HomeMy WebLinkAbout20232517.tiffCOLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
August 22, 2023
To Whom it May Concern:
RECEIVED
AUG 2 2 2023
WELD COUNTY
COMMISSIONERS
On August 22, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for Rocky
Mountain Midstream, LLC - Mustang Compressor Station. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this
notice is required by Colorado Air Quality Control Commission regulations. The notice must be available
for public inspection for a period of thirty (30) days from the beginning of the public notice period.
Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.cotorado.gov/cdphe
I?LL61 i c, 4' em
o$13p(z3
Jared Potis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
e.e PLC-rpt-t,I4LCDsILL)9
NI az01I�2 I ZI *(. ), oa)µ
g
M. , Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: Rocky Mountain Midstream, LLC - Mustang Compressor Station - Weld County
Notice Period Begins: August 22, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Rocky Mountain Midstream, LLC
Facility: Mustang Compressor Station
Natural Gas Compressor Station
Section 12 of Township 3N, Range 65W
Weld County
The proposed project or activity is as follows: Rocky Mountain Midstream, LLC (Rocky Mountain) has requested
permit coverage of the dual product tanks located at this compressor station. Permitting history and
compliance: These tanks were originally constructed in 2019. After an inspection conducted in 2022 and
Compliance Order on Consent (COC) issued by the Division on 3-9-2023, Rocky Mountain has agreed to permit
this source as required by regulation and the COC.
The Division has determined that this permitting action is subject to public comment per Colorado Regulation
No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements.
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 23WE0409 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the Commission.
The Division will receive and consider written public comments for thirty calendar days after the date of this
Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe_apcd airpermitcomments®state.co.us
• Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 1 I a
COLORADO
Department ofpublle
Hoidtb 6 Enalrpnment
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
aWl==:=„
COLORADO
2
Hello