Loading...
HomeMy WebLinkAbout20231092.tiffCOLORADO Department of Public Health b Environment Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 April 4, 2023 To Whom it May Concern: RECEIVED APR 0 a 10'13 WELD TY COMMISSIONERS 3 On April 4, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Five Rivers Upper. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. PvbI;C Rev;ej 04/19/23 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director cc: P L C rr f MN),1.)L CPO, O6 (sm), PrJ(CH/ER/CK/Db/pU) O4 /17/23 2023-1092 • Air Pollution Control Division to Notice of a Proposed Project or Activity Warranting Public TM Comment Website Title: PDC Energy, Inc. - Five Rivers Upper - Weld County Notice Period Begins: April 4, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Five Rivers Upper Well Production Facility SESE quadrant of Section 8, Township 4N, Range 66W Weld County The proposed project or activity is as follows: Operator requested the construction permit modifications for condensate storage tanks, produced water storage tanks, and condensate loadout. Also, new throughputs of three points are requested. This project includes two compression engines' cancellation that has been removed from this facility. This facility will be considered new synthetic minor of VOC by NANSR and reclassification on 11/07/2022 through this project. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 14WE1288 are available on the Division's website at https://www.colorado.Rov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.Qov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe apcd_airpermitcomments@state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 (COLORADO S1 tcerth Health b Envlrotutient NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 (6"E7C:Irt ORADO 2 Hello