Loading...
HomeMy WebLinkAbout20231269.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROAD 83 BETWEEN STATE HIGHWAY 14 AND COUNTY ROAD 94 FOR APPROXIMATELY FOUR (4) DAYS, FOR CULVERT REPLACMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado' statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 83, between State Highway 14 and County Road 94, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective May 16, 2023, for approximately four (4) days for a culvert replacement. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road County Road 83, between State Highway 14 and County Road 94, be temporarily closed, with said closure being effective May 16, 2023, for approximately four (4) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Cc:so(RS), D,SP.*,c1,, CSP 0S/17/23 2023-1269 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 83 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 8th day of May, A.D., 2023. ATTEST: dditA) ...(44%te Weld County Clerk to the Board ountyi'' :rney Date of signature: O5/16/23 BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO waid Mik 2023-1269 EG0024 MEMORANDUM TO: Clerk to the Board DATE: May 3, 2023 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close Weld County Road 83 between State Highway 14 and Weld County Road 94 beginning 5/16/23 thru 5/19/23 for culvert replacement. See attached closure diagram. Weld County Public Works is requesting permission to close Weld County Road 22 between US 85 and Weld County Road 31 beginning 5/22/2023 thru 6/16/2023 for Super Structure and Deck Replacement. See attached closure diagram. 2023-1269 5/`3" ECG OOZE} www.invarion.com assaLi aJ j i 1 -i-_- -i T7Zj O r 183/100A WCR 100 ' aas aatom►+-rraa++ ►t mass or.•a+w-�a••4-lie war • s_�.r• s a a airs, i • este.s'• a wen # �+...« r► • ari r.� w �a siv� a`� * a��a r s� sv€E1 e:1 Si REF!• 1 I III b W20-3 W20-3 4 1 NCR 92 r.a�a•i-�►-�f+v- W20 -1F r i f t 'NCR ci rine. e s eta. • a r a.sr► a a • ID 441-41- • • • ++terra � s W20 -1F M4-9 • M4-9 PROJECT # AN -59 ROAD CLOSURE DESCRIPTION WCR 83 between WCR 94 and SH 14 closed 5/16/2023 thru 5/19/2023 for culvert replacement NOTICE TO PUBLIC Road signs and barricaded DETOUR ROUTE WCR 94 between WCR 83 and WCR 89 3 mile gravel WCR 89 between WCR 94 and SH 14 2 mile gravel SH 14 between WCR 89 and WCR 83 3 mile paved ADT of WCR is: No Count _� �_ - -�� Culvert replaced is irrigation: with new 18" CSPR M 3 Culvert is 100' North of SH 14 on WCR 83 M4-9 do 1D a G E i Water to be used for dust control Prepared by: Ryan Reynolds 5/2/2023 Hello