Loading...
HomeMy WebLinkAbout20231789.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING EXTENSION OF TEMPORARY CLOSURE OF COUNTY ROAD 44 BETWEEN COUNTY ROAD 33 AND U.S. HIGHWAY 85 FOR APPROXIMATELY AN ADDITIONAL TWO (2) WEEKS, FOR UNANTICIPATED DELAYS DUE TO INCLEMENT WEATHER WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, on the 5th day of June, 2023, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board determined that conditions exist which made it necessary to temporarily close County Road 44, between County Road 33 and U.S. Highway 85, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective June 12, 2023, for approximately two (2) weeks, through June 26, 2023, for roadway and intersection improvements, and WHEREAS, on the 26th day of June, 2023, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to extend said temporary closure of County Road 44, between County Road 33 and U.S. Highway 85, with said extended closure being effective June 26, 2023, for approximately an additional two (2) weeks through July 10, 2023, for unanticipated delays due to inclement weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. cc: So (1,..s1,-.• spo ta., CS P 06/30/23 2023-1789 EG0024 EXTEND TEMPORARY CLOSURE - COUNTY ROAD 44 PAGE 2 BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the closure of County Road 44, between County Road 33 and U.S. Highway 85, be, and hereby is, extended, with said extended closure being effective June 26, 2023, for approximately an additional two (2) weeks through July 10, 2023, for unanticipated delays due to inclement weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 26th day of June, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST:d i) f�',�A:�,� EXCUSED Mik-___ eman, Chair Weld County Clerk to the Board BY: AP eputy Clerk to the Board ounty Attorney Date of signature: OCalon1(`01 Per L. B r k, Pro-Tem Sc•tt K. James Lori Saine 2023-1789 EG0024 MEMORANDUM TO: Clerk to the Board DATE: June 22, 2023 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Jalisco International Inc. is requesting permission to extend the closure of CR 44 between CR 33 and US 85 from 6/26/23 through 7/10/23 for roadway and intersection improvements for CDOT flyover project. Completion was delayed due to weather. Original closure date approved on 5/31/23 was for 6/12/23 through 6/26/23. See attached closure diagram. 2023-1789 2Gooa9 www.invarion.com ,(C ARDENT TRAFFIC SERVICES. INC in LOSE I ` ' rAre I; // /� 1, / ,// / '/ / / CLI F] LIE rOUR alC3fiRiv DETOUR t rSStF4 MPH 30 35 TYPE URBAN LOW URBAN LOW FRWse WIDTH 12' t.2 '7' MERGING TAPER 130' 245' 560' SHIFTING TAPER 90' 123' 3 ii I SHOULDR TAPER 60' 82 220' DEV SPC TAPER 30' 35 55' OEV SPC TANGENT 60' 70 110' SIGN SPACING 100' 100' 500' NOT DRAWN TO SCALE MHT NO. DESCRIPTION Ardent No Designed by: Project: Project No.: 031 CR 44 TEMP CLOSURE 2021-012 Antonio Ledezma, TCS US 85 & Peckham Grade Separation NI -ARE' 0853-107 (21006) Proj Owner: COOT Prime: Jalisco Intl Inc. COMMENTS This MHT Shows the work are for the TEMP CR 44 Closure. "•Flaggers my be moved or removed depending on the work as approved by the engineer. This MHT is based on latest version of the MUTCD TA 20 & 25 .. This MHT should be used with MHT 001. MHT 008 This MHT may be used with MHT's for this project •• All signs and devices used to meet the requirements of NCHRP 350 " The closure may be moved. lengthened or shortened depending on the work as approved by the engineer or designee. Any conflicting Signs will be covered or removed Work Hours: Work Hours Mon - Fri 7am - Sprn. other hours as approved by the PM Lane closures Single Lane lam- Spin Other Hours as Approved by the PM Flagging 7a - Som. Other hours 36 approved by the PM Legend [Jr { Vizor. Anew Manifest 1 9 x Cone 4 x Barrel 2 x M4-9 detour (RI 1 x M4-1DL Detour Left 1 x M4-9 Detour Straight 1 x R3-1 no right turn 1 x W20-3 road dosed ahead 5 x Type Ill Barricade 2x M4-9 detour (L) 2x R11-2 road dosed R11-2 lx M4 -10R Detour Right lx R11-4 R11-4 1 x W20-2 detour ahead COMPANY NAME TITLE SIGNATURE PREPARED BY ARDENT TRAFFIC SERVICES Antonio D. Ledezma Pres / TCS APPROVED BY Ryan Idler Peter Kubiak Hello