HomeMy WebLinkAbout20232067.tiffa„,
COLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
July 18, 2023
To Whom it May Concern:
RECEIVED
JUL 18 2023
WELD COUNTY
COMMISSIONERS
On July 18, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Crestone Peak Resources Operating, LLC - Edith Ann -Duckworth 21H-0268 Battery. A copy of this
public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
-Pbtic,"Blv«u)
hl?4k Z3
ex,: 17L(TrI - .1), 14LLDS ILL),
'PSI.(Ex GK/DD)Da), DG Lim)
''t j18� 023
2023-2067
a.:„:4,.
- Pollution Control Division
-4 Notice of a Proposed Project or Activity Warranting Public
`4`iliw Comment
Website Title: Crestone Peak Resources Operating, LLC - Edith Ann -Duckworth 21H -O268 Battery - Weld
County
Notice Period Begins: July 18, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Crestone Peak Resources Operating, LLC
Facility: Edith Ann -Duckworth 21H -O268 Battery
Well Production Facility
SWSE quadrant of Section 21, Township 2N, Range 68W
Weld County
The proposed project or activity is as follows: Operator requested the construction permit modification for
low-pressure separator with updated throughput and new permit limits. Permit 20WE0763 will cover
separator venting. This project includes condensate storage tanks general permit (GP01). This facility will
be considered new synthetic minor of VOC by NANSR through this project after reclassification on
11/07/2022.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 20WE0763 are available
on the Division's website at https://www.colorado.Rov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe_apcd_airpermitcomments@state.co.us
• Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 1 I S
COLORADO
5=7::=
m
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
iteicoLoRAD0
2 Department of Pu6lle
Health 6 Environment
Hello