 1170 0.29 1.386 0.50 0.00 0.000 1.386 1200 0.13 0.439 0.50 0.31 0.504 -0.065 1200 0.28 1.393 0.50 0.00 0.000 1.393 1230 0.12 0.441 0.50 0.30 0.517 -0.076 1230 0.28 1.401 0.50 0.00 0.000 1.401 1260 0.12 0.443 0.50 0.30 0.529 -0.086 1260 0.27 1.408 0.50 0.00 0.000 1.408 1290 0.12 0.446 0.50 0.30 0.542 -0.096 1290 0.27 1.416 0.50 0.00 0.000 1.416 1320 0.12 0.448 0.50 030 0.554 -0.106 1320 0.26 1.423 0.50 0.00 0.000 1.423 1350 0.11 0.450 0.50 0.30 0.567 -0.117 1350 0.26 1.430 0.50 0.00 0.000 1.430 1380 0.11 0.452 0.50 0.30 0.579 -0.127 1380 0.25 1.436 0.50 0.00 0.000 1.436 1410 0.11 0.454 0.50 030 0.592 -0.137 1410 0.25 1.443 0.50 0.00 0.000 1.443 1440 0.11 0.456 0.50 0.30 0.604 -0.148 1440 0.25 1.450 0.50 0.00 0.000 1.450 1470 0.11 0.458 0.50 0.30 0.617 -0.158 1470 0.24 1.456 0.50 0.00 0.000 1.456 1500 0.11 0.460 0.50 0.30 0.629 -0.169 1500 0.24 1.463 0.50 0.00 0.000 1.463 1530 0.10 0.462 0.50 0.30 0.642 -0.179 1530 0.24 1.469 0.50 0.00 0.000 1.469 1560 0.10 0.464 0.50 0.30 0.654 -0.190 1560 0.23 1.475 0.50 0.00 0.000 1.475 1590 0.10 0.466 0.50 0.30 0.667 -0.200 1590 0.23 1.481 0.50 0.00 0.000 1.481 1620 0.10 0.468 0.50 0.30 0.679 -0.211 1620 0.22 1.487 0.50 0.00 0.000 1.487 1650 0.10 0.470 0.50 0.30 0.692 -0.222 1650 0.22 1.493 0.50 0.00 0.000 1.493 1680 0.10 0.472 0.50 030 0.704 -0.232 1680 0.22 1.499 0.50 0.00 0.000 1.499 1710 0.09 0.474 0.50 0.30 0.717 -0.243 1710 0.22 1.504 0.50 0.00 0.000 1.504 1740 0.09 0.475 0.50 0.30 0.729 -0.254 1740 0.21 1.510 0.50 0.00 0.000 1.510 1770 0.09 0.477 0.50 0.30 0.742 -0.264 1770 0.21 1.516 0.50 0.00 0.000 1.516 1800 0.09 0.479 0.50 0.30 0.754 -0.275 1800 0.21 1.521 0.50 0.00 0.000 1.521 Mod. FAA Minor Storage Volume (cubic ft.) = 8,903 Mod. FAA Major Storage Volume (cubic ft.) = Mod. FAA Minor Storage Volume (acre -ft.) = 0.2044 Mod. FAA Major Storage Volume (acre -ft.) = UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 66,264 1.5212 UD-Detention - FAA Method (1).xlsm, Modified FAA 3/15/2023, 1:16 PM 18 STAGE -STORAGE SIZING FOR DETENTION BASINS Project: Terry Miller Basin ID: Dam A Y Side Slope Z L Flaw Side Slope Z Design Information (Input): Width of Basin Bottom, W = Length of Basin Bottom, L = Dam Side -slope (H:V), Zd = Stage -Storage Relationship: W' Side Slope Z ft ft ft/ft Side Slope Z Righ Isosceles F Circl L Check Basin Shape t Triangle i Triangle tectangle e / Ellipse Irregular _ Storage Requirement from Sheet 'Modified FAA': Storage Requirement from Sheet 'Hydrograph': Storage Requirement from Sheet 'Full -Spectrum': MINOR OR... OR... OR... OR... (Use Overide values in cells G32:G52) MAJOR 0.19 1.52 acre -ft. acre -ft. acre -ft. Labels for WQCV, & Major Stages (input) Storage Minor, Water Surface Elevation ft (input) Side Slope (H:V) ft/ft Below (input) El. Basin Width Stage (output) ft at Basin Length Stage ft (output) at Surface Area Stage ft2 (output) at Surface Area at Stage ft2 User Overide Volume Below Stage ft3 (output) Surface Area at Stage acres (output) Volume Below Stage acre (output) -ft Target Volumes for WQCV, & Major Volumes (for goal Storage Minor, seek) 8.00 4,322 0.099 0.000 9.00 0.00 0.00 5,731 5,027 0.132 0.115 10.00 0.00 0.00 7,348 11,566 0.169 0.266 11.00 0.00 0.00 9,177 19,829 0.211 0.455 12.00 0.00 0.00 11,220 30,027 0.258 0.689 13.00 0.00 0.00 13,484 42,379 0.310 0.973 14.00 0.00 0.00 15,973 57,108 0.367 1.311 15.00 0.00 0.00 18,964 74,576 0.435 1.712 16.00 0.00 0.00 21,652 94,884 0.497 2.178 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A finaldetention.xlsm, Basin 3/15/2023, 2:23 PM 18.1 Size Overflow Wier FOR SITE H = (Q/Cd*W)".667 Q= 27.27 cfs Cd= 3.1 H = (Q/Cd*W)".667 W= 25 ft H = (69/3.1*24)".667 Height= 0.498 ft 19 National Flood Hazard Layer FIRMette FEMA Legend 104°34'49"W 40°24136"N WELIIICOUNTY 80266: Ap Tom! Pu' S - taw alk: • ,a Ailk AFEKbKrc1uiI MAL FLT 08123CiSOSE eft 1/20/2016 TSN FICAWS17 0 250 500 1,000 1,500 2,000 Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 104°34'12"W 40°24'8"N Feet 1:6,000 SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone 4, V. 499 With BFE or Depth Zone AE, AO, AN, VF, AR Regulatory Floodway OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS CD O.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Future Conditions 1% Annual Chance Flood Hazard Area with Reduced Flood Risk due to Levee. See Notes. Zone X Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard zonex Effective LOM Rs Area of Undetermined Flood Hazard Zone D - Channel, Culvert, or Storm Sewer milli Levee, Dike, or Floodwall 20.2 Cross Sections with 1% Annual Chance 17'5 Water Surface Elevation 8 - - - - Coastal Transect vi Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary - - - - Coastal Transect Baseline - Profile Baseline Hydrographic Feature Digital Data Available No Digital Data Available Unmapped The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 2/6/2023 at 9:44 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. 20 40° 24'24"N 40° 24' 16" N [N 0 4 4 8 N - 104° 34' 42" W Hydrologic Soil Group —Weld County, Colorado, Southern Part 535780 535810 535840 535870 Soil Map may not be valid at this scale. 535780 535810 535840 535870 535900 535930 535960 535990 536020 536050 536080 536110 Map Scale: 1:1,610 if printed on A landscape (11" x 8.5") sheet. 0 20 40 80 535900 Meters 120 535930 ,Feet 0 50 100 200 300 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTT/1 Zone 13N WGS84 535960 535990 I 536020 536050 536080 I 104° 34' 27" W 536110 I c menial 4 104° 34' 27" W 40° 24'24"N 40° 24' 16" N ,b Natural Resources lain Conservation Service Web Soil Survey National Cooperative Soil Survey 12/15/2022 Page 1 of 4 21 10-40 Hydrologic Soil Group —Weld County, Colorado, Southern Part MAP LEGEND Area of Interest (AO!) Area of Interest (A01) ) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D kipii D Not rated or not available Soil Rating Points O O O A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background ,; Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Weld County, Colorado, Southern Part Survey Area Data: Version 21, Sep 1, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 8, 2021 Jun 12, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. ,b Natural Resources lain Conservation Service Web Soil Survey National Cooperative Soil Survey 12/15/2022 Page 2 of 4 22 Hydrologic Soil Group —Weld County, Colorado, Southern Part Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 1 Altvan loam, percent slopes 0 to 1 B 6.7 100.0% Totals for Area of Interest 6.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, BID, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, BID, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified e Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 12/15/2022 Page 3of4 23 Hydrologic Soil Group —Weld County, Colorado, Southern Part Tie -break Rule: Higher e Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 12/15/2022 Page 4of4 24 I 158 %VC -,, . HIGHWAY _I 1 f! :A M SITE I Vicinity SCALE 1" 2000' i 1 MI Cr. 3s Na 25 USE BY SPECIAL REVIEW (USR) PUBLIC WORKS TRAFFIC REQUIREMENTS Traffic Narrative: 1. Describe how many roundtrips/day are expected for each vehicle type: Passenger Cars/Pickups, Tandem Trucks, Semi-Truck/Trailer/RV (Roundtrip = One (1) trip in and One (1) trip out of site). There will be 40 roundtrips a day for Passenger cars aria pickups. 5 Roundtrips a day for tandem trucks. 12 roundtrips a day for Semi -Truck/ Trailer 2. Describe the expected travel routes or haul routes for site traffic. The passenger car and pickup traffic will be split 50% going each way on CR 58. The tandem trucks and semi trucks will mostly go east on CR 58 to CR 53. 3. Describe the travel distribution along the routes (e.g. 50% of traffic will come from the north, 20% from the south, 30% from the east, etc.). The passenger car and pickup traffic will be split 50% going each way on CR 58. The tandem trucks and semi trucks will go 10% west on C 58 and 90% East on CR 58 4. Describe the time of day that you expect the highest traffic volumes. The highest volume will be daylight hours in winter and 6:00 AM in the summer. 12/15/21 23 FOR COMMERCIAL OR INDUSTRIAL BUILDINGS, PLEASE COMPLETE THE FOLLOWING INFORMATION: Business Name: M&M Excavation Company Phone: 970-352-5220 Address: 25490 County Road 58 City, state, zip: Greeley, Colorado, 80631 Business Owner Tevy., ; (1ev' Phone: iq D5-i -Z Home Address: Sri° cu City, state, zip:.sPYeiel1C2.t co SOLo to List up to three persons in the order to be called in the event of an emergency: NAME lecr 6 lie yr TITLE Owner PHONE ADDRESS q7.- a• -a ..a as9oS19YL0 .._ncmc.IL Mona Pb, 970-G7 eatki_aeSiei kanagev Business Hours: QQN1— S'efin UTILITY SHUT OFF LOCATIONS: Main Electrical: AL- HZ A-) ITS c Gas Shut Off: 1153 ac'9QOctSB (eeie, la CI a° S3q-- ao99 954/50 WcizgB Gem (0 Days: s SUS - M —F 67,141))727,- r quo - AA ea - n u;t: --PkkoLir U.1)7 -sr i okow?� t.t or- VA - ; Exterior Water Shutoff: M;- ofk_ii I 16. isocuor or- �} [ Interior Water Shutoff: ie`, 5 i 4,} cr�''-' v��� ��� �'cO�`` % 'Aare l: 01: 11A- ,tom c& -T"L. V' )b et_ (1\kiti—Oi 12/15/21 13 WERNSMAN ENGINEERING AND LAND DEVELOPMENT LLC Eric Wernsman PO Box 105 LaSalle CO 80645 RE: Notice of Inquiry Reply Terry Miller and I met with the Town of Kersey on February 7, 2023 to discuss annexation in to Kersey. At this time Terry does not wish to annex in to Kersey. Please let us know if you have any questions. Eric Wernsman From: Danna Ortiz To: Chris Gathman Cc: Julie Piper; Christian Morgan Subject: PRE23-0005 Date: Tuesday, January 31, 2023 12:02:26 PM Attachments: image001.jpg PRE23-0005 - Kersey IGA.pdf Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning Chris, I hope that your 2023 is off to a great start. Thank you for sending us this referral. Kersey would like to annex this property. We are going to meet with Mr. Miller next Tuesday, February 7th to discuss his plans. Regards, Danna Va i is Or -ht Town Planner Town of Kersey 446 1st St. P.O. Box 657 Kersey, CO 80644 T: (970) 353-1681 Cell: (303) 884-4850 dortiz@kerseygov.com Kerseygov.com Color Logo Sender and receiver should be mindful that all my incoming and outgoing emails may be subject to the Colorado Open Records Act, § 24-72-100.1, et seq. Weld County Treasurer Statement of Taxes Due Account Number R5273408 Assessed To Parcel 096317200002 M&M EXCAVATION CO 25490 COUNTY ROAD 58 GREELEY, CO 80631-9750 Legal Description E2NW4 17-5-64 LOT B REC EXEMPT RE -4762 Year Tax Charge 2022 Tax Situs Address 25490 COUNTY ROAD 58 WELD Interest Fees Payments Balance Total Tax Charge $13,486.1.2 $0.00 $0.00 ($13,486.12) $0.00 $0 00 Grand Total Due as of 03/15/2023 $0.00 Tax Billed at 2022 Rates for Tax Area 0738 - 0738 Authority WELD COUNTY SCHOOL DIST RE7 NORTHERN COLORADO WATER (NC CENTRAL COLORADO WATER (CCW CENTRAL COLORADO WATER SUBD PLATTE VALLEY FIRE AIMS JUNIOR COLLEGE HIGH PLAINS LIBRARY WEST GREELEY CONSERVATION Taxes Billed 2022 * Credit Levy Mill Levy 15.0380000* 9.5530000 1.0000000 10680000 15820000 5.1650000 6.3070000 3.1810000 0.4140000 Amount $4,682.84 $2,974.81 $311.40 $332.57 $492.63 $1,608 38 $1,964 00 $990 57 $128.92 43 3080000 $13,486.12 Values Actual Assessed SPEC PURPOSE- $153,181 $44,420 LAND SPEC.PURPOSE- $892,382 $258,790 IMPROVEMENTS AG -FLOOD $27,595 $7,290 IRRRIGATED LAND AG -DRY FARM LAND $3,359 $890 AG -WASTE LAND $39 $10 Total $1,076,556 $311,400 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY, REAL PROPERTY, AND MOBILE HOMES - AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIER'S CHECK. POSTMARKS ARE NOT ACCEPTED ON TAX LIEN SALE REDEMPTION PAYMENTS. PAYMENTS MUST BE IN OUR OFFICE AND PROCESSED BY THE LAST BUSINESS DAY OF THE MONTH. Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 gs174 g Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer, are evidence of the status as of this date of all property taxes, special assessments, and prior tax liens attached to this account. Signed: Current year's taxes are due but not delinquent. Date: Weld County Treasurer Statement of Taxes Due Account Number R5273308 Assessed To Parcel 096317200001 M&M EXCAVATION CO 25490 COUNTY ROAD 58 GREET _EY. CO 80631-9750 Legal Description E2NW4 17-5-64 LOT A REC EXEMPT RE -4762 Year Tax Charge Tax Interest 2022 $91.82 $0.00 Fees $0.00 Situs Address 25296 COUNTY ROAD 58 WELD Payments Balance ($91.82) $0.00 Total Tax Charge $0.00 Grand Total Due as of 03/15/2023 Tax Billed at 2022 Rates for Tax Area 0738 - 0738 Authority WELD COUNTY SCHOOL DIST RE7 NORTHERN COLORADO WATER (NC CENTRAL COLORADO WATER (CCW CENTRAL COLORADO WATER SUBD PLATTE VALLEY FIRE AIMS JUNIOR COLLEGE HIGH PLAINS LIBRARY WEST GREELEY CONSERVATION Taxes Billed 2022 * Credit Levy Mill Levy 15 0380000* 9.5530000 1 0000000 1 0680000 15820000 5.1650000 6.3070000 3.1810000 0.4140000 Amount $31 89 $20.25 $2.12 43.3080000 $2 26 $335 $10.95 $13.37 $6.75 $0.88 $91 82 Values Actual AG -DRY FARM LAND $231 AG -WASTE LAND $2 OTHER BLDGS - $7,756 AGRICULTURAL Total $0.00 Assessed $60 $10 $2,050 $7,989 $2,120 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY, REAL PROPERTY, AND MOBILE HOMES - AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIER'S CHECK. POSTMARKS ARE NOT ACCEPTED ON TAX LIEN SALE REDEMPTION PAYMENTS PAYMENTS MUST BE IN OUR OFFICE AND PROCESSED BY THE LAST BUSINESS DAY OF THE MONTH Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 g_52:1 3 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer, are evidence of the status as of this date of all property taxes, special assessments, and prior tax liens attached to this account. Current year's taxes are due but not delinquent. Signed: Date: ,//15/2/3 Hello