Loading...
HomeMy WebLinkAbout20232719.tiff4%0 COLORADO Department of Public Health & Environment Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 September 12, 2023 To Whom it May Concern: RECEIVED SEP 12 2023 WELD COUNTY COMMISSIONERS On September 12, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for Noble Energy, Inc. - CECIL USX T6N-R64W-S1 L03. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe I Jared Poles, Governor I Jill Hunsaker Ryan, MPH, Executive Rirector Dcriv7 jz3 ?to CE:e 1c,►-< ») D0), bG/JM) oq/if/13 2023-2719 Air Pollution Control Division • `+ • ri, ya Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Noble Energy, Inc. - CECIL USX T6N-R64W-S1 L03 - Weld County Notice Period Begins: September 12, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Noble Energy, Inc. Facility: CECIL USX T6N-R64W-S1 L03 Well Production Facility SENE quadrant of Section 1, Township 6N, Range 64W Weld County The proposed project or activity is as follows: Operator requested the initial construction permit for condensate storage tanks currently permitted under General Permit 01 coverage with new throughputs and permit limit. Permit 23WE0100 will cover condensate tanks. This project includes permit exempt for engine less than 50 horsepower. This facility will be considered new synthetic minor of VOC by NANSR through this project after reclassification on 11/07/2022. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application A copy of the application, the Division's analysis, and a draft of Construction Permit 23WE0100 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe apcd airpermitcomments@state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 1 AO COLORADO Departmento[PubUe Health 6 Envkoatnent NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 2 In COLORADO Depuement of Public Heakh 6 Envl :,, Hello