Loading...
HomeMy WebLinkAbout20232618.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF TWO RIVERS PARKWAY BETWEEN COUNTY ROAD 54 AND STATE HIGHWAY 60 FOR APPROXIMATELY ONE (1) WEEK, FOR BRIDGE FINALIZATION AND UTILITY WORK COMPLETION WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close Two Rivers Parkway, between County Road 54 and State Highway 60, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective September 24, 2023, for approximately one (1) week for bridge finalization and utility work completion. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that Two Rivers Parkway, between County Road 54 and State Highway 60, be temporarily closed, with said closure being effective September 24, 2023, for approximately one (1) week for bridge finalization and utility work completion, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc: so(Rsl D;sPo fic1t, CS p O4/26/2.3 2023-2618 EG0024 TEMPORARY CLOSURE - TWO RIVERS PARKWAY PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 11th day of September, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: W,,,,,e4A) .. '. o:64 " man, Chair Weld County Clerk to the Board BYCAtiart114•UditiZU)lC.K. Deputy Clerk to the Board AP"��T` D - r'•" O:►1: County At :rney Date of signature: 0(I I g / Z6 Z Perry L. B � , Pro-Tem ott K. James � J 2023-2618 EG0024 MEMORANDUM TO: Clerk to the Board DATE: September 6, 2023 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting retroactive approval from the board for an emergency closure on WCR 31 between WCR 84 and WCR 86 for a culvert replacement. This closure occurred on August 30, 2023, and is anticipated to be closed until September 22, 2023. See attached closure diagram. Weld County Public Works is requesting approval from the board for a road closure on Two Rivers between WCR 54 and HWY 60 for bridge finalization following utility work completion. This closure will begin on September 24, 2023, and will be complete by September 29, 2023. See attached closure diagram. 2023-2618 q/1 \ EeiOuZ`i- www.invarion.com X14-103 • Il M4-9 DETOUR M4-9 ? orrouliff M4-103 V. CR SD S f e4i M4-9 r� I E.R_L _; Si" Er" n a L§) u g a t -#4•4;9, t, .. IL's. e fw� I Z 2 [ a hl lti �s 52 *11 M4-103 BUM M4-103 • 1 1 p • i L 1 f I 1 I I 1 / a • 1 isarr- a a 4 I a a W20-3 4 . . 1 W20 /Q 12 FE lil M4-9 W20- RIB ea..e-,55 0-1 • • W2Q-1F lita 1 •--wwwis'1Vz�1F '01%. P., r i-4egg II: 21 14 WM 02. M Tat - \APIs tr IS: :i ». 'a 0-1F • WA -1F • • • 4R44R-S.eel 4 fir, 1.% ;"• 11111.4 ria rear t4 4 W20-3 M4-9 W20-3 W20-3 W20-3 Pr.Fa IN - ►I a A y_ W2(�. J M4-10 L` V Pot A'9 ynee il U..n `� 1' Ar'cwrrac 0 ONEAL0 k ROAD Ns tsa z $ 'PPP W2gaat PROJECT # rc-125 ROAD CLOSURE DESCRIPTION 0 Two Rivers between WCR 54 and HWY 60 Closed 9/24/2023 thru 9/29/2023 l {for Bridge Guardrail NOTICE TO PUBLIC Road signs and barricaded Message boards to be used DETOUR ROUTE WCR 54 between Two Rivers and HWY 257 2 miles paved HWY 257 between WCR 54 and HWY 60 2 miles paved HWY 60 between HWY 257 and Two Rivers 2 miles paved NOTES. ADTof WCR is: 9825 / 2021 Detour is paved Prepared by: Ryan Reynolds 8/30/2023 Hello