Loading...
HomeMy WebLinkAbout20231409.tiffUSE BY SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE: AMOUNT $ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: PLANNER ASSIGNED: PROPERTY INFORMATION Is the property currently in violation? F - No/ Yes Violation Case Number: Parcel Number: 1 3 0 5 _ 2 0 _ 0 _ 0 0 _ 0 1 3 --- --- --- --- --- --- --- --- --- --- --- --- Site Address: Currently No Address. Legal Description: PT SW4 20-2-64 LOT B REC EXEMPT RE -3024 (.54R) Section: 20 , Township 2 Within subdivision or townsite? F- N, Range 64 W Zoning District: A No /1— Yes Name: Acreage: 7.0205 Water (well permit # or water district tap #): Sewer (On -site wastewater treatment system permit # or sewer account #): Floodplain No / P Yes Geological Hazard No / PROJECT USR Use being applied for: Bulk Natural Gas Compression Station Name of proposed business: Voltagrid LLC r Yes Airport Overlay F - No/ T Yes PROPERTY OWNER(S) (Attach additional sheets if necessary.) Name: Voltagrid LLC (Representative: Soren Maloney) Company: Voltagrid LLC Phone #: 832-983-5052 403-874-7180 Street Address: 917 Mulberry Lane TJ Gill Email: soren.maloney@voltagrid.com TJ.Gill@Voltagrid.com City/State/Zip Code: Bellaire, TX 77401 APPLICANT/AUTHORIZED AGENT (Authorization Form must be included if there is an Authorized Agent) Name: Luke Seeber Company: Baseline Engineering Phone #: 970-556-5284 Email: luke.seeber@baselinecorp.com Street Address: 4007 S Lincoln Avenue #405 City/State/Zip Code: Loveland, CO 80537 I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our) knowledge. All fee owners of the property must sign this application. If an Authorized Agent signs, an Authorization Form signed by all fee owners must be included with the application. If the fee owner is a corporation, evidence must be included indicating the signatory has the legal authority to sign for the corporation. Signature Soren Maloney TJ Gill 12/2/2022 Date Signature Date Print Print 12/15/21 9 I, (We) VoltaGrid LLC AUTHORIZATION FORM (Owner -- please print) DEPARTMENTS OF PLANNING BUILDING, DEVELOPMENT REVIEW AND ENVIRONMENTAL HEALTH 1555 NORTH 17TH AVENUE GREELEY, CO 80631 give permission to Baseline Engineering/ Luke Seeber (Authorized Agent/Applicant—please print) to apply for any Planning, Building, Access, Grading or OWTS permits on our behalf, for the property located at (address or parcel number) below: Parcel Number 1305-20-0-00-013 Legal Description: PT SW4 20-2 64 LOT B REC EXE of Section 20 Township 2 N, Range 64 Subdivision Name: NfA Lot Block Property Owners Information: Address: 917 Mulberry Lane, Bellaire TX 77401 OR 10800 Telge Rd Houston TX 77095 Phone: 403-874-7180 E-mail: TJ.Gill@voltagrid.com Authorized Agent]Applicant Contact Information: Address: 4007 S Lincoln Avenue, #405, Loveland, CO 80537 Phone: 970-556-5284 E -Mail: luke.seeber@baselinecorp.com Correspondence to be sent to: Owner El Authorized Agent/Applicant El by: Mail EI Email Additional Info: _ I (We) hereby certify, under penalty of perjury and after carefully reading the entire contents of this document, that the information stated above is true and correct to the best of my (our) knowledge. Date 31 2.z/ 2 L3 Date Owner Signature — Teillinekef Singh Gi11 Owner Signature C birec3-vr ce� �Yte Gompa1 •) Subscribed and sworn to before me this Land day of M t(rc1i1 Te, noler si+l rl x'01 My commission expires No k'X() -1,,S A M RYY11t( , 20 by Notary Pub!' vRUCt f, . iatrnyE M V,,5RON Barra .tor $rSolicitor and Notary_ -15. 1ic`in and for the .ProvL Ce-Of Alberta *tea VoltaGrid 10800 Telge Rd Houston, Texas 77095 January 4, 2023 Re: Letter of Authority VoltaGrid authorizes TJ Gill, Director of Natural Gas Processing and Facilities to apply for permits on its behalf for the CNG Station in Weld County. If you have any questions, please contact me at 281-636-3074 Regards, /t2. O67W Nathan Ough President and CEO USE BY SPECIAL REVIEW (USR) PLANNING QUESTIONNAIRE 1. Explain the proposed use and business name. Voltagrid LLC intends to run a bulk compressed natural gas (CNG) station. The facility will be able to compress upwards of 20 million cubic feet of natural gas per day. 2. Explain the need for the proposed use. CNG is provided to a wide range of customer applications making their operations more environmentally friendly by displacing diesel with natural gas. 3. Describe the current and previous use of the land. The property is currently Agricultural Land. 4. Describe the proximity of the proposed use to residences. The nearest residences to the property are approximately 1,500 feet to the South of the proposed use. 5. Describe the surrounding land uses of the site and how the proposed use is compatible with them. To the North-West of this property is the Cureton Natural Gas Plant. Since this use is also utilizes natural gas, these would be highly compatible uses. All other directions contain Agricultural lands, which will not be affected by the proposed land use. 6. Describe the hours and days of operation Hours are anticipated to be 7:00am to 5:00pm Sunday -Sunday. 7. Describe the number of employees including full-time, part-time and contractors. If shift work is proposed, detail number of employees, schedule and duration of shifts. The site will have up to 8 full time personnel that work in shifts. Shift hours are to be determined, but there will be at least 1 technician and at least two truck drivers available per shift. 8. Describe the maximum number of users, patrons, members, buyers or other visitors that the site will accommodate at any one time. Visitors or customers are not intended to come onsite. Drivers for Voltagrid will deliver the CNG to customers off -site. 9. List the types and maximum numbers of animals to be on the site at any one time. No animals will be on site. 10. List the types and number of operating and processing equipment. One (1) transformer pad, one (1) gas dryer skid, four (4) compressor buildings, four (4) dispensers (fill posts), one (1) dolly pad, and one electrical sea -can (40' container). 11. List the types, number and uses of the existing and proposed structures. There are no existing structures on site. The proposed structures will include an office, maintenance shop, and vehicle wash bay. The station will also include one (1) transformer pad, one (1) gas dryer skid, four (4) compressor buildings, four (4) dispensers (fill posts), one (1) dolly pad, and one electrical sea -can (40' container). 12. Describe the size of any stockpile, storage or waste areas. There will be a locked storage location for lubricants, and used lubricants will be stored in OSHA approved waste containers and removed from the site periodically by approved waste handlers. No more than 100 gallons of lubricant will be stored at any given time on location. There will be no storage of natural gas beyond what is being loaded into trailers for transportation and delivery to customer locations. 13. Describe the method and time schedule of removal or disposal of debris, junk and other wastes associated with the proposed use. Used lubricants will be stored in OSHA approved waste containers and removed from the site periodically by approved waste handlers. No more than 100 gallons of lubricant will be stored at any given time on location. The waste management plan included with this submittal describes further details regarding handling and disposal of waste matmerials. 14. Include a timetable showing the periods of time required for the construction of the operation. Construction is anticipated to be done all in one phase. 15. Describe the proposed and existing lot surface type and the square footage of each type (i.e. asphalt, gravel, landscaping, dirt, grass, buildings). • Existing Lot = 304,920 sq. ft. (7.00 acres) o Existing field = 279,159 sq. ft. (6.40 acres) o WCR 51 Gravel = 14,829 sq. ft. (0.34 acres) o Dirt = 10,932 (0.26 acres) • Proposed Lot = 304,920 sq. ft. (7.00 acres) o Building = 14,200 sq. ft (0.32 acres) o Compacted Road Base = 175,839 sq. ft. (4.03 acres) o Concrete = 5,693 sq. ft. (0.13 acres) o WCR 51 Gravel = 14,829 sq. ft. (0.34 acres) o Native Grasses = 54,242 sq. ft. (1.25 acres) o Dirt = 40,117 sq. ft. (0.92 acres) 16. How many parking spaces are proposed? How many handicap -accessible parking spaces are proposed? 10 parking spaces are proposed. Of the 10, 1 will be handicap -accessible. 17. Describe the existing and proposed fencing and screening for the site including all parking and outdoor storage areas. A 6 -foot -high chain link fence is proposed around the perimeter of the site. There is currently no existing fences or screening on site. 18. Describe the existing and proposed landscaping for the site. There is no formal landscaping on the site currently. The site currently contains natural vegetation across the site. Landscaping meeting Weld County requirements is proposed (See attached landscape plan for more detail). 19. Describe reclamation procedures to be employed as stages of the operation are phased out or upon cessation of the Use by Special Review activity. Voltagrid has no intentions of ceasing operations of this facility. This facility is intended to be a long-term operation, however should the CNG station no longer be need, equipment will be removed from the site and any vegetation on site will be returned to previous conditions as required by County standards. 20. Describe the proposed fire protection measures. There are adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and the county. All roads leading to, and those in the site area, are designed and maintained to support fire apparatuses. Sufficient turnaround room to accommodate fire apparatus is present. Voltagrid personnel in the field are on call to provide technical assistance in fire prevention and suppression. 21. Explain how this proposal is consistent with Weld County Comprehensive Plan per Chapter 22 of the Weld County Code. Voltagrid has reviewed the Comprehensive Plan as outlined in Chapter 22 of the Weld County Code and believe this project is consistent with its guiding principles. Section 22-2-10(D) emphasizes extraction of natural resources as an important part of the economy and should minimize impacts to agricultural lands. This use is a support service for extraction. Additionally, the site would utilize a currently non -irrigated portion of agricultural land. 22. Explain how this proposal is consistent with the intent of the zone district in which it is located. The CNG station is classified by Weld County as an Oil and Gas Support and Services facility. Section 23-3-40.W of the Weld County Code states that these facilities are uses allowed for construction, occupation, and maintenance in the A (Agricultural) Zone District only upon approval of a Use by Special Review permit in accordance with the requirements and procedures set forth in Article II, Division 4 of Chapter 23. 23. Explain how this proposal will be compatible with future development of the surrounding area or adopted master plans of affected municipalities. The proposed USR is surrounded by agricultural properties and existing oil and gas facilities. This site will provide support to neighboring business in the surrounding area. 24. Explain how this proposal impacts the protection of the health, safety and welfare of the inhabitants of the neighborhood and the County. CNG is provided to a wide range of customer applications making their operations more environmentally friendly by displacing diesel with natural gas. 25. Describe any irrigation features. If the proposed use is to be located in the A (Agricultural) Zone District, explain your efforts to conserve prime agricultural land in the locational decision for the proposed use. There are no plans to irrigate the property. Prior to this use, the leased land was non -irrigated rangeland. 26. Explain how this proposal complies with Article V and Article XI of Chapter 23 if the proposal is located within any Overlay Zoning District or a Special Flood Hazard Area identified by maps officially adopted by the County. The property is not located within any Overlay Zoning District or Special Flood Hazard Area identified by maps officially adopted by the County. 27. Detail known State or Federal permits required for your proposed use(s) and the status of each permit. Provide a copy of any application or permit. Air Permit and Manufactured Building Permit. The applications for these permits are currently in process. Use by Special Review (USR) Environmental Health Questionnaire 1. Discuss the existing and proposed potable water source. If utilizing a drinking water well, include either the well permit or well permit application that was submitted to the State Division of Water Resources. If utilizing a public water tap, include a letter from the Water District, a tap or meter number, or a copy of the water bill. The operation will require water for personal use, and cleaning of property and equipment. Water needs will be supplied from bottled water pending approval of a well permit from the State DNR. Well Permit Application attached. 2. Discuss the existing and proposed sewage disposal system. What type of sewage disposal system is on the property? If utilizing an existing on -site wastewater treatment system, provide the on -site wastewater treatment permit number. (If there is no on -site wastewater treatment permit through the Department of Public Health and Environment prior to submitting this application.) If a new on -site wastewater treatment system will be installed, please state "a new on -site wastewater treatment system is proposed." (Only proposed portable toilets if the use is consistent with the Department of Public Health and Environment's portable toilet policy.) There is currently no existing sewer system on -site. Truck wash wastewater will be contained in a vault which will be periodically emptied and transported to a nearby disposal facility. Portable toilets will also be provided on -site until an OWTS Permit is approved from Weld County for the construction and use of a proposed leach field. The leach field will be situated on the east side of the property. 3. If storage or warehousing is proposed, what type of items will be stored? Storage on -site will include no more than 100 gallons of lubricant in a locked storage location. 4. Describe where and how storage and/or stockpile of wastes, chemicals, and/or petroleum will occur on this site. Used lubricants will be stored in OSHA approved waste containers and removed from the site periodically by approved waste handlers. No more than 100 gallons of lubricant will be stored at any given time on location. There will be no storage of natural gas beyond what is being loaded into trailers for transportation and delivery to customer locations. 5. If there will be fuel storage on site, indicate the gallons and the secondary containment. State the number of tanks and gallons per tank. There will be no fuel storage on site beyond the natural gas that is being loaded into trailers for transportation and delivery to customer locations. 6. If there will be washing of vehicles or equipment on site, indicate how the wash water will be contained. Wash water will be contained in an underground vault that will periodically be emptied and transported to an appropriate disposal facility. 7. If there will be floor drains, indicate how the fluids will be contained. Floor drains will be utilized to capture wash and maintenance waste fluids and transport them to a vault for storage. Additional floor drains will connect bathroom and sink facilities to the proposed septic tank and leach field located east of the building. 8. Indicate if there will be any air emissions. Air emissions on -site are anticipated to be primarily methane. An APEN application is attached, and the air permit process is on -going with the state. 9. Provide a design and operations plan if applicable. A design and operations plan can be provided if necessary. Trucks will drive through the Northern gate of the site, fill at the filling station, and then drive out the southern gate. 10. Provide a nuisance management plan if applicable. A nuisance management plan can be provided if necessary. No nuisances are anticipated for this operation. Use by Special Review (USR) Development Review Questionnaire 1. Describe the access location and applicable use types of all existing and proposed accesses to the parcel. Include the approximate distance each access is (or will be if proposed) from an intersecting county road. State that no existing access is present or that no new access is proposed, if applicable. There are no existing access points to the parcel. Two accesses are proposed due to limited area within the parcel for trucks to navigate one access point. The north access is approximately 150' from a field access into the northern property. The southern gate is approximately 300' south of that, and 2,200 feet from the Weld County Road 18 and 51 intersection, which is the closest intersection to the site. 2. Describe any anticipated change(s) to an existing access, if applicable. There are no existing access points to the site. All access points would be new. 3. Describe in detail any existing or proposed access gate including its location. There are no existing access gates, and 2 access gates are proposed offset 50' from WCR 51 to allow for a WB-40 truck -trailer to pull off the County road before accessing the site. The access gates would be near each end of the western property line. The north gate is 150' south of the north property line. The south access is 335' south of the north access. 4. Describe the location of all existing accesses on adjacent parcels and on parcels located on the opposite side of the road. Include the approximate distance each access is from an intersecting county road. The Northern adjacent property has an existing access close to the shared property line between the parcels, and a similar access point is located across the street for what appears to be multiple properties. To the south there are no additional access points for over 1,200 feet. 5. Describe any difficulties seeing oncoming traffic from an existing access and any anticipated difficulties seeing oncoming traffic from a proposed access. There are no anticipated visibility issues with the proposed access points. 6. Describe any horizontal curve in the vicinity of an existing or proposed access. The access points would be along Weld County Road 51, which has no curves and runs North - South along the Western Property line of the proposed site. 7. Describe the topography of the road in the vicinity of an existing or proposed access. The topography along the road is relatively flat in the vicinity of the proposed access points. Notice of Inquiry Weld County Pre -application Case # PRE22-0218 Date of Inquiry 9/23/2022 Municipality Keenesburg CPA Name of Person Inquiring VOLTAGRID, LLC c/o SOREN MALONEY Property Owner DONALD BELL Planner Michael Hall Planner Phone Number (970) 400-3528 Planner Email Address mhall@weldgov.com Legal Description LOT B RE -3024 Parcel Number 130520000013 Nearest Intersection CR 51 & CR 18 Type of Inquiry USR FOR OIL & GAS SUPPORT AND SERVICE (CNG STATION) The above person met with County Planning staff about developing a parcel of land inside your designated Intergovernmental Agreement/Coordinated Planning Agreement Boundary. /U✓, County Planner's signature Would you like to pursue annexation of this property? NO X YES Date of Contact 0\ I I\ \10 -17 -- Comments: M-e.k w\'<v\ \CaY\k ceT(c\vn9-(=AeY\k\et` --Mcv) vvave dULc\dQ. d v Y\o)s- wY sue, ayAnexaho n Pl innthqg f2imia C{t natu •f Mu ' ipality Representative Title , ce\'lYtSz.x -icw' of) I211 (2Z. 11425 Date Please sign and date to acknowledge that the applicant has contacted you and return this signed form to Weld County Department of Planning Services. Weld County Planning Department 1555 N 17th Ave, Greeley, CO 80631 - (970) 400-6100 - (970) 304-6498 Fax 20181107 Voltagrid LLC Voltagrid USR (PRE22-0218) Contact List of Gas and Pipeline Operators On -Site Existing Natural Gas Pipelines Cureton Midstream LLC 518 17th Street, Suite 1405 Denver, CO 80202 1-720-390-4555 Future Bulk Natural Gas Compression Facility Voltagrid LLC 10800 Telge Road Houston, TX 77095 1-888-508-1851 FOR COMMERCIAL OR INDUSTRIAL BUILDINGS, PLEASE COMPLETE THE FOLLOWING INFORMATION: Business Name: Address: Business Owner: Home Address: Voltagrid LLC 10800 Telge Road Phone: City, state, zip: Phone: City, state, zip: List up to three persons in the order to be called in the event of an emergency: NAME TITLE Voltagrid Emergency Contact # PHONE 1-844-807-1820 888-508-1851 Houston, TX 77095 ADDRESS Business Hours: 7AM-5PM Days: Sunday -Sunday UTILITY SHUT OFF LOCATIONS: Main Electrical: TBD Gas Shut Off: TBD Exterior Water Shutoff: TBD Interior Water Shutoff: TBD 12/15/21 12 Routine or Predictable Gas Venting APEN Form APCD-213 Air Pollutant Emission Notice (APEN) and Application for Construction Permit All sections of this APEN and application must be completed for both new and existing facilities, including APEN updates. Incomplete APENs will be rejected and will require re -submittal. Your APEN will be rejected if it is filled out incorrectly, is missing information, or lacks payment for the filing fee. The re -submittal will require payment for a new filing fee. This APEN is to be used only for routine or predictable gas venting emissions associated with oil and gas industry operations. If your emission source does not fall into this category, there may be a more specific APEN available for your source (e.g. gas venting, hydrocarbon liquid loading, condensate storage tanks, etc.). In addition, the General APEN (Form APCD-200) is available if the specialty APEN options will not satisfy your reporting needs. A list of all available APEN forms and associated addendum forms can be found on the Air Pollution Control Division (APCD) website. This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration of the five-year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc.). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Permit Number: AIRS ID Number: / / Section 1 - Administrative Information Company Name: Voltagrid LLC Site Name: Weld County CNG Station Site Location: N40.124154 / W104.580326 Mailing Address: 10800 Telge Rd (Include Zip Code) g Houston TX, 77095 Site Location County: Weld County NAICS or SIC Code: Contact Person: TJ Gill Phone Number: 403-874-7180 E -Mail Address2: tj.gill@voltagrid.com 1 Use the full, legal company name registered with the Colorado Secretary of State. This is the company name that will appear on all documents issued by the APCD. Any changes will require additional paperwork. 2 Permits, exemption letters, and any processing invoices will be issued by the APCD via e-mail to the address provided. 1 I a COLORADO Health Er Environmentt of Pu➢, Permit Number: AIRS ID Number: Section 2 - Requested Action 01 NEW permit OR newly -reported emission source ❑ Request coverage under traditional construction permit • Request coverage under General Permit GP11 If General Permit coverage is requested, the General Permit registration fee of $756.00 must be submitted along with the APEN filing fee. -OR- ❑ MODIFICATION to existing permit (check each box below that applies) ❑ Change equipment or activity ❑ Change company name3 ❑ Add point to existing permit ❑ Change permit limit ❑ Transfer of ownership4 ❑ Other (describe below) OR- ❑ APEN submittal for update only (Note blank APENs will not be accepted) - ADDITIONAL PERMIT ACTIONS - ❑ Limit Hazardous Air Pollutants (HAPs) with a federally -enforceable limit on Potential To Emit (PTE) Additional Info a Notes: The only emission reported on this document is methane, which is not a Criteria or Non -Criteria reportable pollutant per Regulation 3, Appendix B, II.D.1.00. 3 For company name change, a completed Company Name Change Certification Form (Form APCD-106) must be submitted. For sources covered by a General Permit, a new General Permit registration fee must be submitted for a company name change. 4 For transfer of ownership, a completed Transfer of Ownership Certification Form (Form APCD-104) must be submitted. For sources covered by a General Permit, a new General Permit registration fee must be submitted for a transfer of ownership. Section 3 - General Information Company equipment Identification No. (optional): For existing sources, facility operation began on: For new, modified, or reconstructed sources, the projected facility start-up date is: Normal Hours of Facility Operation: 24 hours/day April 1, 2023 7 days/week 52 weeks/year Facility type: ❑ Well Production Facility or Centralized Production Facility Other oil Et gas facility (upstream, midstream, or downstream) Is this stationary source located in any NAAQS nonattainment area? Yes ❑ No Is this stationary source considered a Major Source of HAP emissions? ❑ Yes No ,/ Are emissions from ALL routine or predictable gas venting activities/events at this stationary source reported on this APEN? Yes ❑ No If yes, and the activities/events were previously permitted separately, list the existing permit number(s) and AIRS ID point(s): Fugitive and point -source emissions from routine or predictable gas venting activities/events MUST be reported separately. If applicable, have fugitive and point- source emissions from routine or predictable gas venting activities/events at this stationary source been appropriately separated for APEN reporting purposes? Yes ❑ No .' Emissions reported on this APEN form are: Point -Source ❑ Fugitive .' COLORADO Department of Public Health 6 Environment Permit Number: AIRS ID Number: Section 4 - Venting Activities/Events Information Complete all fields for each venting activity/event type. Uncontrolled emissions from all point -source routine or predictable gas venting activities/events at a stationary source, including those separately reported/permitted, must be grouped together for comparison with the APEN reporting thresholds of Regulation 3, Part A Sections II.D.1.a and II.d.1.b, as applicable (fugitive and point -source emissions must be grouped separately). If the total grouped facility -wide emissions from all routine or predictable gas venting activities/events for any criteria and/or non -criteria pollutant exceeds the applicable APEN reporting threshold, all of those emissions must be reported on one or more APEN5. The operator may choose to report those emissions on separate APEN5. How many venting activity/event types are being reported on this APEN? 1 If greater than five (5), attach completed addendum(s) to this APEN form, using the Routine or Predictable Gas Venting APEN Addendum - Form APCD-215, available on the APCD website. Table 1: Process Information for Each Venting Activity/Event Type From what year is the actual annual amount? 2023 Activity/ Event ID Activity Description Actual Annual Process Amount (provide units)6 Requested Annual Process Limit s (provide units) Controlled? (yes or no) Control Method(s) Pollutants Controlled Overall Control Efficiency 7 Process Parameter Monitoring 8 1 CNG Hoses Venting 76102.5 scf 80,000 scf Yes Gas recoveryfoonservetcn before roses are cls000rected Methane A 2 3 4 5 5 Requested values will become permit limitations or will be evaluated for exempt status, as applicable, and should consider future process growth. Requested values are required on all APENs, including APEN updates. The APCD reserves the option to set individual process and/or emission limits for specific activity/event types. 6 Provide units that are relevant to the individual process (e.g. number of events per year, volume of gas vented annually, etc.). 7 If seeking coverage under the General Permit GP11, the requested control efficiency for a combustion device may not exceed 95%. 8 Select one of the following four process parameter monitoring options for each activity/event type: (A) event count; (B) volume measurement (flow meter); (C) volume calculation (parametric monitoring); or (D) other (description must be provided). Table 2: Criteria Pollutant Emission Factor Information by Activity/Event ID Pollutant Uncontrolled Emission Factors by Activity/Event ID 1 2 3 4 5 Emission Factor Units9 SCF TSP PMio PM2.5 SO,' NO. CO VOC Table 3: Non -Criteria Pollutant Emission Factor Information by Activity/Event ID Chemical Name Chemical Abstract Service (CAS) Number Uncontrolled Emission Factors by Activity/Event ID 1 2 3 4 5 Emission Factor Units9 \\NN\\\\ Benzene 71432 Toluene 108883 Ethylbenzene 100414 Xylene 1330207 n -Hexane 110543 2,2,4-Trimethylpentane 540841 Methanol 107018 9Emission factor units for each activity/event type must coincide with the units provided for Actual Annual Process Amount and Requested Annual Process Limit in Table 1. 3 I ai COLORADO Health Er Environmentt of Pu➢, Permit Number: AIRS ID Number: Section 5 - Geographical Information Geographical Coordinates (Latitude/Longitude or UTM) N40.124154 / W104.580326 Section 6 - Criteria Pollutant Emissions Information Additional Required Documentation (not required for APEN updates): Attach all relevant materials related to emission factor development, for all pollutants for all requested venting activities/events, including but not limited to: site -specific (or representative) sampling, calculation methodologies, etc. Facility Wide Emissions Inventory Form (Form APCD-102) From what year is the following reported actual annual emissions data? Use the following table to report the total combined criteria pollutant emissions from all venting activities/events reported on this APEN: Pollutant Actual Annual Emissions Requested Annual Permit Emission Limit(s)5 Uncontrolled Emissions (tons/year) Controlled Emissions1° (tons/year) Uncontrolled Emissions (tons/year) Controlled Emissions (tons/year) TSP PM1 o PM2.5 SOX NO„ CO VOC 5 Requested values will become permit limitations or will be evaluated for exempt status, as applicab e, and should consider future process growth. Requested values are required on all APEN5, including APEN updates. The APCD reserves the option to set individual process and/or emission limits for specific activity/event types. 10 Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, provide projected emissions. Section 7 - Non -Criteria Pollutant Emissions Information Are the total uncontrolled actual emissions of any non -criteria pollutant (e.g. HAP - hazardous air pollutant), from all venting activities/events reported on this APEN, equal to or greater than 250 lbs/year? ❑ Yes 0 No If yes, use the following table to report the total combined non -criteria pollutant (HAP) emissions from all venting activities/events reported on this APEN: Chemical Name Chemical Abstract Service (CAS) Number Actual Annual Emissions Uncontrolled Emissions (lbs/year) Controlled Emissions1° (lbs/year) Benzene 71432 Toluene 108883 Ethylbenzene 100414 Xylene 1330207 n -Hexane 110543 2,2,4-Trimethylpentane 540841 Methanol 107018 10 Annual emission fees will be based on actual controlled emissions reported. If source has not yet started operating, provide projected emissions. 4I6 COLORADO Health Er Environmentt of Pu➢, Permit Number: AIRS ID Number: Section 8 - Applicant Certification I hereby certify that all information contained herein and information submitted with this application is complete, true, and correct. If this is a registration for coverage under General Permit GP11, I further certify that this source is and will be operated in full compliance with each condition of General Permit GP11. 1/16/2023 Signature of Legally Authorized Person (not a vendor or consultant) Date TJ Gill Director Facilities and Natural Gas Processing Name (print) Title Check the appropriate box to request a copy of the: ❑ Draft permit prior to issuance ❑ Draft permit prior to public notice (Checking any of these boxes may result in an increased fee and/or processing time) This emission notice is valid for five (5) years. Submission of a revised APEN is required 30 days prior to expiration of the five year term, or when a reportable change is made (significant emissions increase, increase production, new equipment, change in fuel type, etc.). See Regulation No. 3, Part A, II.C. for revised APEN requirements. Send this form along with $242.00 and the General Permit registration fee of $756.00, if applicable, to: Colorado Department of Public Health and Environment Air Pollution Control Division APCD-SS-B1 4300 Cherry Creek Drive South Denver, CO 80246-1530 For more information or assistance, contact: Small Business Assistance Program cdphe_apcd_sbap@state.co.us APCD Main Phone Number (303) 692-3100 Make check payable to: Colorado Department of Public Health and Environment Alternatively, payment can be provided online, by credit card or electronic check, via the APCD Payment Portal. 5 I ai COLORADO Health Er Environmentt of Pu➢, Weld County Dept. of Planning Services 1555 N. 17th Ave. Greeley, CO 80631 Phone: (970)400-6100 Fax: (970)304-6498 Property Owner Name Company Voltagrid LLC Address 917 Mulberry Ln City Bellaire State TX Zip 77401 Phone (403) 874-7180 E-mail tj.gill@voltagrid.com Information The access is on CR 51 Nearest intersection: CR 51 & CR 18 ACCESS PERMIT APPLICATION FORM Authorized Agent/Applicant (if different from Owner) Name Luke Seeber Company Baseline Engineering Address 4007 S Lincoln Ave City Loveland Phone (970) 353-7600 State CO Zip 80537 E-mail luke.seeber@baselinecorp.com Proposed Access Information Culvert size & type (15" CMP/RCP min.) 15" / 15" Materials used to construct access Base Course Distance from intersection: 2200 ft. Access construction schedule TBD Parcel number: 130520000013 Section/Township/Range: 20 I 2N / 64W Total number of existing accesses to parcel: 0 Total number of proposed accesses: 2 Latitude N40.123579 Longitude W104.581308 Planning/building case number TBD Description of Work Approx. width of access 30' / 30' Proposed Access Count Residential 0 Existing Access Count Residential 0 Commercial 0 Oil and Gas 2 Agricultural 0 Temporary 0 Commercial 0 Oil and Gas 0 Agricultural 0 Construction of a bulk natural gas compression facility with two compacted base course access due to site constraints that limit truck movement and make one access point impossible. Required Attached Documents Property map or sketch (template available on pg. 2) indicating all proposed and existing accesses Access Pictures (N, 5, E, & W at the location where the access meets a county maintained road) Access Authorization Form (Not required if the application is signed by the property owner) Additional application materials may be required by the Department of Planning Services. Fee schedule $150 - Temporary & Residential $300 - Industrial & Commercial Submit application to accesspermits@weldgov.com By accepting this permit, the undersigned Property Owner/Authorized Agent, under penalty of perjury, verifies they have received all pages of the permit application; they have read and understand all the permit requirements and provisions set forth on all pages. By virtue of their signature the Property Owner/Authorized Agent is bound by and agrees to comply with all said permit requirements and provisions, all Weld County ordinances, and state laws regarding access construction. Signature Signature Printed Name Luke Seeber Printed Name TJ Gill multiple Property Owners/Authorized Agents) Date 1/11/2023 Date 1/11/2023 Accesses must be constructed within 1 year of issuance. An extension can be requested from the Weld County Department of Planning Services. Accesses must be in accordance to Chapter 8, Article XIV and Appendix 8-B of County Code Page 1 of 2 Parcel Sketch ♦ = Existing Access A= Proposed Access CR 20 te) CR /8 M OC V Page 2of2 M:\co-15587 — Voltagrid Weld County USR\Drawings\Construction Documents\15587 Site Plan.dwg, 1/5/2023 4:01:56 PM, Luke Seeber PO$SETT COLUMBINE TIC 130519000034 NORTHWEST CORNER SEC. 20, UN. R64W FOUND "6 REBAR WITH 2-1/2 INCH ALUMINUM DETENTION POND OUTLET STRUCTURE 30' ACCESS 15- CMP CULVERT ASHLEY JOHN It 130519090025 15" CMP CULVERT Know what's below. Call before you dig. 1 VOLTAGRID LLC. USE BY SPECIAL REVIEW - U5R22-XXXX LOCATED IN SECTION 20, TOWNSHIP 2 NORTH, RANGE 64 WEST OF THE 6th PRINCIPAL MERIDIAN WELD COUNTY, COLORADO O 30' PIPELINE EASEMENT TRA KWELL JUDITH C 02/12/2018 - REVOCABLE TRUST (REC. N0. 4374776) 130520000011 N 89'13'29" E t- -----------781.00' - � GAS CAS GAS " _ GAS GAS GAS 6' CHAIN LINK FENCE GASGAS W/3 -STRAND BARBED WIREGALS :a f GAS GAS GAS GAS GAS GAS GA OND SPILLWAY r Z=-- ---------- 0 co GAS cc 0 0 PG 8 A b0'P..0.W !� r.-IFUTURE 80' R.O.W. -1 I I TII I II 0T II I I I I RISER GAS GAS GAS GAS ----- DETENTION POND NO-BUILD/STORAGE AREA ELECTRIC SEACAN INLET/DRYER PIPE RACK COMPRESSORS (TYP.) PR. FLOOR DRAIN TANK 20' FILL POST (TIP.) DOLLY PAD GAS GAS GAS PR. EMPLOYEE PARKING PR. WATER WELL 4 - GAS - GAS GAS GAS 23.52' PR. EARTHEN BERM BELL DONALD L 130519000014 AS GAS EX. NATURAL GAS TRANSMISSION UNES GAS GAS PR. LEACH FIELD Gtr GAS GAS GAS GAS GAS GAS CAS S GAS GAS GAS GAS - GAS - GAS GAS 30' PIPELINE EASEMENT" - 01/25/2019 (RFC. Na 4462399) LEGEND EXISTING LINETYPES 5280 81 0 0 0 0 FiROPOSEO LINETYPES 5280 81 0 0 0 0 / / / / / / / / / / / f / / / / / / / / / / / EXISTING PROPOSED SYMBOLS SYMBOLS A 0 MB 0 ALIQUOT CORNER AS DESCRIBED CONTROL POINT ADA PARKING STALL LIGHT POLE POWER POLE GAS MARKER FIBER OP11C MARKER MAILBOX COMPACTED ROAD BASE N GRAPHIC SCALE 50 0 50 I -I I —I I- (IN FEET) 1 INCH = 50 FT SITE PLAN MAJOR CONTOUR (5' INTERVAL) MINOR CONTOUR (1' IN1ERVAL) PROPERTY BOUNDARY RIGHT-OF-WAY EASEMENT SECTION LINE EDGE OF GRAVEL CHAINLINK FENCE DITCH FLOWLINE EDGE OF BUILDING 100 1 1 >- m 0 J I — U CD CHECKED BY z z W 0 PREPARED BY REVISION DESCRIPTION WELD COUNTY VOLTAGRID LLC USR22-XXXX I— Ln 0 w CL' 0 z N 11 I^ z z 0 I- [L L.! N Cri I — U U w L!1 U- 0 tn LL 0 zz PREPARED UNDER THE DIRECT SUPERVISION OF C5l) FCR AI10 O11 BEHALF EF BASELINE CORPCRA1ICN INITIAL SUBNI1TAL XX/XX/XX CRANING SIZE 24' X 36* SURVEY FIRM SURVEY DATE BASELINE 10/26/2022 ,XOB NO. C015587 DRAWING NAME 15587 Site Hnn.dlg SHEET 2 OF 6 07 Facing North Facing East North Access Pictures s�yr If.• <y.. w fib;•° ? Wtitt I - Facing South 1N• ft. 3t-fyc = -Omit � .•- �rl Ll-.1 � • �l2 • .. f I SIACkgretere Facing West South Access Pictures Facing North r Aar ti .'44 _ Facing East Facing South I _ J ty0/1.-ft mil SP -r • ;Ma l' t �..r YrtRjjMl.'-c4,. �?;..: :tp•_. .r'-.'9, ra\.— .31'- — _2' -;-y Xr- Facing West Vo 10800 Telge Rd Houston, Texas 77095 January 4, 2023 Re: Letter of Authority i taCrd VoltaGrid authorizes Ti Gill, Director of Natural Gas Processing and Facilities to apply for permits on its behalf for the CNG Station in Weld County. If you have any questions, please contact me at 281-636-3074 Regards, ,E9 D* Nathan Ough President and CEO TRAFFIC IMPACT STUDY VB To: Weld County From: Baseline Corporation Date: May 3, 2023 Re: USR23-0011 Final Traffic Impact Study OVERVIEW This final traffic impact study is prepared to comply with Weld County Code and accompany the USR application for the Voltagrid WCR 22 Compressed Natural Gas Fill Station, a facility located in Weld County, Colorado. This facility is located in SE/4, Section 10, Township 2 North, Range 66 West of the 6th P.M. The proposed project includes an proposed 14,200 s.f. building (8,000sq. ft. office, 5,000 sq. ft. vehicle maintenance shop,1,200sq. ft. vehicle washing bay) and equipment to compress and supply transport trucks with natural gas. Up to 8 employees are anticipated to be on -site between 7 AM and 5PM. The subject site is located east of Weld County Road 51 in the northwest quarter of the southwest quarter of Section 20, Township 2 North, Range 64 West. The primary use of the site will be a bulk compressed natural gas (CNG) station. To demonstrate the traffic associated with the site, an overview is provided below of the expected traffic related to a CNG Station site. A section is also included below to discuss the expected traffic generated during the construction of the new building. BACKGROUND Traffic access: The site utilizes access located off of WCR 51. Currently, the location for the site access provides the best and most logical access for the site. No other road or access point serves this section of the property. Operational Equipment: The facility presently consists of 4 fill stations, fur compressors, a 14,200 s.f. office/shop building, a fresh water tank, and a septic tank. The information below assesses current traffic generation associated with the site operations. TRIP GENERATION Operational Traffic: The following table summarizes the anticipated traffic generation numbers per day on the site. All traffic numbers are spread over a 24 -hour period. Traffic numbers are separated based on the operational phase with which they are associated. The proposed building addition is not anticipated to significantly increase traffic. ITE 11th Edition Trip Generation numbers were used to calculate trips to and from the site. The Land Use Code to generate trips is General Light Industrial (110). The results are shown in Table 1 below, and the generation rates are attached to this document. 1 Table 1. Traffic Trip Generation Summary Table Average Weekday Operation — Totals It of Employees Total Daily Trips Hour (IN/OUT) AM Peak Trips Hour (IN/OUT) PM Peak Trips 8 25 6 (5/1) 6(2/4) General Light Industrial (110) The weekday morning and evening peak hour rates are calculated during the traditional commuting peak hours of the adjacent street traffic (that is, 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m.). Trip numbers provided by Voltagrid LLC show a total average of 18 daily trips. This additional average daily traffic will not affect the AM and PM peak hour trip estimates. Following are the anticipated roundtrips per day for the specified vehicle types. • Passenger/Pickup Trucks: 8-10 • Tandem Trucks: 0 • Semi -Trucks with Trailers: 10 100% of traffic will enter or leave to the south along WCR 51, and head south the WCR 18 for roughly 0.5 miles and a mile west to WCR 49 Using the newest trip generation methods and information provided by Voltagrid LLC, the proposed bulk GNC facility and 8 employees will generate an additional 24 round trips. The increase in vehicular traffic along WCR 51 due to this project will not affect the current level of service for nearby streets and intersections. Based on the information provided in this narrative, the proposed GCN facility will not negatively impact nearby traffic patterns in any way. The 11th edition ITE Manal predicts approximately 6 more daily trips than the information provided by Voltigrad. Therefore, the numbers provided in Table 1 are slightly more conservative and shall be used for this analysis. TRAFFIC HOURS Traffic associated with the site will be spread over a 24 -hour time period. Traffic will not be restricted to just one period of the day. The number of trucks accessing the site will depend on the compressed natural gas demand. Voltagrid estimates that the activities on site will equate to a maximum of 10 semi -truck trips per day. The greatest number of trips is expected to occur in the AM peak hour. ACCESS The new access is spaced roughly %2 mile north of WCR 18 and 200 feet from the nearest access or intersection. WCR 18 is a rural gravel surface County Road. 2 HAUL ROUTE & TRIP DISTRIBUTION South on WCR 51: The site will utilize the access located on WCR 51 approximately 1.5 miles east from the intersection of WCR 49 and WCR 18 . Leaving the site, the truck traffic will head south on WCR 51 which is currently a gravel road for roughly 1/2 mile to WCR 18. Based on the small number of truck trips paving is not anticipated at this time. The operation will require magnesium chloride applications at an appropriate interval to mitigate dust. West on WCR 18: From the site access, the truck traffic will have the ability to continue west on WCR 18 until it reaches the intersection of WCR 18 and WCR 49. From here the truck traffic will then continue north or south on WCR 49 to its destination. Please see the haul route map in Appendix 1 from more details. It is estimated that 80% of trips will head south and use 1-76. Traffic Impacts During Construction: During the construction of the proposed building, there is some associated traffic to be expected in addition to the normal operational traffic associated with the site. The initial construction of the proposed building will take approximately three (3) weeks with some building materials delivered to the site at the onset. For about 3-4 months following the construction of the building, 2-6 trades people can be expected travelling to and from the site at any given time as they work on interior finishes including flooring, electrical, etc. CONCLUSION The use of the site and associated traffic is consistent with similar uses on surrounding properties with a very close access from WCR 51 onto WCR 49 (Weld County Parkway) which is a 4 lane highway. The intersection of WCR 18 and WCR 49 has adequate line of site for proposed traffic volumes. In addition deceleration lanes and acceleration lanes exist on WCR 49 for all movements. Prepared under the supervision of: Noah J Nemmers, PE Baseline Corporation 112 N Rubey Drive, Suite 210 Golden, Colorado 80403 (303) 202-5010 3 APPENDIX 1. 4 Lane Use: 110 General Lieht In ustrial Description A light industrial facility is a free-standing facility devoted to a single use. The facility has an emphasis on activities other than manufacturing and typically has minimal office space. Typical light industrial activities include printing, material testing, and assembly of data processing equipment. Industrial park (Land Use 180) and manufacturing (Land Use 140) are related uses. Additional Data The technical appendices provide supporting information on time -of -day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- and-parki ng-generation/). The sites were surveyed in the 1980s, the 2000s, and the 2010s in Colorado, Connecticut, Indiana, New Jersey, New York, Oregon, Pennsylvania, and Texas. Source Numbers 106, 157, 174, 177, 179,184,191,251,258,286,800,611,874,875,912 30 Trip Generation Manual 11th Edition • Volume 3 items General Light Industrial (110) Vehicle Trip Ends vs: Employees On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 37 Avg. Num. of Employees: 71 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per Employee Average Rate Range of Rates Standard Deviation 3.10 1.53 - 23.50 1.81 Data Plot and Equation itt. General Urban/Suburban and Rural (Land Uses 000-399) 39 General Light Industrial (110) Vehicle Trip Ends vs: Employees On a: Weekday, AM Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies: 41 Avg. Num. of Employees: 76 Directional Distribution: 85% entering, 15% exiting Vehicle Trip Generation per Employee Average Rate Range of Rates Standard Deviation 0.69 0.23 - 4.00 0.30 Data Plot and Equation 42 Trip Generation Manual 11th Edition • Volume 3 itc General Light Industrial (110) Vehicle Trip Ends vs: Employees On a: Weekday, PM Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies: 41 Avg. Num. of Employees: 76 Directional Distribution: 31% entering, 69% exiting Vehicle Trip Generation per Employee Average Rate Range of Rates Standard Deviation 0.69 0.36 - 4.25 0.30 Data Plot and Equation itt. General Urban/Suburban and Rural (Land Uses 000-399) 43 MBASELINE Enginanding - Planning - Surra#ing November 2nd, 2022 Weld County Department of Planning 1555 North 17th Avenue Greeley, CO 80631 RE: Preliminary Traffic Impact Analysis for Voltagrid Weld County USR This memo has been prepared at the behest of Weld County to describe the vehicular traffic this project generates and the adequacy of the surrounding transportation network to handle said traffic. The proposed project includes an 8,000sq. ft. office building, 5,000 sq. ft. vehicle maintenance shop,1,200sq. ft. vehicle washing bay and equipment to compress and supply transport trucks with natural gas. Up to 8 employees are anticipated to be on -site between 7 AM and 5PM. The subject site is located east of Weld County Road 51 in the northwest quarter of the southwest quarter of Section 20, Township 2 North, Range 64 West. The primary use of the site will be a bulk compressed natural gas station. The proposed building addition is not anticipated to significantly increase traffic. ITE 11th Edition Trip Generation numbers were used to calculate trips to and from the site. The Land Use Code to generate trips is General Light Industrial (110). The results are shown in Table 1 below, and the generation rates are attached to this document. Table 1. Traffic Trip Generation Summary Table Average Weekday Operation —Totals # of Employees Total Daily Trips AM Peak Hour Trips (IN/OUT) PM Peak Hour Trips (IN/OUT) 8 25 6 (5/1) 6(2/4) General Light Industrial (110) The weekday morning and evening peak hour rates are calculated during the traditional commuting peak hours of the adjacent street traffic (that is, 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m.). Trip numbers provided by Voltagrid LLC show a total average of 18 daily trips. This additional average daily traffic will not affect the AM and PM peak hour trip estimates. Following are the anticipated roundtrips per day for the specified vehicle types. • Passenger/Pickup Trucks: 8-10 Steamboat Springs • Golden • Colorado Springs • Loveland Corporate Office: 112 North Rubey Drive, Suite 210; Golden, Colorado 80403 • Tandem Trucks: 0 • Semi -Trucks with Trailers: 10 Existing traffic patterns are anticipated to remain the same. 50% of traffic will enter or leave to the north along WCR 51, and 50% of traffic will enter or leave to the south along WCR 51. Using the newest trip generation methods and information provided by Voltagrid LLC, the proposed bulk GNC facility and 8 employees will generate an additional 24 round trips. The increase in vehicular traffic along WCR 51 due to this project will not affect the current level of service for nearby streets and intersections. Based on the information provided in this narrative, the proposed GCN facility will not negatively impact nearby traffic patterns in any way. The 11th edition ITE Manal predicts approximately 6 more daily trips than the information provided by Voltigrad. Therefore, the numbers provided in Table 1 are slightly more conservative and shall be used for this analysis. Sincerely, Luke Seeber, P.E. CC: Will Charles, Baseline Engineering Soren Maloney, Build West Construction LLC Attachments: • USR Site Map • ITE 11th Edition Trip Generation Rates Page 2 Land Use: 110 General Light Industrial Description A light industrial facility is a free-standing facility devoted to a single use. The facility has an emphasis on activities other than manufacturing and typically has minimal office space. Typical light industrial activities include printing, material testing, and assembly of data processing equipment. Industrial park (Land Use 130) and manufacturing (Land Use 140) are related uses. Additional Data The technical appendices provide supporting information on time -of -day distributions for this land use. The appendices can be accessed through either the ITETripGen web app or the trip generation resource page on the ITE website (https://www.ite.org/technical-resources/topics/trip- and-parking-generation/). The sites were surveyed in the 1980s, the 2000s, and the 2010s in Colorado, Connecticut, Indiana, New Jersey, New York, Oregon, Pennsylvania, and Texas. Source Numbers 106, 157, 174, 177, 179, 184, 191, 251, 253, 286, 300, 611, 874, 875, 912 30 Trip Generation Manual 11th Edition • Volume 3 General Light Industrial (110) Vehicle Trip Ends vs: Employees On a: Weekday Setting/Location: Number of Studies: Avg. Num. of Employees: Directional Distribution: General Urban/Suburban 37 71 50% entering, 50% exiting Vehicle Trip Generation per Employee Average Rate Range of Rates Standard Deviation 3.10 1.53 - 23.50 1.81 Data Plot and Equation Utz= General Urban/Suburban and Rural (Land Uses 000-399) 39 General Light Industrial (110) Vehicle Trip Ends vs: Employees On a: Weekday, AM Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies: 41 Avg. Num. of Employees: 76 Directional Distribution: 85% entering, 15% exiting Vehicle Trip Generation per Employee Average Rate Range of Rates Standard Deviation 0.69 0.23 - 4.00 0.30 Data Plot and Equation 42 Trip Generation Manual 11th Edition • Volume 3 General Light Industrial (110) Vehicle Trip Ends vs: Employees On a: Weekday, PM Peak Hour of Generator Setting/Location: General Urban/Suburban Number of Studies: 41 Avg. Num. of Employees: 76 Directional Distribution: 31% entering, 69% exiting Vehicle Trip Generation per Employee Average Rate Range of Rates Standard Deviation 0.69 0.36 - 4.25 0.30 Data Plot and Equation Ute= General Urban/Suburban and Rural (Land Uses 000-399) 43 Voltagrid LLC Voltagrid USR (PRE22-0218) Lighting Plan This plan has been prepared in accordance with a request from Weld County to describe the how the proposed site lighting will conform with Municipal Code Section 23-2-250 at the site located in Lot B of Recorded Exemption RE -3024 within the NW 1/4 of the SW 1/4 of Section 20, Township 2 North, Range 64 West in Weld County Colorado. It lies east of Weld County Road 51, halfway between Weld County Roads 18 and 20. Per Section 23-2-250, the site is required to meet the following criteria: 1. Sources of light, including light from high -temperature processes such as combustion or welding, shall be shielded so that light rays will not shine directly onto ADJACENT properties where such would cause a nuisance or interfere with the USE on the ADJACENT properties; and 2. Neither direct nor reflected light from any light source may create a traffic hazard to operators of motor vehicles on PUBLIC or private STREETS/ROADS and no colored lights may be used which may be confused with or construed as traffic control devices. The sources of light for the site include LED light fixtures placed around the site perimeter, as well as vehicle lights for traffic entering and leaving the property. Truck lighting is not anticipated to happen regularly, and will mainly occur during adverse weather conditions and seasonally when the sun is down during the operating hours of the facility listed as 7 AM to 5PM. The site proposes the use of eight LED light sources placed around the site perimeter. These light fixtures will be focused into the property, ensuring that there is very little light pollution to neighboring properties or Weld County Road 51. No colored lights are proposed that could be confused as traffic control devices. PRELIMINARY DRAINAGE EROSION CONTROL REPORT Voltagrid Weld County Weld County Road 51 Located in the NW 1/4 of the SW 1/4 of Section 20, Township 2 North Range 64 West of the 6th Principal Meridian, Weld County Colorado Applicant: VOLTAGRID LLC 917 Mulberry Ln, Bellaire, Texas 77401 Contact: Soren Maloney Soren.Maloney@Voltagrid.com (832) 983-5052 Prepared By: Baseline Engineering Corporation 4007 S Lincoln Ave Ste 405, Loveland, CO 80537 (970) 353-7600 Contact: Luke Seeber, P.E. December 5, 2022 IIPBASELINE 11 [I • Mooning: $urying Table of Contents Vicinity Map 2 I. Introduction 3 A. Location 3 B. Description of Property 3 II. Drainage Design Criteria 4 A. Regulations 4 B. Hydrological Criteria 4 C. Hydraulic Criteria 4 III. Drainage Facility Design 4 A. General Concept 4 B. Specific Details S IV. Maintenance 6 V. Conclusions 6 VI. References 7 APPENDIX 1 Appendix A 1 Appendix B 2 Appendix C 3 Drainage Plans 4 Weld County Drainage Code Certificate of Compliance Weld County Case Number: Parcel Number: 130520000013 Legal Description, Section/Township/Range: Lot B, RE -3024, S20/T2N/R641/ Date: 12/5/2022 Luke Seeber , Consultant Engineer for Voltagrid, LLC (Applicant), understand and acknowledge that the applicant is seeking land use approval of the case and parcel in the description above. I have designed or reviewed the design for the proposed land use set for in the application. I hereby certify, on behalf of the applicant, that the design will meet all applicable drainage requirements of the Weld County Code with the exception of the variance(s) described on the attached exhibits. This certification is not a guarantee or warranty either expressed or implied. Engineer's Stamp: Engineer of Record Signature Variance Request (If Applicable) 1. Describe the hardship for which the variance is being requested. 2. List the design criteria of the Weld County Code of which a variance is being requested. 3. Describe the proposed alternative with engineering rationale which supports the intent of the Weld County Code. Demonstrate that granting of the variance will still adequately protect public health, safety, and general welfare and that there are no adverse impacts from stormwater runoff to the public rights -of -way and/or offsite properties as a result of the project. Public Works Director/Designee Review (If Applicable) Public Works Director/Designee Name Date of Signature Comments: Signature Approved ❑ Denied Department of Public Works Development Review 1111 H Street, Greeley, CO 80631 I Ph: 970-304-6496 www.weldgov.com/departments/public works/development_ review 08/02/2019 Vicinity Map S 0- I n a i i a S SSP 1 4 SIJKrECF SITE '4l twin • .4 pa • flNN\ VICINITY MAP SrAtE Y = ?Der' • it t eau" iBASELINE q r V MW, ana • GtL4 d+W° #O 001101110 - e Sat -mftlailitall VT is'' '-.i..'I -eLT n ( EL9 cooNn u a i i 1 k 1T d - 7-4 SO. wit Ilea Orr Gn ri -+t a In baelit -a + St ♦ f i en oat I. Introduction A. Location 1. The site is located in Lot B , RE 3024, Section 20, Township 2 North, Range 64 West of the 6th Principal Meridian, Weld County, State of Colorado. 2. The site is located east of Weld County Road 51 halfway between Weld County Road 18 and Weld County Road 20 3. Weld County Road 51 borders the subject site on the west. On the north exists a private drive. To the east and south are existing agricultural fields. B. Description of Property 1. The project site area is approximately 7.00 acres. The developed area is 5.67 acres. 2. Existing ground cover for the site consists of cultivated landscape as well as native grass and weeds. The site is considered flat, with slopes generally vary from 1 to 5 percent. The developed property slopes from South to North. The "Weld County, Colorado, Southern Part (CO618)" soil survey prepared by the U.S. Department of Agriculture, Soil Conservation Service, indicates that the surface soils consist of Colby loam and Weld loam. See appendix A for NRCS soils report. 3. According to FEMA FIRM 08123C2155E, this site lies within Zone X, an area of minimal flood hazard. 4. This site is in a non -urbanizing area of Weld County. 5. The proposed use of the project area will be a compressed natural gas fueling station. The project will include an office building/washing facility with parking for employees as well as areas for equipment storage. 3 II. Drainage Design Criteria A. Regulations 1. The Weld County Engineering and Construction Criteria (WCECC), Weld County Storm Drainage Criteria, and the document a spreadsheet from the Weld County Development Review website, were used to design the site drainage facilities. B. Hydrological Criteria 1. Design rainfall is provided by the NOAA Atlas 14 Volume 8, Version 2 2. The rational method was utilized for hydrological calculations within this report, in accordance with the WCECC. 3. A detention pond is proposed for this site. 4. The design storm recurrence intervals are 10-yr and 100-yr for the minor and major storm events respectively. 5. All calculations within this report are in accordance with the applicable sections of the WCECC. C. Hydraulic Criteria 1. The drainage design for this site includes a detention pond, an outlet structure and access culverts. 2. No additional drainage facility design criteria were used outside of the WCSD criteria and applicable portions of the MHFD Criteria Manual. 3. Detention volume designed using the Modified FAA method in the UD- Detention v2.35 spreadsheet based on storing the proposed 100-yr runoff and releasing at the 10-yr historic release rate. Culverts were designed using Hydraflow Express. III. Drainage Facility Design A. General Concept 1. Runoff from the site will maintain the existing drainage pattern. Runoff from the existing agricultural land to the south will be diverted by a berm around the site to the northeast. A water quality detention pond will capture site runoff and release the 100-yr storm event at the 10-yr historic flow rate. 2. Two existing basins were included in the design of this site. Basin H1 includes 44.36 acres of primarily agricultural land that flows to the 4 southwest corner of the property. The majority of these offsite flows are directed around the proposed site to continue flowing north. Basin H2 covers only the parcel for the proposed project in order to calculate historic runoff rates for detention pond release. It is mostly covered in agricultural land. The 10-yr release rate was 3.78 CFS and the 100-yr release rate is 7.41 CFS. 3. There are two proposed basins for this project. Basin P1 is 4.83 acres, which covers the CNG facility pad, which includes the equipment, building, and detention pond. Flows are directed northeast into a detention pond that releases at the 10- year historic rate calculated from H2 basin. The developed imperviousness for the site is 41.8%. Runoff for this basin is 5.24 CFS for the 10-yr storm and 13.57 CFS for the 100-yr storm. In order to calculate the pond spillway runoff clearance, this basin was modified with the pond area as impervious, and the 100-yr flow rate increases to 14.48 CFS. Basin P2 was used to calculate roadside swale and access culvert capacities. It includes 15.30 acres, comprised of agricultural land and portions of WCR 51. The total imperviousness of this basin is 6.63%. The 10-yr runoff is 4.83 CFS and the 100-yr runoff is 8.69 CFS. • B. Specific Details 1. No major drainage problems were encountered in the design of this site. 2. A detention pond has been designed with an outlet structure to control release rates up to the 100 -year event, and release events greater than 100 -years via an emergency spillway with one foot of freeboard. The outlet structure has been designed with a water quality control plate that releases within 40 hours and a restrictor plate over the 12" outlet culvert will control the 100 -year release rate to 3.78 CFS. 3. Two 15" CMP access culverts are proposed along WCR 51 to allow water to continue flowing along the east roadside. There was not an existing swale here originally, so the area was regraded to allow for culverts and still meet the existing topography at the north and south ends of the site. There is capacity for the 10-yr flow rates and acceptable overt overtopping depths for the 100-yr storm runoff per the WCECC. 4. Stormwater quality will be maintained via the detention pond outlet structure, as well as riprap outlet protection on the downstream ends of culverts to capture sediment other pollutants prior to flowing downstream. 5. The drainage facilities for this project shall be maintained by the owner in accordance with the WCECC Guidelines. Side slopes are 4 to 1 or less to accommodate access as needed to maintain the function of the drainage facility. Debris and other accumulations that might reduce the storage capacity of the pond shall be monitored and removed as necessary. IV. Maintenance A. INSPECTIONS 1. During construction/ Inspections shall be performed every 14 days, or within 72 hours of precipitation event. 2. After the pad has been completed and the area has been reseeded, inspections shall be performed once per month. B. MAINTENANCE 1. The pond, Spillway, and culvert shall be routinely inspected, cleaned and repaired as necessary to insure proper performance. Erosion and sediment control structures shall be inspected and repaired as necessary to maintain proper performance that will minimize sedimentation and prolong the proper operation of the detention pond and outlet structure. V. Conclusions 1. The drainage design included in this report was prepared in accordance with the Weld County Engineering and Construction Criteria. Offsite flows will be redirected around the site to continue along historic drainage patterns. Runoff generated from the site will be contained and released in a controlled manner, and a maintenance plan has been provided All drainage design conforms to the criteria and requirements of the Weld County Storm Drainage Criteria VI. References 1. 1. Weld County Engineering and Construction Criteria. Weld County. January 2021. 2. Weld County Storm Drainage Criteria (Addendum to the Urban Storm Drainage Criteria Manuals Volumes 1, 2, and 3); RESPEC, Inc. July 31, 2020. 3. Urban Storm Drainage Criteria Manual, Volumes 1, 2 & 3; Mile High Flood District, Denver, CO. Updated January 2016. Vol. 1 revised August 2018. Vol. 2 revised Sept. 2017. Vol. 3 revised Jan. 2021 7 APPENDIX Appendix A Soil Data and FEMA FIRMETTE 40° 7 26" N 40° 7 17" N • • 104° 35'7"W 104° 35'7"W 5335340 535380 535340 535380 535420 Hydrologic Soil Group —Weld County, Colorado, Southern Part 535460 Map Scale: 1:1,970 if printed on A landscape (11" x 8.9') sheet. 0 25 50 100 Feet 0 50 100 200 300 535500 Meters 150 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTT/1 Zone 13N WGS84 535540 535580 535620 535660 535700 535740 104° 34' 49" W • S 7- 7- 7- 7- 40° 7 26" N 40° 7 17" N ,b Natural Resources lain Conservation Service Web Soil Survey National Cooperative Soil Survey 9/23/2022 Page 1 of 4 10-40 Hydrologic Soil Group —Weld County, Colorado, Southern Part MAP LEGEND Area of Interest (AO!) Area of Interest (A01) ) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D kipii D Not rated or not available Soil Rating Points O O O A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background ,; Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Weld County, Colorado, Southern Part Survey Area Data: Version 20, Aug 31, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 8, 2021 Jun 12, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. ,b Natural Resources lain Conservation Service Web Soil Survey National Cooperative Soil Survey 9/23/2022 Page 2 of 4 Hydrologic Soil Group —Weld County, Colorado, Southern Part Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 15 Colby loam, percent 1 slopes to 3 B 2.6 29.3% 16 Colby loam, 3to5 percent slopes B 0.2 2.3% 79 Weld percent loam, 1 slopes to 3 C 6.0 68.3% Totals for Area of Interest 8.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, BID, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or CID), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. e Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 9/23/2022 Page 3of4 Hydrologic Soil Group —Weld County, Colorado, Southern Part Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher e Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 9/23/2022 Page 4of4 Hydrologic Soil Group —Weld County, Colorado, Southern Part fn A 40° 7 28" N 40° 71" N 535300 535400 535500 535600 x5700 535300 535400 535500 Map Scale: 1:4,050 if printed on A portrait (8.5" x 11") sheet. 535600 Meters 0 50 100 200 300 Feet 0 150 300 600 900 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: LJTM Zone 13N WGS84 535700 535800 c•rattallia 535800 104° 34' 45" W 7- 7- 7- 40° 7 28" N 40° 7 1"N Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 11/22/2022 Page 1 of 4 10-40 Hydrologic Soil Group —Weld County, Colorado, Southern Part MAP LEGEND Area of Interest (AO!) Area of Interest (A01) ) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D kipii D Not rated or not available Soil Rating Points O O O A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background ,; Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Weld County, Colorado, Southern Part Survey Area Data: Version 21, Sep 1, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jun 8, 2021 Jun 12, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. ,b Natural Resources lain Conservation Service Web Soil Survey National Cooperative Soil Survey 11/22/2022 Page 2 of 4 Hydrologic Soil Group —Weld County, Colorado, Southern Part Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 15 Colby loam, percent 1 slopes to 3 B 16.1 34A% 16 Colby loam, 3 percent slopes to 5 B 23.0 49.3% 79 Weld percent loam, 1 slopes to 3 C 7.6 16.2% Totals for Area of Interest 46.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, BID, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or CID), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. e Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 11/22/2022 Page 3of4 Hydrologic Soil Group —Weld County, Colorado, Southern Part Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher e Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 11/22/2022 Page 4of4 Appendix B Hydrology Calculations CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR P2 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = P2 15.30 6.63 B Acres A, B, C, or D II. Rainfall Information I (inch/hr) = Cl * P1 /(C2 + Td)"C3 Design Storm Return Period, Tr = 01= C2= C3= P1= 100 28.50 10.00 0.786 1.40 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.36 0.09 Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach 1 Reach 2 1. - overland flaw • LEGEND ( Beginning - Flow D iredio n Cate kreof B ounda.ry NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0220 500 0.09 N/A 0.27 31.43 1 0.0220 1,114 2 0.0150 516 3 4 5 Sum 2,130 10.00 1.48 12.52 10.00 1.22 7.02 Computed Tc = Regional Tc = User -Entered Tc = IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 1.58 inch/hr Peak Flowrate, Qp = Rainfall Intensity at Regional Tc, I = 2.63 inch/hr Peak Flowrate, Qp = Rainfall Intensity at User -Defined Tc, I = 1.58 inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 50.97 21.83 50.97 8.69 14.48 8.69 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ 100 YR P2 11/22/2022, 3:56 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR P2 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = P2 15.30 6.63 B II. Rainfall Information Design Storm Return Period, Tr = 01= C2= C3= P1= Acres A, B, C, or D I (inch/hr) = Cl * P1 /(C2 + Td)AC3 10 28.50 10.00 0.786 1.40 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.20 0.09 Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach 2 1-M _ - overland Reach 1 flow LEGEND C) Beginning- Flow Direrdon Calk lute nt B o undary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0220 500 0.09 N/A 0.27 31.43 1 0.0220 1,114 2 0.0150 516 3 4 5 Sum 2,130 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 1.58 2.63 1.58 10.00 1.48 12.52 10.00 1.22 7.02 Computed Tc = Regional Tc = User -Entered Tc = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 50.97 21.83 50.97 4.83 8.04 4.83 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ 10 YR P2 11/22/2022, 3:56 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR P1 Full Pond I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = P1 4.83 41.81 C II. Rainfall Information Design Storm Return Period, Tr = 01= C2= C3= P1= Acres A, B, C, or D I (inch/hr) = C1 * P1 /(C2 + Td)AC3 100 28.50 10.00 0.786 2.66 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.64 0.38 Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach --`------- overland • Reach 1 flow as LEGEND O Beginning Flow Dire( don C atc June nt Boundary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0250 500 0.38 N/A 0.39 21.48 1 0.0180 100 2 0.0050 150 3 4 5 Sum 750 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 4.68 6.20 4.68 17.50 2.35 0.71 15.00 1.06 2.36 Computed Tc = Regional Tc = User -Entered Tc = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 24.55 14.17 24.55 14.48 19.17 14.48 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ 100-yr FULL POND 11/22/2022, 3:56 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR P1 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = P1 4.83 41.81 C Acres A, B, C, or D II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)"C3 Design Storm Return Period, Tr = 01= C2= C3= P1= 100 28.50 10.00 0.786 2.66 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.60 0.38 --- Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach 2 iref Reach 1 titre rland flow LEGEND ( a Beginning Flow Direr lion 4r Ca.tc lune ttt B oundary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0250 500 0.38 N/A 0.39 21.48 1 0.0180 100 2 0.0050 150 3 4 5 Sum 750 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 4.68 6.20 4.68 17.50 2.35 0.71 15.00 1.06 2.36 Computed Tc = Regional Tc = User -Entered Tc = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 24.55 14.17 24.55 13.57 17.97 13.57 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ P1 100-yr 11/22/2022, 3:55 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR P1 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = P1 4.83 41.81 C Acres A, B, C, or D II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)"C3 Design Storm Return Period, Tr = 01= C2= C3= P1= 10 28.50 10.00 0.786 1.40 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.44 0.38 --- Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach 2 iref Reach 1 titre rland flow LEGEND ( a Beginning Flow Direr lion 4r Ca.tc lune ttt B oundary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0250 500 0.38 N/A 0.39 21.48 1 0.0180 100 2 0.0050 150 3 4 5 Sum 750 17.50 2.35 0.71 15.00 1.06 2.36 Computed Tc = Regional Tc = User -Entered Tc = IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 2.46 inch/hr Peak Flowrate, Qp = Rainfall Intensity at Regional Tc, I = 3.26 inch/hr Peak Flowrate, Qp = Rainfall Intensity at User -Defined Tc, I = 2.46 inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 24.55 14.17 24.55 5.24 6.94 5.24 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ P1 10-yr 11/22/2022, 3:54 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR H2 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = H2 7.00 2.00 C II. Rainfall Information Design Storm Return Period, Tr = 01= C2= C3= P1= Acres A, B, C, or D I (inch/hr) = Cl * P1 /(C2 + Td)AC3 100 28.50 10.00 0.786 1.40 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.51 0.16 Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach 2 1.' Reach 1 titre rland flow S Th LEGEND ( a Beginning Flow Direr lion 4r Ca.tc lune ttt B oundary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output 0.0200 500 0.16 1 0.0100 250 2 3 4 5 Sum 750 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 2.08 3.26 2.08 NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output N/A 0.28 30.19 15.00 1.50 2.78 Computed Tc = Regional Tc = User -Entered Tc = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 32.97 14.17 32.97 7.41 11.65 7.41 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ 100 YR H2 11/22/2022, 3:54 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR H2 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = H2 7.00 2.00 C II. Rainfall Information Design Storm Return Period, Tr = 01= C2= C3= P1= Acres A, B, C, or D I (inch/hr) = Cl * P1 /(C2 + Td)AC3 10 28.50 10.00 0.786 1.40 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.26 0.16 Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach 2 1.' Reach 1 titre rland flow S Th LEGEND ( a Beginning Flow Direr lion 4r Ca.tc lune ttt B oundary NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0200 500 0.16 N/A 0.28 30.19 1 0.0100 250 2 3 4 5 Sum 750 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 2.08 3.26 2.08 15.00 1.50 2.78 Computed Tc = Regional Tc = User -Entered Tc = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 32.97 14.17 32.97 3.78 5.94 3.78 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ 10 YR H2 11/22/2022, 3:54 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR H1 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = H1 44.36 2.00 B Acres A, B, C, or D II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)"C3 Design Storm Return Period, Tr = 01= C2= C3= P1= 100 28.50 10.00 0.786 2.66 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.36 0.09 Reach 3 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration Reach 1 Reach 2 1. - overland flaw • LEGEND ( Beginning - Flow D iredio n Cate kreof B ounda.ry NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0220 500 0.09 N/A 0.27 31.43 1 0.0220 1,114 2 0.0150 747 3 4 5 Sum 2,361 10.00 1.48 12.52 10.00 1.22 10.17 Computed Tc = Regional Tc = User -Entered Tc = IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 2.88 inch/hr Peak Flowrate, Qp = Rainfall Intensity at Regional Tc, I = 4.84 inch/hr Peak Flowrate, Qp = Rainfall Intensity at User -Defined Tc, I = 2.88 inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 54.12 23.12 54.12 46.00 77.31 46.00 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ H1 100 YR 11/22/2022, 3:53 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Catchment ID: Voltagrid USR H1 I. Catchment Hydrologic Data Catchment ID = Area = Percent Imperviousness = NRCS Soil Type = H1 44.36 2.00 B II. Rainfall Information Design Storm Return Period, Tr = 01= C2= C3= P1= Acres A, B, C, or D I (inch/hr) = C1 * P1 /(C2 + Td)AC3 10 28.50 10.00 0.786 1.40 years (input return period for design storm) (input the value of C1) (input the value of C2) (input the value of C3) inches (input one -hr precipitation --see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = Overide Runoff Coefficient, C = 5-yr. Runoff Coefficient, C-5 = Overide 5-yr. Runoff Coefficient, C = 0.17 0.09 (enter an overide C value if desired, or leave blank to accept calculated C.) (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration LEGEND a Beginning Ls How Direxdon Caft}imeof B o and r4' NRCS Land Type Conveyance Heavy Meadow 2.5 Tillage/ Field 5 Short Pasture/ Lawns 7 Nearly Bare Ground 10 Grassed Swales/ Waterways 15 Paved Areas & Shallow Paved Swales (Sheet Flow) 20 Calculations: Reach ID Overland Slope S ft/ft input Length L ft input 5-yr Runoff Coeff C-5 output NRCS Convey- ance input Flow Velocity V fps output Flow Time Tf minutes output 0.0220 500 0.09 N/A 0.27 31.43 1 0.0220 1,114 2 0.0150 747 3 4 5 Sum 2,361 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = Rainfall Intensity at Regional Tc, I = Rainfall Intensity at User -Defined Tc, I = 1.52 2.55 1.52 10.00 1.48 12.52 10.00 1.22 10.17 Computed Tc = Regional Tc = User -Entered Tc = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = inch/hr Peak Flowrate, Qp = Calculated values for Tc & Qp are based on overide values entered for C & C-5. 54.12 23.12 54.12 11.43 19.21 11.43 cfs cfs cfs 15587 ud-rational-v1.02a, Tc and PeakQ H1 10 YR 11/22/2022, 3:52 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR P2 Illustration LEGEND: Flow Direction C at ctu. eat Boundary Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output ASPHALT 0/0 0.96 0.67 FIELD 14.54 0.35 5.09 GRAVEL 0.06 0.50 0.03 Sum: 15.30 Sum: 5.79 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.38 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C 100 YR P2 11/22/2022, 3:52 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR P2 Illustration LEGEND: Flow Direction C at ctu. eat Boundary Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output ASPHALT 0/0 0.92 0.64 FIELD 14.54 0.16 2.33 GRAVEL 0.06 0.36 0.02 Sum: 15.30 sum: 2.99 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.20 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C 10 YR P2 11/22/2022, 3:52 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR P1 Full Pond Illustration LEGEND: Flow Direction Cat aim ent Bartnitiar3r Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output POND 038 0.51 0.19 GRAVEL 4.01 0.58 2.33 ROOF 0.32 0.83 0.27 CONCRETE 0.12 0.96 0.12 sum: 4.83 sum: 2.90 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.60 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C P1 FULL POND 11/22/2022, 3:51 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR P1 Illustration LEGEND: F Low Direction Catch eat Bar Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output GRASS 038 0.51 0.19 GRAVEL 4.01 0.58 2.33 ROOF 0.32 0.83 0.27 CONCRETE 0.12 0.96 0.12 sum: 4.83 sum: 2.90 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.60 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C P1 100-yr 11/22/2022, 3:50 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR P1 Illustration LEGEND: Flow Direction C at ctu. eat Boundary Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output GRASS 038 0.26 0.10 GRAVEL 4.01 0.42 1.68 ROOF 0.32 0.77 0.25 CONCRETE 0.12 0.92 0.11 sum: 4.83 sum: 2.14 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.44 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C P1 10-yr 11/22/2022, 3:50 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR H2 Illustration LEGEND: Flow Direction C at ctu. eat Boundary Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output HISTORIC TOO 0.51 3.57 Sum: 7.00 Sum: 3.57 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.51 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C 100-yr H2 11/22/2022, 3:49 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR H2 Illustration LEGEND: Flow Direction C at ctu. eat Boundary Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output HISTORIC 4.83 0.26 1.26 Sum: 4.83 Sum: 1.26 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.26 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C 10-yr H2 11/22/2022, 3:49 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR H1 Illustration LEGEND: Flow Direction C at ctu. eat Boundary Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output HISTORIC 44.83 0.36 16.14 Sum: 44.83 Sum: 16.14 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.36 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C 100 YR H 1 11/22/2022, 3:48 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR H1 Illustration LEGEND: Flow Direction C at ctu. eat Boundary Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output HISTORIC 44.36 0.17 7.54 Sum: 44.36 Sum: 7.54 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.17 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C 10 YR H 1 11/22/2022, 3:47 PM Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Voltagrid USR P1 Illustration LEGEND: F Low Direction Catch eat Bar Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output GRASS 038 0.16 0.06 GRAVEL 4.01 0.35 1.40 ROOF 0.32 0.75 0.24 CONCRETE 0.12 0.90 0.11 sum: 4.83 sum: 1.81 Area -Weighted Runoff Coefficient (sum CA/sum A) = 0.38 *See sheet "Design Info" for inperviousness-based runoff coefficient values. 15587 ud-rational-v1.02a, Weighted C P1 5-yr 11/22/2022, 3:49 PM DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-5 Runoff Coefficients, C Imperviousness Percentage C and D NRCS Hydrologic Soil Groups Type 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.04 0.15 0.25 0.37 0.44 0.50 5% 0.08 0.18 0.28 0.39 0.46 0.52 10% 0.11 0.21 0.30 0.41 0.47 0.53 15% 0.14 0.24 0.32 0.43 0.49 0.54 20% 0.17 0.26 0.34 0.44 0.50 0.55 25% 0.20 0.28 0.36 0.46 0.51 0.56 30% 0.22 0.30 0.38 0.47 0.52 0.57 35% 0.25 0.33 0.40 0.48 0.53 0.57 40% 0.28 0.35 0.42 0.50 0.54 0.58 45% 0.31 0.37 0.44 0.51 0.55 0.59 50% 0.34 0.40 0.46 0.53 0.57 0.60 55% 0.37 0.43 0.48 0.55 0.58 0.62 60% 0.41 0.46 0.51 0.57 0.60 0.63 65% 0.45 0.49 0.54 0.59 0.62 0.65 70% 0.49 0.53 0.57 0.62 0.65 0.68 75% 0.54 0.58 0.62 0.66 0.68 0.71 80% 0.60 0.63 0.66 0.70 0.72 0.74 85% 0.66 0.68 0.71 0.75 0.77 0.79 90% 0.73 0.75 0.77 0.80 0.82 0.83 95% 0.80 0.82 0.84 0.87 0.88 0.89 100% 0.89 0.90 0.92 0.94 0.95 0.96 TYPE B NRCS HYDROLOGIC SOILS GROUP 0% 0.02 0.08 0.15 0.25 0.30 0.35 5% 0.04 0.10 0.19 0.28 0.33 0.38 10% 0.06 0.14 0.22 0.31 0.36 0.40 15% 0.08 0.17 0.25 0.33 0.38 0.42 20% 0.12 0.20 0.27 0.35 0.40 0.44 25% 0.15 0.22 0.30 0.37 0.41 0.46 30% 0.18 0.25 0.32 0.39 0.43 0.47 35% 0.20 0.27 0.34 0.41 0.44 0.48 40% 0.23 0.30 0.36 0.42 0.46 0.50 45% 0.26 0.32 0.38 0.44 0.48 0.51 50% 0.29 0.35 0.40 0.46 0.49 0.52 55% 0.33 0.38 0.43 0.48 0.51 0.54 60% 0.37 0.41 0.46 0.51 0.54 0.56 65% 0.41 0.45 0.49 0.54 0.57 0.59 70% 0.45 0.49 0.53 0.58 0.60 0.62 75% 0.51 0.54 0.58 0.62 0.64 0.66 80% 0.57 0.59 0.63 0.66 0.68 0.70 85% 0.63 0.66 0.69 0.72 0.73 0.75 90% 0.71 0.73 0.75 0.78 0.80 0.81 95% 0.79 0.81 0.83 0.85 0.87 0.88 100% 0.89 0.90 0.92 0.94 0.95 0.96 2007-01 Urban Drainage and Flood Control District RO-11 RUNOFF DRAINAGE CRITERIA MANUAL (V. 1) TABLE RO-5 (Continued) Runoff Coefficients, C Imperviousness Percentage Type A NRCS Hydrologic Soils Group 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.00 0.00 0.05 0.12 0.16 0.20 5% 0.00 0.02 0.10 0.16 0.20 0.24 10% 0.00 0.06 0.14 0.20 0.24 0.28 15% 0.02 0.10 0.17 0.23 0.27 0.30 20% 0.06 0.13 0.20 0.26 0.30 0.33 25% 0.09 0.16 0.23 0.29 0.32 0.35 30% 0.13 0.19 0.25 0.31 0.34 0.37 35% 0.16 0.22 0.28 0.33 0.36 0.39 40% 0.19 0.25 0.30 0.35 0.38 0.41 45% 0.22 0.27 0.33 0.37 0.40 0.43 50% 0.25 0.30 0.35 0.40 0.42 0.45 55% 0.29 0.33 0.38 0.42 0.45 0.47 60% 0.33 0.37 0.41 0.45 0.47 0.50 65% 0.37 0.41 0.45 0.49 0.51 0.53 70% 0.42 0.45 0.49 0.53 0.54 0.56 75% 0.47 0.50 0.54 0.57 0.59 0.61 80% 0.54 0.56 0.60 0.63 0.64 0.66 85% 0.61 0.63 0.66 0.69 0.70 0.72 90% 0.69 0.71 0.73 0.76 0.77 0.79 95% 0.78 0.80 0.82 0.84 0.85 0.86 100% 0.89 0.90 0.92 0.94 0.95 0.96 RO-12 2007-01 Urban Drainage and Flood Control District NOAA Atlas 14, Volume 8, Version 2 Location name: Keenesburg, Colorado, USA* Latitude: 40.1232°, Longitude: -104.5839° Elevation: 4941.64 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches 1 Average recurrence interval (years) Duration 1 2 _ 5 10 I 25 50 100 200 500 1000 5 -min 0.241 (0.192-0.304) 0.292 (0.233-0.369) 0.390 (0.309-0.494) 0.483 (0.381-0.615) 0.631 (0.488-0.853) 0.759 (0.569-1.03) 0.900 (0.649-1.25) 1.06 (0.728-1.51) 1.28 (0.848-1.88) 1.47 (0.938-2.16) 10 -min 0.353 (0.281-0.445) 0.428 (0.341-0.541) 0.571 (0.453-0.723) 0.708 (0.558-0.901) 0.924 (0.715-1.25) 1.11 (0.833-1.51) 1.32 (0.951-1.84) 1.55 (1.07-2.21) 1.88 (1.24-2.75) 2.15 (1.37-3.16) 15 -min 0.430 i (0.343-0.543) 0.522 (0.416-0.659) 0.696 (0.553-0.882) 0.863 (0.681-1.10) 1.13 (0.872-1.52) 1.36 (1.02-1.84) 1.61 (1.16-2.24) 1.88 (1.30-2.69) 2.29 (1.51-3.35) 2.62 (1.68-3.85) 30 -min 0.578 (0.461-0.729) 0.699 (0.556-0.882) 0.929 (0.737-1.18) 1.15 (0.908-1.46) 1.50 (1.16-2.04) 1.81 (1.36-2.47) 2.15 (1.55-3.00) 2.53 (1.75-3.62) 3.08 (2.04-4.51) 3.53 (2.26-5.19) 60 -min I 0.710 ll (0.566-0.896) 0.850 (0.677-1.07) 1.13 (0.893-1.43) 1.40 (1.10-1.78) 1.84 (1.43-2.50) 2.22 (1.67-3.04) 2.66 (1.92-3.71) 3.14 (2.17-4.49)i 3.84 (2.55-5.64) 4.43 (2.83-6.51) 0.842 (0.676-1.05) 1.00 i (0.804-1.25) 1.32 (1.06-1.66) 1.64 (1.31-2.07) 2.17 (1.70-2.92) 2.63 (2.00-3.57) 3.16 (2.30-4.37) 3.74 (2.62-5.31) 4.61 (3.08-6.70) 5.33 (3.44-7.75) 3-h r 0.917 (0.740-1.14) 1.42 (1.14-1.77) 1.76 (1.41-2.21) 2.33 (1.84-3.13) 2.83 (2.16-3.82) 3.40 (2.50-4.69) I 5.00 (3.36-7.22) 5.79 (3.76-8.36) 6 -hr 1.08 (0.879-1.33) 1.26 (1.02-1.55) 1.63 (1.32-2.01) 2.00 (1.61-2.48) 2.61 (2.08-3.48) 3.17 (2.44-4.23) 3.79 (2.81-5.17) 4.49 (3.18-6.27) 5.53 (3.76-7.90) 6.40 (4.19-9.14) 12 -hr 1.28 (1.05-1.57) 1.50 (1.23-1.84) 1.93 (1.57-2.36) 2.33 (1.89-2.87) 2.98 (2.37-3.88) 3.54 (2.74-4.64) 4.16 (3.10-5.58) 4.85 (3.46-6.66) 5.85 (4.00-8.23) 6.67 (4.42-9.42) 24 -hr 1.52 (1.26-1.84) I 1.79 (1.48-2.17) 2.28 (1.88-2.77) 2.73 (2.24-3.33) 3.42 (2.73-4.37) 3.99 (3.10-5.15) 4.61 (3.46-6.08) 5.29 (3.80-7.15) 6.25 I (4.31-8.66) 7.02 (4.70-9.80) 2 -day 1.73 (1.44-2.07) 2.08 (1.73-2.50) 2.68 (2.23-3.22) 3.20 (2.64-3.86) 3.94 (3.15-4.93) 4.53 (3.54-5.74) 5.15 (3.88-6.67) 5.79 (4.18-7.69) 6.67 (4.63-9.09) 7.35 (4.97-10.1) 3 -day 1 1.89 (1.58-2.25) 2.25 (1.88-2.68) 2.86 (2.39-3.42) 3.39 (2.81-4.06) 4.14 (3.32-5.14) 4.74 (3.71-5.96) 5.35 (4.06-6.89) 6.00 (4.36-7.92) 6.88 (4.80-9.32) 7.57 (5.14-10.4) 4 -day 2.02 (1.70-2.39) I 2.38 (2.00-2.82) 2.99 (2.50-3.56) 3.52 (2.93-4.20) 4.27 (3.44-5.28) 4.87 (3.84-6.10) 5.49 (4.18-7.04) 6.15 (4.48-8.07) 7.04 (4.94-9.48) 7.74 (5.28-10.6) 7 -day 2.31 (1.96-2.72) 2.70 (2.28-3.18) 3.34 (2.82-3.95) 3.90 (3.26-4.62) 4.67 (3.79-5.72) 5.29 (4.19-6.55) 5.91 (4.53-7.50) 6.56 (4.82-8.53) 7.44 (5.26-9.92) 8.13 (5.59-11.0) 10 -day 2.56 11 (2.18-3.00) 1 2.98 (2.53-3.49) 1 3.66 ll (3.10-4.31) 4.24 (3.57-5.01) M 5.05 (4.11-6.13) Il_5.67 (4.51-6.98) 6.31 (4.85-7.93) 6.96 (5.13-8.97) 7.82 (5.55-10.4) 8.49 (5.87-11.4) 3.77 (3.23-4.38) 4.56 (3.89-5.31) 5.21 (4.42-6.09) 6.10 (5.00-7.30) 6.77 (5.43-8.22) 7.44 (5.77-9.24) 8.12 (6.04-10.3) 9.00 (6.44-11.7) 9.65 (6.75-12.8) 30-da y 3.86 f (3.32-4.45) I 4.42 (3.80-5.10) 5.31 (4.56-6.14) 6.04 (5.15-7.01) 7.01 (5.77-8.33) 7.74 (6.24-9.33) 8.46 (6.59-10.4) 9.17 (6.86-11.6) 10.1 (7.26-13.1) 10.8 (7.57-14.2) 45 -day 4.56 (3.95-5.22) 5.22 (4.52-5.99) 6.27 (5.41-7.21) 7.11 (6.10-8.21) 8.23 (6.80-9.69) 9.05 (7.32-10.8) 9.84 (7.70-12.0) 10.6 (7.98-13.3) 11.6 (8.38-14.9) 12.3 (8.69-16.1) 60-day1 5.12 (4.46-5.85) 5.89 (5.12-6.74) 7.10 (6.15-8.14) 8.06 (6.94-9.27) 9.31 (7.71-10.9) 10.2 (8.29-12.1) 11.1 (8.70-13.5) 11.9 (8.98-14.8) 12.9 (9.40-16.5) 13.7 (9.71-17.8) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based depth -duration -frequency (DDF) curves Latitude: 40.1232 Longitude- -104.583943 eL -a 4.2 4-0 C O �s eL Wr Precipitation depth (in) 14 12 10 14 12 10 B 6 4 2 0 C E L C r 6 C rn O 41 L th IN Duration i.r nc N �a V at y rh 4 54 >O14 r r4 r -01 0 C Lit O ml RIR LAD s i I I 1 f I I I 1 2 N.0AA Atfas 14 Volume 8 Version 2 5 10 25 50 100 200 Average recurrence interval (years) 500 1000 Created' porn' Wed Nov 219:15:49 2022 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) r 1 2 5 10 25 50 100 200 500 1000 5 -min 1in 1 mr; 30-rninI o$1 2 -hr 3 -hr 5 -hr — 12 -hr - 24 -hr aa 2 -clay 3 -clay ay 4 -day 7 -day 10 -day 2O -day �i 3O -day 45 -day 60 -day Large scale terrain h fee 3km 2mi J rcakrz Tit 1 gibs:4 tie Large scale map sen U.1 H' Greeley Longmolt CI Boulder �� !fop I*� ��i ei INNERS 100km ,! 60mi oho rade' pr' n qs Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer Appendix C Hydraulic Calculations Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Circular Culvert Invert Elev Dn (ft) P ipe Length (ft) S lope (%) Invert Elev Up (ft) Rise (in) S hape S pan (in) No. Barrels n -Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Elie,' Lift; 20 Circular Culvert 30 4946.40 117.00 1.50 4948.16 15.0 Circular 15.0 1 0.013 Circular Concrete Square edge w/headwall (C) 0.0098, 2, 0.0398, 0.67, 0.5 4950.17 90.00 40.00 <Name> Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime 100 110 120 130 140 Tuesday, Nov 22 2022 11.11 7.00 4.11 5.91 6.31 4947.56 4949.22 4950.28 1.70 Inlet Control H,u Cepth iftj -1.16 Reach ' t Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. South Culvert 100-Yr Invert Elev Dn (ft) P ipe Length (ft) S lope (%) Invert Elev Up (ft) Rise (in) S hape S pan (in) No. Barrels n -Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Elie.. I`.: i 495D.O,^ 4949.00 4946.0; 4946.00 4945.00 4946.40 117.00 1.50 4948.16 15.0 Circular 15.0 1 0.013 Circular Concrete Square edge w/headwall (C) 0.0098, 2, 0.0398, 0.67, 0.5 4950.17 90.00 40.00 South Culvert 100-Yr Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Tuesday, Nov 22 2022 8.69 8.69 (dc+D)I2 8.69 6.88 1.81 5.82 6.24 4947.55 4949.21 4950.24 1.66 Inlet Control U. ep,tr .Thletcontrol ------------ 10 Circular Culvert i+r Hc;1 EIIIb®nk 110 12 150 Reach Iitl I_ a 1 i34 -1 16 -2.15 Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. South Culvert 10-Yr Invert Elev Dn (ft) P ipe Length (ft) S lope (%) Invert Elev Up (ft) Rise (in) S hape S pan (in) No. Barrels n -Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) EIS,. i 49.50.00 4949.00 4946.0; 4946.00 4945.00 4946.40 117.00 1.50 4948.16 15.0 Circular 15.0 1 0.013 Circular Concrete Square edge w/headwall (C) 0.0098, 2, 0.0398, 0.67, 0.5 4950.17 90.00 40.00 South Culvert 10-Yr Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Tuesday, Nov 22 2022 4.83 4.83 (dc+D)I2 4.83 4.83 0.00 4.32 5.17 4947.47 4949.05 4949.61 1.16 Inlet Control h-1-;, Leptl- Inlet -control x ------------ 10 Circular Culvert i+r I(_ Embank 110 12 140, 15D Reach Iitl 1 54 -'1 16 -2 1S -3.18 Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. North Culvert 100-Yr Invert Elev Dn (ft) P ipe Length (ft) S lope (%) Invert Elev Up (ft) Rise (in) S hape S pan (in) No. Barrels n -Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Er,. it: n0 y Circular Culvert 4941.08 117.00 1.00 4942.25 15.0 Circular 15.0 1 0.013 Circular Concrete Square edge w/headwall (C) 0.0098, 2, 0.0398, 0.67, 0.5 4944.72 90.00 40.00 HGL North Culvert 100-Yr 70 80 Embank Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime 100 110 120 120 140 1eD Tuesday, Nov 22 2022 8.69 8.69 (dc+D)I2 8.69 7.98 0.71 6.64 6.50 4942.26 4943.96 4944.76 2.01 Inlet Control Lepth eft 1,50 Reach (ft 1.7E 3.75 -1.25 -2.25 Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. North Culvert 10-Yr Invert Elev Dn (ft) P ipe Length (ft) S lope (%) Invert Elev Up (ft) Rise (in) S hape S pan (in) No. Barrels n -Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) El'„ Lift; 4942.00 41.00 4 94 4941.08 117.00 1.00 4942.25 15.0 Circular 15.0 1 0.013 Circular Concrete Square edge w/headwall (C) 0.0098, 2, 0.0398, 0.67, 0.5 4944.72 90.00 40.00 North Culvert 10-Yr Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Tuesday, Nov 22 2022 4.83 4.83 (dc+D)I2 4.83 4.83 0.00 4.32 5.17 4942.15 4943.14 4943.70 1.16 Inlet Control L epth It; I n l et control n, Circular Culvert v Vt 40 50 HGL 70 84 Embank 90 100 110 120 130, 14 V 1 �u 10. Reach (ft 1.75 0.75 es V.25 -1.25 -2.25 Where: and: Where: LP L_p 1 (At wl Outlet Culvert=3.8(3.17-1)=8.25 k2tane) \ Yt / N. Roadside Culvert=3.5'"(4.02-1)=10.5 S. Roadside Culvert=3.5"'(4.02-1)=10.5 Eq. 5.9.1 Lp = Length of protection (ft) (A_t)/(y_t) W = Width of the conduit (ft, use diameter for circular conduits) Outlet Culvert=1.27/0.4=3.17 Yt = Tailwater depth (ft) N./S. Roadside Culvert =1.61/0.4 4.02 8 = The expansion angle of the culvert flow At Q V At Outlet Culvert 3.78/3 1.27 N . Roadside Culvert 4.83/3-1.61 S . Roadside Culvert =4.83/3=1.61 At = required area of flow at allowable velocity (ft2) V = the allowable non -eroding velocity in the downstream channel (ft/sec) Q = design discharge (cfs) For Eq. 5.9.1: Eq. 5.9.2 • If the tailwater elevation is unknown or unable to be calculated, a value of 0.4 x the culvert height or pipe diameter may be used for Vt. 1 • The expansion factor can be found from Figure 5-5 and Figure 5-6 shown below, after 2tan8 calculating Q/D2.5. • In the calculations for At, the allowable non -eroding velocity in the downstream channel should be: o 3.0 ft/sec for erosive soils o 5.0 ft/sec for non -erosive soils In certain circumstances, Eq. 5.9.1 may yield unreasonable results. Therefore, in no case should Lp be less than 3H or 3D, nor does Lp need to be greater than 10H or 10D whenever the Froude parameter, Q/WH1.5 or Q/D23, is less than 8.0 or 6.0, respectively. Whenever the Froude parameter is greater than those maximums, increase the maximum Lp required by %Dc or %H for circular or rectangular (box) culverts, respectively, for each whole number by which the Froude parameter is greater than 8.0 or 6.0, respectively. Once Lp has been determined, the width of the riprap protection at the furthest downstream point should be verified. This dimension is labeled "T" on Figure 5-4. The first step is to solve for 8 using the results from Figure 5-5 or Figure 5-6: 0 tan (2(ExpansonFactor)) Where: • Expansion Factor = determined using Figure 5-5 or Figure 5-6 Eq. 5.9.3 WELD COUNTY ENGINEERING & CONSTRUCTION CRITERIA I 56 Figure 5-5 Expansion Factor for Circular Conduits (USDCM, Vol 2 Figure 9-35) 9 = Expansion Angle 0 C p EXPANSION FACTOR 8 7 6 5 4 2 I litridnen 1111111 rear AiS 111 aria Co I .2 3 4 _ _+ T ILWATER DEPTH/ CONDUIT HEIGHT, Yt/D D Q/D^2.5 Outlet Culvert=3.78/(1)^2.5=3.78 N orth Culvert=4.83/(1.25)^2.5=2.76 S outh Culvert =4.83/(1.25)^2.5 =2.76 EF=Outlet culvert=3.8 EF=N. and S. Culverts=3.5 y_t Outlet Culvert=0.4*1=0.4 N . Roadside Culvert =0.4*1.25=0.5 S . Roadside Culvert =0.4*1.25=0.5 (y_t)/D Outlet Culvert=0.4/1=0.4 N . Roadside Culvert =0.5/1.25=0.4 S . Roadside Culvert 0.5/1.25 0.4 WELD COUNasdfTY ENGINEERING & CONSTRUCTION CRITERIA P A G F 58 Figure 5-7 Riprap Erosion Protection at Circular Conduit (Valid for Q/D2.5≤6.0) (USDCM, Vol 2 Figure 9-38) aim ci 0 60 40 20 C a4dStr r ttP r- S,,r - {.�� '1. '`,1 l •. At Or iosCs 0 ‘r 1 - 44(4kOr I 1 11 1 L -'� - -I N./ Culverts S C YtiD Outlet culvert .8 Use Do instead of D whenever flow is supercritical in the barrel. **Use Type L for a distance of 3D downstream. Q/D^1.5 Outlet Culvert=3.78/(1)^1.5=3.78 N orth Culvert=4.83/(1.25^1.5)=6.75 S outh Culvert=4.83/(1.25^1.5)=6.75 10 y_t / D Outlet Culvert=0.4/1=0.4 N . Roadside Culvert =0.5/1.25=0.4 S . Roadside Culvert =0.5/1.25=0.4 WELD COUNTY ENGINEERING & CONSTRUCTION CRITERIA I 60 MBAS N Project Project Calculated Checked Number: Name: Date: By: By: Voltagrid 15587 GCT LDS 11/21/2022 Weld County USR Engineer ng P1� ur yin� - _ _ For use when channel slopes are between 10% and 40%. This by K.M. method Robinson, is Input one of C.E. Parameters: the approved Rice, and K.C. methods Kadavy (1998) by UDFCD and is described in the Design of Rock Chutes SI Units Metric The Per Per calculated UDFCD UDFCD D50 Flow with Minimum Channel Minimum the the per Channel S.F. D50 D50 size increased unit UDFCD applied Bottom with Mantle for calculated Length crest Side Bed the 30% Riprap Mannings Slopes size & Design Thickness width Width riprap Flow Slope Increase rounded of Apron should should Type (Q) (q) (S) (B) (7) is = = = = = as 18.2 cfs cfs/ft 1 _,a�a 0.515 m3/s m3/s/m m/m m m/m 0.91 0.085 0.25 ft/ft 0.25 20 ft . 6.10 0.25 ft/ft 0.25 [_G follows: u t by 30%: Factor uw07E 6 1.5 D50 D50 n = = = = = = = = 3.4 in 87.6 mm be increased of Safety applied: in 4.48 also have a 7 in Type L 9 in 0.053 18 in 11.25 ft Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Emergency Spillway Trapezoidal Weir Crest Bottom Length (ft) Total Depth (ft) Side Slope (z:1) Calculations Weir Coeff. Cw Compute by: Known Q (cfs) Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 0 10 20 25 30 35 40 45 5 Weir Sharp 20.00 1.50 4.00 = 3.10 Known Q 18.20 15 W.S. Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) Emergency Spillway Monday, Nov 21 2022 0.43 18.20 9.34 1.95 23.44 Depth (ft) 2.00 1.50 1.00 0.50 0.00 -0.50 Length (ft) Detention pond Project: Basin Description: Contour Elevation 4,941.52 4,942.00 4,943.00 4,943.67 Contour Area (sq. ft) 0 2,537 12,714 27,510 Voltagrid USR Basin P1 Depth (ft) N/A 0448 1.00 0.67 Incremental Volume Avg. End (cu. ft) N/A 609 7626 13475 Cumulative Volume Avg. End (cu. ft) 0 609 8235 21710 Incremental Volume Conic (cu. ft) N/A 411 6977 13160 Cumulative Volume Conic (cu. ft) 0 411 7388 20548 0.47 ac -ft DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Project: USR22-XXXX VOLTAGRID CNG FACILITY Basin ID: P1 1 r0n_YR VOLUME LURV /ZONE 3 r -ZONE 2 ,--ZONE 1 1 wOcV [1 t�ER+MANENT- POOL ZONE I AND 2. ORIFICES '-i00-YEAR ORIFICE Example Zone Configuration (Retention Pond) Zone 1 (WQCV) one 2 (100 -year) Zone 3 Estimated Stage (ft) Estimated Volume (ac -ft) Outlet Type 0.68 0.074 Orifice Plate 1.79 0.338 Weir&Pipe (Restrict) Total (all zones) User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Diameter = N/A inches 0.413 Underdrain Orifice Area = Underdrain Orifice Centroid = Calculated Parameters for Underdrain N/A N/A ft2 feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP' Centroid of Lowest Orifice = Depth at top of Zone using Orifice Plate = Orifice Plate: Orifice Vertical Spacing = Orifice Plate: Orifice Area per Row = 0.00 0.68 2.70 0.66 ft (relative to basin bottom at Stage = 0 ft) ft (relative to basin bottom at Stage = 0 ft) inches sq. inches (diameter = 7/8 inch) User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) WQ Orifice Area per Row = Elliptical Half -Width = Elliptical Slot Centroid = Elliptical Slot Area = 4.583E-03 N/A N/A N/A Calculated Parameters for Plate ft2 feet feet ft2 Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) 0.00 0.23 0.45 0.66 0.66 0.66 Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) User Input: Vertical Orifice (Circular or Rectangular) Invert of Vertical Orifice = Depth at top of Zone using Vertical Orifice = Vertical Orifice Diameter = Not Selected Not Selected ft (relative to basin bottom at Stage = 0 ft) ft (relative to basin bottom at Stage = 0 ft) inches Vertical Orifice Area = Vertical Orifice Centroid = Calculated Parameters for Vertical Orifice Not Selected Not Selected ft2 feet User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe' Overflow Weir Front Edge Height, Ho = Overflow Weir Front Edge Length = Overflow Weir Grate Slope = Horiz. Length of Weir Sides = Overflow Grate Type = Debris Clogging % = Zone 2 Weir Not Selected 1.50 3.00 0.00 3.00 Type C Grate 0% ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, Ht = feet H:V feet % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Depth to Invert of Outlet Pipe = Outlet Pipe Diameter = Restrictor Plate Height Above Pipe Invert = Zone 2 Restrictor 0.00 12.00 Not Selected 9.00 User Input: Emergency Spillway ;Rectangular or Trapezoidal) Spillway Invert Stage= Spillway Crest Length = Spillway End Slopes = Freeboard above Max Water Surface = 4943.67 20.00 4.00 1.00 Overflow Weir Slope Length = Grate Open Area / 100-yr Orifice Area = Overflow Grate Open Area w/o Debris = Overflow Grate Open Area w/ Debris = ft (distance below basin bottom at Stage = 0 ft) inches inches ft (relative to basin bottom at Stage = 0 ft) feet H:V feet Calculated Parameters for Overflow Weir Zone 2 Weir Not Selected 1.50 3.00 9.91 6.26 6.26 feet feet ft2 ft2 Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Outlet Orifice Area = Outlet Orifice Centroid = Half -Central Angle of Restrictor Plate on Pipe = Spillway Design Flow Depth= Stage at Top of Freeboard = Basin Area at Top of Freeboard = Basin Volume at Top of Freeboard = Zone 2 Restrictor Not Selected 0.63 0.41 2.09 N/A Calculated Parameters for Spillway 0.33 4945.00 0.69 0.63 feet feet acres acre -ft ft2 feet radians Routed Hydrograph Resu is Design Storm Return Period = One -Hour Rainfall Depth (in) = CUHP Runoff Volume (acre -ft) = Inflow Hydrograph Volume (acre -ft) = CUHP Predevelopment Peak Q (cfs) = OPTIONAL Override Predevelopment Peak Q (cfs) = Predevelopment Unit Peak Flow, q (cfs/acre) = Peak Inflow Q (cfs) = Peak Outflow Q (cfs) = Ratio Peak Outflow to Predevelopment Q = Structure Controlling Flow = Max Velocity through Grate 1 (fps) = Max Velocity through Grate 2 (fps) = Time to Drain 97% of Inflow Volume (hours) = Time to Drain 99% of Inflow Volume (hours) = Maximum Ponding Depth (ft) = Area at Maximum Ponding Depth (acres) = Maximum Volume Stored (acre -ft) = The user can override the default CUHP hydrogtaphs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year N/A N/A 0.85 1.13 1.40 1.84 2.22 2.66 3.84 0.074 0.196 0.123 0.191 0.279 0.471 0.621 0.817 1.304 N/A N/A 0.123 0.191 0.279 0.471 0.621 0.817 1.304 N/A N/A 0.1 0.5 1.3 3.7 5.2 7.3 12.2 N/A N/A 3.8 N/A N/A 0.01 0.09 0.78 0.76 1.08 1.50 2.52 N/A N/A 1.7 2.8 4.2 7.2 9.5 12.4 19.6 0.0 0.1 0.1 0.1 0.1 2.3 3.5 3.8 4.0 N/A N/A N/A 0.1 0.0 0.6 0.7 0.5 0.3 Plate Plate Plate Plate Plate Overflow Weir 1 Outlet Plate 1 Outlet Plate 1 N/A N/A N/A N/A N/A N/A 0.4 0.5 0.6 0.6 N/A N/A N/A N/A N/A N/A N/A N/A N/A 38 60 48 60 72 72 69 66 60 40 65 52 65 79 82 80 78 74 0.68 1.19 0.87 1.13 1.42 1.65 1.75 1.99 2.16 0.20 0.28 0.23 0.27 0.32 0.41 0.47 0.59 0.69 0.075 0.197 0.113 0.180 0.263 0.345 0.394 0.516 0.632 MHFD-Detention v4-06, Outlet Structure 11/4/2022, 1:03 PM DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) , U U O IL 25 20 15 10 5 0 is 500YRIN I I 1 EN - = 500YR OUT - 100YR IN - m. 100YR OUT 50YR IN - 0 50YR OUT 25YR IN _ 25YR OUT 10YR IN - - 10YR OUT a '5YRIN - - - - 0. N. 5YR OUT 2YR IN 2YR OUT EURV IN - EURV OUT - - - WQCV IN wctcv our , al. y_ s -Mal IS !IS S -s s� s --4+a - -_ . �""�+"�`-_�= ter- �� I ♦ s ,R 0.1 1 TIME [hr] 10 2.5 2 0.5 0 Mar- EURV imaWQCV ir -__ .„„__ .,,,i,,...,,,,.,,,, tallr-- illilliiiiiiill%Illiiiis„..11111O. I )1 or _IIIIIIIIIIIiiiiiiirgii 0.1 1 DRAIN TIME [hr] 10 100 40,000 35,000 30,000 25,000 M W g 20,000 J 0 15,000 w cc 10,000 5,000 0 O User Area Interpolated [ft^2] Area [ft^2] I Summary Volume Area [ft^3] [ft^2] - •s- Summary Outflow Volume [cfs] [ft^3] s •- Summary Outflow [cfs] 0.00 5.00 10.00 15.00 PONDING DEPTH [ft] 20.00 25.00 10 9 8 7 6 5 4 3 2 0 30.00 OUTFLOW [cfs] S -A -V -D Chart Axis Override minimum bound maximum bound X-axis Left V -Axis Right V -Axis MHFD-Detention v4-06, Outlet Structure 11/4/2022, 1:03 PM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: USR22-XXXX VOLTAGRID CNG FACILITY Basin ID: P1 (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness la = 41.81 percent Catchment Drainage Imperviousness la = 41.81 percent Catchment Drainage Area A = 4.830 acres Catchment Drainage Area A = 4.830 acres Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D Return Period for Detention Control T = 10 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 13 minutes Time of Concentration of Watershed Tc = 13 minutes Allowable Unit Release Rate q = 0.78 cfs/acre Allowable Unit Release Rate q = 0.78 cfs/acre One -hour Precipitation P1 = 1.40 inches One -hour Precipitation P1 = 2.66 inches Design Rainfall IDF Formula i = Ci* Pil(C2+Tc)^C3 Design Rainfall IDF Formula i = Ci* Pil(C2+Tc)^C3 Coefficient One C1 = 28.50 Coefficient One Ci = 28.50 Coefficient Two C2 = 10 Coefficient Two C2 = 10 Coefficient Three C3 = 0.789 Coefficient Three C3 = 0.789 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.59 Runoff Coefficient C = 0.42 Inflow Peak Runoff Qp-in = 6.82 cfs Inflow Peak Runoff Qp-in = 18.20 cfs Allowable Peak Outflow Rate Qp-out = 3.78 cfs Allowable Peak Outflow Rate Qp-out = 3.78 cfs Mod. FAA Major Storage Volume = 19,225 cubic feet Mod. FAA Minor Storage Volume = 3,054 cubic feet Mod. FAA Minor Storage Volume = 0.070 acre -ft Mod. FAA Major Storage Volume = 0.441 acre -ft 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5 -Minutes) Rainfall Duration minutes (input) Rainfall Intensity inches / hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) Rainfall Duration minutes (input) Rainfall Intensity inches / hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) 0 0.00 0.000 0.00 0:00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 5 4.71. 0.066 1.00 3.78 0.026 0.040 5 8.95 0.176 1.00 3.78 0.026 0.150 10 3.75 0.105 1:00 3.78 0.052 0.053 10 7.13 0.280 1.00 3.78 0.052 0.228 15 3.15 0.132 0.93 3.53 0.073 0.059 15 5.98 0.352 0.93 3.53 0.073 0.279 20 2.73 0.152 0.83 3.12 0.086 0.066 20 5.18 0.407 0:83 3.12 0.086 0.321 25 2.41. 0.169 0.76 2.87 0.099 0.070 25 4.59 0.450 0.76 2.87 0.099 0351 30 2:17 0.182 0.72 2.71 0.112 0.070 30 4.13 0.486 0.72 2.71 0.112 0.374 35 1.98 0.194 0.69 2.59. 0.125 0:069. 35 3.76 0.517 0.69 2.59 0.125 0.392 40 1.82 0.204 0.66 2.51 0.138 0.066 40 3.46 0.543 0.66 2.51 0.138 0.405 45 1.69 0.212 0.64 2.44 0151 0.061 45 3.21 0.567 0.64 2.44 0.151 0.416 50 1.58 0.220 0.63 2.38 0.164 0.056 50 3.00 0.588 0.63 2.38 0.164 0.424 55 1.48 0.228 0.62 2.34 0.177 0.051 55 2.81 0.608 0.62 2.34 0.177 0.430 60 1.40 0.234 0.61 2.30 0.190 0.044 60 2.65 0.625 0.61 2.30 0.190 0.435 65 1.32 0.240 0.60 2.27 0.203 0.037 65 2.51 0.641 0.60 2.27 0.203 0.438 70 2.39 0.656 0.59 2.24 0.216 0.440 70 1.26 0.246 0.59 2.24 0.216 0.030 75 1.20 0.251 0.59 2.22 0.229 0.022 75 2.28 0.670 0.59 2.22 0.229 0:441 80 1.15 0.256 0.58 2.20 0.242 0.014 80 2.18 0.684 0.58 2.20 0.242 0.441 85 1.10 0.261 0.58 2.18 0.255 0.006 85 2.09 0.696 0.58 .2.18 0.255 0.441 90 2.00 0.708 0.57 2.16 0.268 0.439 90 1.05 0.265 0.57 2.16 0.268 -0.003 95 1.93 0.719 0.57 2.15 0.281 0437 95 1.01 0.269 0.57 2.15 0.281 -0.012 100 0.98 0.273 0.57 2.14 0.294 -0.021 100 1.86 0.729 0.57 2.14 0.294 0.435 105 0.94 0.277 0.56 2.13 0.307 -0.030 105 1.79 0.739 0.56 2.13 0.307 0.432 110 1.73 0.749 0.56 2.11 0.320 0.429 110 0.91 0.281 0:56 2.11 0.320 -0.040 115 0.88 0.284 0.56 2.10 0.333 -0.049 115 1.68 0.758 0.56 2.10 0.333 0.425 120 1.63 0.767 0.55 2.10 0.346 0.421 120 0.86 0.287 0.55 2.10 0.346 -0.059 125 0.83 0.291 0.55 2.09 0.359 -0.069 125 1.58 0.776 0.55 2.09 0.359 0.416 130 0.81 0.294 0.55 2.08 0.372 -0.079 130 1.54 0.784 0.55 2.08 0.372 0.411 135 1.49 0.792 0.55 2.07 0.385 0.406 135 0.79 0.297 0.55 2.07 0.385 -0.089 140 0.77 0.300 0.55 2.07 0.399 -0.099 140 1.45 0.799 0.55 2.07 0.399 0.401 145 1.42 0.807 0.54 2.06 0.412 0.395 145 0.75 0.302 0.54 2.06 0.412 -0.109 150 0.73 0.305 0.54 2.05 0.425 -0.120 150 1.38 0.814 0.54 2.05 0.425 0.389 155 1.35 0.821 0.54 2.05 0.438 0.383 155 0.71 0.308 0.54 2.05 0.438 -0.130 160 0.69 0.310 0.54 2.04 0.451 -0.140 160 1.32 0.828 0.54 2.04 0.451 0.377 165 1.29 0.834 0.54 2.04 0.464 0.371 165 0.68 0.313 0.54 2.04 0.464 -0.151 170 0.66 0.315 0.54 2.04 0.477 -0.162 170 1.26 0.841 0.54 2.04 0.477 0.364 175 0.65 0.317 0.54 2.03 0.490 -0.172 175 1.23 0.847 0.54 2.03 0.490 0.357 180 0.64 0.320 0.54 2.03 0.503 -0.183 180 1.21 0.853 0.54 2.03 0.503 0.350 185 0.62 0.322 0.54 2.02 0.516 -0.194 185 1.18 0.859 0.54 2.02 0.516 0.343 190 0.61 0.324 0.53 2.02 0.529 -0.205 190 1.16 0.865 0.53 2.02 0.529 0.336 195 0.60 0.326 0.53 2.02 0.542 -0.216 195 1.14 0.870 0.53 2.02 0.542 0.329 200 0.59 0.328 0.53 2.01 0.555 -0.227 200 1.12 0.876 0.53 2.01 0.555 0.321 205 0.58 0.330 0.53 2.01 0.568 -0.238 205 1.10 0.881 0.53 2.01 0.568 0.313 210 0.57 0.332 0.53 2.01 0.581 -0.249 210 1.08 0.886 0.53 2.01 0:581 0.306 215 0.56 0.334 0.53 2.01 0.594 -0.260 215 1.06 0.892 0.53 2.01 0.594 0.298 220 0.55 0.336 0.53 2.00 0.607 -0.271 220 1.04 0.897 0.53 2.00 0.607 0.290 225 0.54 0.338 0.53 2.00 0.620 -0.282 225 1.02 0.902 0.53 2.00 0.620 0.282 230 0.53 0.340 0.53 2.00 0.633 -0.293 230 1.00 0.906 0.53 2.00 0.633 0.274 235 0.52 0.341 0.53 2.00 0.646 -0.305 235 0.99 0.911 0.53 2.00 0.646 0.265 240 0:51 0.343 0.53 1.99 0.659 -0.31.6 240 0.97 0.916 0.53 1.99 0.659 0.257 245 0.50 0.345 0.53 1.99 0.672 -0.327 245 0.96 0.920 0.53 1.99 0.672 0.248 250 0.50 0.347 0.53 1.99 0.685 -0.338 250 0.94 0.925 0.53 1.99 0.685 0.240 255 0.49 0.348 0.53 1.99 0.698 -0.350 255 0.93 0.929 0.53 1.99 0.698 0.231 260 0.91 0.934 0.53 1.99 0.711 0.223 260 0.48 0.350 0.53 1.99 0.711 -0.361 265 0.47 0.351 0.52 1.98 0.724 -0.373 265 0.90 0.938 0.52 1.98 0.724 0.214 270 0.47 0.353 0.52 1.98 0.737 -0.384 270 0.89 0.942 0.52 1.98 0.737 0.205 275 0.46 0.355 0:52 1.98 0.750 -0.396 275 .0.88 0.946 0.52 1.98 0.750 0.196 280 0.86 0.950 0.52 1.98 0.763 0.187 280 0.46 0.356 0.52 1.98 0.763 -0.407 285 0.45 0.358 0.52 1.98 0.776 -0.419 285 0.85 0.954 0.52 1.98 0.776 0.178 290 0.84 0.958 0.52 1.98 0.789 0.169 290 0.44 0.359 0.52 1.98 0.789 -0.430 295 0.83 0.962 0.52 1.97 0.802 0.160 295 0.44 0.361 0.52 1.97 0.802 -0.442 300 0.82 0.966 0.52 I 1.97 0.815 I 0.151 300 0.43 0.362 0.52 I 1.97 I 0.815 -0.453 Mod. FAA Minor Storage Volume (cubic ft.) = 3,054 Mod. FAA Minor Storage Volume (acre -ft.) = 0.0701 Mod. FAA Major Storage Volume (cubic ft.) = 19,225 Mod. FAA Major Storage Volume (acre -ft.) = 0.4413 UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 15587 ud-detention v2.35.xls 11/4/2022, 11:02 AM DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: USR22-XXXX VOLTAGRID C NG FACILITY Basin ID: P1 Inflow and Outflow Volumes vs. Rainfall Duration 1.2 1 0.8 0.6 0.4 0.2 0 • • •• • • • • •*••••••• t>( . (≥Ot0II.) J 11 0 t_ r` C. 50 100 150 200 250 • • •• •• •a •• •• •• •• •••. • 0 300 350 Minor Storm Inflow Volume —A- Minor Storm Outflow Volume a Minor Storm Storage Volume -e- Major Storm Inflow Volume f Major Storm Outflow Volume • Major Storm Storage Volume UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 15587 ud-detention v2.35.xls 11/4/2022, 11:02 AM Drainage Plans Drainage Plans MAWR 101.0100 1.1C 1.060033 ASHLEY MIDI XISMICONS i I IX RCR10Im POND JO' 'VEIN( (A VIA, TRACI,YELL IDDI C OP/�1/'ICIB RHVCCAD E 'MUST (F2xnul.ncl 1+°r -�— 5R sorr m5 RR P1n OO0(1 Alm mQiW1CY L RgVAP ... SPUMY tau D50 Km'°• ------------------------ rte» EIS f60EQ8alltatEM _5180_ — — 5°m NA1 moo* IC N0R5A1) m - 81 01 1 Cm1O.0 (1' m0WA1) PRmWir 84a0ARr ROR-00-WAY EASIIIEW 5801104 LAT EDGE Y OU°4 01,00.001f NGE DI. AMIDE /////////// /////////// EDGE 08 BMOC OE1TA POnD 91995 SX900 AMm1 mia A5 060.0 A COMM POW b AW NAM MIL -0 O MT MI O 0 POOR POLE F1 WORMER frE IBM m88 RAWER RAAHm D 1¢Ul RA= an 00101 m 010012 WADI MO YC®I An010000,000 A. 88 e 0� BA9N AREA) COMM! D. KM 000Ci01 =RCM ROAD BAY WRAP 00110 SCV1 I. o�m 1 (04 01REI)5)R 1 \ DRAINAGE PUN DRI Dap and le a amen* .V.AN • ox ar wro. w.w . m I co, 5 DR1 B:\pa-1550] - Vdiagi;a noia County USR\da.d.ga\Urd.age nap.\l5581_0.daage uopae.9 11/30/2022 1:38:14 Rn, Lul.e Seter e g gig N 1 DES»2PDR1 RE➢MS BY DATE LDS^ II rf ' II /u I, It a 1,I :�.� zne 2.u''tD "ei. '�vi, •c� tit• -.A- i ,r / a d e. iNttIi VOLTAGRID LLC USR22—XXXX 11EtD COUNTY ROAD 51 I3STOKC DRAMACP PENN WELD COUNTY caul n LAO LDSn VBASELINE ...,......»� EoYi22. D9. iDmIiDo mn ®'Eataarzm • mmmmm • v am v • enema • C CCVC. WALL IS BARS- e' OP) a lr o.D ud Wnr BASELINE _.,e.,.,... Fnpim.mp •.PI®in6 • Sum�iiry waif.cT anus,• m®4osava Om PARR awn Row GDNRW 1•:'':•-.' ' • .:•'. i+°o-AIYDLIW Port .iiiGiiiiiiiiGGi :. uoououu.. 1•L.OOWOO.w.f uwuuooun; ' RATE 10 Tr RCP Ir 37 ■r �:w.wwwwwwwwwww•_ OUTTLEiPE TOP W BENZ CITY.- IwSIJ I 1 A I ii� MALI RARACKIWw.. .O\O.�■"R :: I 1 •. lff SPLLYY ESLY- 414167 r. _•1. R le ' F le, B @ SKEET WAIF WDI s' YAL CLEAR BOREN BARS x0'--i k a B P tl! I 9UILET OTIOIC1IIRE RAN VEW /1 REBATE O IB• O.C. b IaGK CONCRETE CREST xA1 °HMALLY PLACiO R u WD V[xT TOP W BENZ aFV.- 404117IN HOD 100.rG1R WALK HI, EMERGENCY [REST OF MERGENCr SPOOL.' SRL., 41141.3 SPILLWAY ESC/ - 4.107IF-PFK .1 OPT OK TOP W N...g 1MS ]-1. NP THOME • IS' ww . Y�4���Vi • • OVEN. DR LOCK GSN 1 I Im A KW!.BOLT �•.�y YEN LCIL. NP RAP LW iNEL TVCVAESS • 11• 1 C0 IBA AVER SIFmYtO �•' ' V14 rei‘' STAKE D 314. . R °PANEL 1 G�[FO RAPX TOP Of 00.16 WOLA v STONES T...6 TRAS1 RRL[ AII.ACKO 8Y PM.. FRONT OUTLET a-494.101. R:AY Of SRA, Flf AT OR IHCK COIIWETE WTYRE'F OVERFLOW WNI BUOY EV. W i--ID'—J '� RP PAP AND iEROSIONEROSIONCG:R0.BLANKET Wml. LAYER AND 4m AND LLIL°I AS S Yi'SIFD W CAL. CREST WALL BOOING .7,4E0LTRED BY PLANS AND ffFOnG.5S !W W RE RAH$ 1.W '! = REOD KO 4912.WFRScW F TRCY ISO I WAY R F EASIER GRADE REAR LW _ I D n OVERFLOW SPILLWAY DESIGN RIPPAP WADE TO. Li. Y 51Dm' NO. RD JOHNSON VIE WRIT. S1tAVitt SCRIM NOR AMMO [1101) ��1 I OUAIW CONTROL OL .TE I NARK OW. DRJ DR3 NOT m .11Nx,FSS ION-YR PION RESTRCTOft RArt \ \AU ;rte} VOLTAGRID LW WELD COJNIY USR22-XXXX NWI/4 OF SWI/4 6 S:CIITN 20. TOWNSHIP 2 NORM, RANGE 64 WEST DEIENDON FOND DET S __ CRCWIR HOLES I J (IV. f ]) I�II'� • GALVIAAVd 15RELDPLATEPT0 BE NM SIANES5 r.J' Y.N. lig j ] RY•l ��• µ�l RIP RAP. SW ( [ NOTES) D RIP RAP MELT .x' 6 J.]S (Mt) . I NV- 114131' ]�• �' 1.FO Ivly) TRW CUTLET a-SEA04— Tr RCP WELT PRE FLY Rl•I14LIR 1S i \ ,,c---_,,,./— 7 \\� / \ I 1 ' `\ I 4RAd[D SILO. VWu1RS HAROwARE 0.52T,22.47,—.1... W� I S: v.»••• SLOPE VARIES (SEE BANS) I. •)\ `\ A1E5 . IICRCRIOL DCAR L r 1 1 % / PREPARE COWACRD SW WAGE \ �1r IS MC DEEM. PER PLACE W[LL SCACAC FOAN[ AnAC`ERDIC CANNEEL BY ■ ���i�• PRONE• [0 WS kFWRMC µVEST LCELOC WFCF TEAR o STRUM. LT D. 1w13D' 1 1 USP[ti GNGIpN2GR R[R BfU WLNnOL 1 CLLLOO a (3) • J/0• W NO[S O- ML- 424515-/ '' KIDS 100-YR RESTPICTOR PLATE I. SOL RRRAP DEWS ARE APRCAOC 10 SLOPED ANAS RVEA 10 THE SHE P. ACNh IOWA.. ANO MOM wr.Iwlsr B' A'A L _ J 1, VIII MEM ALLY SDL DO A NPRASLBY IN SLVOLUME NM SEC O- APPROVED SOx. BY \LOWS PRIOR WENN TOO PLACEMENT -CONEY IVRAOCND RK5 Al IRE DESIGN I . COVPACI AND LEVEL 10 DAINAR ALL VOIDS AND ROC. PROACNAL ABOVE D.LI RIPRAP TOP WADE. t A. CRIMP OR MUIIY YUGN OR USE APPROwD HYW WFIId AS CALLED FOR iN IRE BANS SRCCICAIIONS SEU CHANNNEL lORIOEDrINTSTANDARD CONCRETBORON RESTRICTOR PLATE DETAIL M1 SOIL RP RAP DR} DR} xoT m SOLE MK D SIDES W IARm. IRALIBY WATE31 WAl11Y MN(R°6 RATE RJ DRJ um TO MU RRC DASSOLmmA® WO PAR- IC I. PROVIDE Coxnnuo S NEOPRENE CASKET MATERIAL OMEN IM ORO.. PLATE IND CONCRETE. 1. BOLT IX MCI( PLATE 10 CONCRETE Ir W0. OP CENTER. SO CCNCREIE• IC cum LLYOV WAVE WM. FAOrt En moo ANA 1/1• THE% HOE UPPED GALVANIZED RR PERFORATED wATER WARTY•• MR MLR [LASSOS. YOU -114210 ` `•. • • ` T. AELL-SEEN RAW RAGS Si.LLI BE SAPLESS STEEL AND SHALL SE ATTACHED BY IMRWREAT ADS ALO.C RE ME O ME DONiN1G FRAME. WAR TRASH RACKS SHALL BE ALLMNI1 MD AALL 3 B.. USNG STAINLESS STEEL NAROrARE. ACK LARG/WOIOTA. APIR. EA F VARDE) h RAY TOES S. TNM TO BE RASH RAG OPEN AREAS I WIIIWI O J/0• WUAI[RACK HAW DWFRN 1 ROW CONTROL RATE Cr DO— f IANLLSS SRtI SRPWI BARS _ `. ` ; (]) • • O OfNASA 4. STRUCTURAL OMAN O TRASH RACKS WALL BE BASED W RILL HYDROSTATIC READ wM AND HAD rU OwNSIRLAN O IM RAGA. BORON Ku DUO.. OS' b'� mxJet/Am F, ���p" Q i' V• .` FC a0�, ' G ]. •, `• • S I nolo omo SARLLIv�C SS SHALL a PWNRD (SING SIAVLLS SLR HARDWARE AND PROMOS] NTH FRINGED AND LOCKABLE W WADI ACCESS PANELS D IY jEAD N0. B] NAPLESS — • 61ANLLSS 90.8 It' uA1 TAOVG 1 fIY WAILS SHNJ ILL SIARIfSS SICEL aIMxN. W Sltfl SItLL WAILS SNaI ° H01 OV t�1Y�GPAT[S 51A1L BC OCSICCffD 5J000AT., Hsi IIICRDIAGIAU170WCNSDN 0.[�LNIUW BORON BCC( aFl.-IwI.bR' J. Cr EACH WENNL Is .. •I AJIACNED BYERECTION EJ-� 1. .NS,>l UflG4u0Eb5 ra pA1GRASN RACKS SHnLL 9: BASED W RILL NYOJpS1ATIC REV PITH ZERO II[AO DEC AROUND RTJ9•-JL-OOA SECTION �R - RAN VIEW SECTION CC WJwnO m R'1 DETENTION POND OUTLET STRUCTURE V ■ ARROW who),belaw. w whor.Call fbelow.re IOMAT q DRJ DRJ ...API:. .MI you DR3 Voltagrid LLC Voltagrid USR (PRE22-0218) Waste Management Plan This plan has been prepared in accordance with a request from Weld County to outline the waste management plan for handling waste produced at the site located in Lot B of Recorded Exemption RE -3024 within the NW 1/4 of the SW 1/4 of Section 20, Township 2 North, Range 64 West in Weld County Colorado. It lies east of Weld County Road 51, halfway between Weld County Roads 18 and 20. Waste anticipated to be generated at this site include used or broken vehicle and equipment maintenance materials and general office waste. Possible site waste includes vehicle batteries and fluids, equipment lubricants, cleaning supplies, and other general maintenance and office materials. Onsite waste will be stored in compatible containers or containment devices designed or engineered for the purposes for which they will be utilized. These containers will be inspected on a regular basis to ensure that no undue wear, structural issues, sever rust, other defects, which may impact their effectiveness. Waste materials will be transported offsite via truck to a licensed third -party solid waste disposal facility/landfill. Frequency of these operations will vary by site based on waste volumes. The commercial facility planned to be used for solid waste disposal includes: Waste Management Buffalo Ridge Landfill 11655 County Road 59 Keenesburg, CO Intersection of County Road 59 & County Road 20 Weld County Treasurer Statement of Taxes Due Account Number R0947801 Parcel 130520000013 Assessed To VOLTAGRID LLC 917 MULBERRY LN BELLAIRE, TX 77401-3211 Legal Description PT SW4 20-2-64 LOT B REC EXEMPT RE -3024 (.54R) Year Tax Tax Charge 2022 $14.00 Total Tax Charge Tnterest Fees $0.00 $0.00 Sites Address WELD Payments Balance Grand Total Due as of 02/10/2023 $0.00 $14.00 $14.00 Tax Billed at 2022 Rates for Tax Area 2450 - 2450 Authority WELD COUNTY SCHOOL DIST RE3J CENTRAL COLORADO WATER (CCW HUDSON FIRE AIMS JUNIOR COLLEGE HIGH PLAINS LIBRARY Taxes Billed 2022 * Credit Levy Mill Levy 15.0380000` 17.0240000 1.0680000 9.2360000 6.3070000 3.1810000 Amount Values $4.07 AG -DRY FARM LAND $4.59 Total $0.29 $2.49 $1.70 $0.86 51.8 540000 $14.00 Actual $1.004 $14.00 Assessed $270 $1.004 $270 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY, REAL PROPERTY, AND MOBILE HOMES - AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIER'S CHECK. POSTMARKS ARE NOT ACCEPTED ON TAX LIEN SALE REDEMPTION PAYMENTS. PAYMENTS MUST BE IN OUR OFFICE AND PROCESSED BY THE LAST BUSINESS DAY OF THE MONTH. Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer, are evidence of the status as of this date of all property taxes, special assessments, and prior tax liens attached to this account. Signed Current year's taxes are due but not delinquent. Date: 1400 N. 17th Avenue, Greeley, CO 80631. PO Box 458, Greeley, CO 80632. (970) 400-3290 Page 1 of 1 Hello