Loading...
HomeMy WebLinkAbout20231424.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROAD 54 BETWEEN COUNTY ROADS 43 AND 45 FOR APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 54, between County Roads 43 and 45 to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective June 6, 2023, for approximately four (4) days for a culvert replacement. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 54, between County Roads 43 and 45, be temporarily closed, with said closure being effective June 6, 2023, for approximately four (4) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc: So(Rs), p:spatct,, cs? 05/31/23 2023-1424 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 54 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 22nd day of May, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: W,,) JCLto:tie. Mi se-Pceeman, Chair Weld County Clerk to the Board BY: APP ounty Attorney Date of signature: O5/3O/2 Lori Saine 2023-1424 EG0024 MEMORANDUM TO: Clerk to the Board DATE: May 17, 2022 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 36 between WCR 15 and WCR 17 was closed from 5/30/2023 thru 6/2/2023 for culvert replacement. . WCR 54 between WCR 43 and WCR 45 was closed from 6/6/2023 thru 6/9/2023 for culvert replacement See attached closure diagrams. 2023-1424 /2l EC-, 0024 www.invarion.com W20-3 I A W20-3 M4-10 W20 -1F M4-9 —71147 iap no H C ' J 0 I- W 0 anol3a M4-9 a m -4 O c M4-9 W20-3 W20 -1F ece S 4 N M r a 0 4 a 1 a 4 I I PISS _ W20-3 ,..aa. a.aa _'s-' S PROJECT # AN -59 ROAD CLOSURE DESCRIPTION WCR 54 between WCR 43 and WCR 45 closed 6/6/2023 thru 6/9/2023 for culvert replacement NOTICE TO PUBLIC Road signs and barricaded Message boards to be used DETOUR ROUTE WCR 45 between WCR 54 and WCR 52 1 mile gravel WCR 52 between WCR 45 and WCR 43 1 mile gravel WCR 43 between WCR 52 and WCR 54 1 mile paved NOTES. ADT of WCR is: 2152/2019 Culvert replaced is irrigation: Old: 15" Round CMP New" 18" RCPR Culvert is .1 East Prepared by: Ryan Reynolds 5/17/2023 Hello