Loading...
HomeMy WebLinkAbout20231656.tiffM M ya a COLORADO Department of Public Health b Environment Weld County - Clerk to the Board 1150 O St PO Box 758 Greeley, CO 80632 May 26, 2023 To Whom it May Concern: RECEIVED MAY 2 6 2023 WELD COUNTY COMMISSIONERS On May 26, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for Kerr- McGee Oil and Gas Onshore LP - 36150369. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. Pub l: C Re✓;eoJ 06 /tH /2.3 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.cotorado.gov/cdphe Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director Cc.. rL (Tr/MN), HL (DS), 06 (ail Pw(cHIFR/cK/Dp/DO 06/12 /23 2023-1656 Air Pollution Control Division Ml7"M. Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Kerr-McGee Oil and Gas Onshore LP - 36150369 - Weld County Notice Period Begins: May 26, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Kerr-McGee Oil and Gas Onshore LP Facility: 36150369 Well Production Facility NENW quadrant of Section 6, Township 3N, Range 67W Weld County The proposed project or activity is as follows: Initial construction permit request for combustion of low pressure separator gas from a high/low pressure separator. The facility is in the severe ozone nonattainment area and is synthetic minor for VOC NANSR and OP programs. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 22WE0587 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe apcd airpermitcomments@state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil ft Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will 2.02 , 1 sue COLORADO Department of Public Health 6 Environment be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 iltWli==, COLORADO 2 Hello