HomeMy WebLinkAbout20232586.tiffRESOLUTION
RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY
CLOSURE OF COUNTY ROAD 59 BETWEEN COUNTY ROADS 6 AND 8 FOR
APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, pursuant to said statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary to
temporarily close County Road 59, between County Roads 6 and 8, to through traffic and to
regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being
effective September 12, 2023, for approximately four (4) days for a culvert replacement.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 59, between County Roads 6 and 8, be
temporarily closed, with said closure being effective September 12, 2023, for approximately
four (4) days for a culvert replacement, and further, that standard official traffic control devices
shall be erected at said closure giving notice of the restrictions.
Cc:so(as), D:spa-tc1.,, GSP
act/N/23
2023-2586
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 59
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 6th day of September, A.D., 2023.
BOARD OF COUNTY COMMISSIONERS
WELD,COUNTY,
NTY, COLORADO
ATTEST: ddb;
Mike a man, Chair
Weld County Clerk to the Board
BY:
AP
l
eputy Clerk to the Boar
Count Attorney
Date of signature: O5/12123
Lori Saine
2023-2586
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: August 30, 2023
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting approval to close Weld County Road 59 between Weld County
Road 6 and Weld County Road 8 beginning 9/12/23 thru 9/15/23 for culvert replacement.
See attached closure diagram.
2023-2586
q / � EC OUZc'I
Y - a mill .-- Y. lin Ma le
W20 -1F
gl
-ate--i L R. - ► i i f i-11-s L• - m
M4-
1
1
1
1
WCRB aes- -- „es mess....•..r�.�
.»......a-s..a_...►.,.-.....• . else Ow • 41-•-••••
• 4O ass...a•.....i......�
M4-9
M 11O130
DETOUR
4
M4
.... j •-0-F`.•aaaamer••i-•-s-•'•stew!f..•-4.a.o.a+��►• J• a seen' • • ea -We •
W20 -1F
v
m
c
M4-9
mil.weia• MO lb
www.invarion.com
PROJECT # AN -59
ROAD CLOSURE DESCRIPTION
WCR 59 between WCR 6 and WCR 8
Closed 9/12/2023 thru 9/15/2023
for culvert replacement
NOTICE TO PUBLIC
Road signs and barricaded
DETOUR ROUTE
\NCR 6 between WCR 59 and WCR 61 1 mile gravel
'NCR61 between WCR6and WCR 8 1 mile gravel
WCR 8 between WCR 61 and WCR 59 1 mile gravel
NOTES:
ADT of WCR is. 134/2016
'Culvert replaced is Irrigation: OLD: 18" ARCH CMP
NEW: 18" CSPA
PA
Water to be used for dust control
Culvert is .1 South of WCR 8 on WCR 59
Prepared by: Ryan Reynolds
8/30/2023
Hello