HomeMy WebLinkAbout20231269.tiffRESOLUTION
RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY
CLOSURE OF COUNTY ROAD 83 BETWEEN STATE HIGHWAY 14 AND COUNTY
ROAD 94 FOR APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado' statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, pursuant to said statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary to
temporarily close County Road 83, between State Highway 14 and County Road 94, to through
traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure
being effective May 16, 2023, for approximately four (4) days for a culvert replacement.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road County Road 83, between
State Highway 14 and County Road 94, be temporarily closed, with said closure being effective
May 16, 2023, for approximately four (4) days for a culvert replacement, and further, that standard
official traffic control devices shall be erected at said closure giving notice of the restrictions.
Cc:so(RS), D,SP.*,c1,, CSP
0S/17/23
2023-1269
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 83
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 8th day of May, A.D., 2023.
ATTEST: dditA) ...(44%te
Weld County Clerk to the Board
ountyi'' :rney
Date of signature: O5/16/23
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
waid
Mik
2023-1269
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: May 3, 2023
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting permission to close Weld County Road 83 between State
Highway 14 and Weld County Road 94 beginning 5/16/23 thru 5/19/23 for culvert replacement.
See attached closure diagram.
Weld County Public Works is requesting permission to close Weld County Road 22 between US 85 and
Weld County Road 31 beginning 5/22/2023 thru 6/16/2023 for Super Structure and Deck Replacement.
See attached closure diagram.
2023-1269
5/`3"
ECG OOZE}
www.invarion.com
assaLi aJ
j
i 1 -i-_- -i T7Zj
O
r
183/100A
WCR 100 ' aas aatom►+-rraa++ ►t mass or.•a+w-�a••4-lie war
• s_�.r• s a a airs, i • este.s'• a wen # �+...« r► • ari r.� w �a siv�
a`� * a��a r s�
sv€E1 e:1
Si REF!•
1
I
III
b
W20-3
W20-3 4
1
NCR 92
r.a�a•i-�►-�f+v-
W20 -1F
r
i
f
t
'NCR ci
rine. e s eta. • a r a.sr► a a • ID 441-41- • • • ++terra � s
W20 -1F
M4-9
•
M4-9
PROJECT # AN -59
ROAD CLOSURE DESCRIPTION
WCR 83 between WCR 94 and SH 14
closed 5/16/2023 thru 5/19/2023
for culvert replacement
NOTICE TO PUBLIC
Road signs and barricaded
DETOUR ROUTE
WCR 94 between WCR 83 and WCR 89 3 mile gravel
WCR 89 between WCR 94 and SH 14 2 mile gravel
SH 14 between WCR 89 and WCR 83 3 mile paved
ADT of WCR is: No Count
_� �_ - -�� Culvert replaced is irrigation: with new 18" CSPR
M
3 Culvert is 100' North of SH 14 on WCR 83
M4-9 do
1D
a
G
E
i
Water to be used for dust control
Prepared by: Ryan Reynolds
5/2/2023
Hello