HomeMy WebLinkAbout20232720.tiffCOLORADO
Department of Public
Health ft Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
September 12, 2023
To Whom it May Concern:
RECEIVED
SEP 12 2023
WELD COUNTY
COMMISSIONERS
On September 12, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Noble Energy, Inc. - CHANDLER ST T3N-R64W-S15 L01. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
�ubllGR t iJl e (�()
Da17/ Z� ILL( iT kt1,0 41—(DSILL�,
I�GJ CE-z-i f -t j of<I Di) I Diu), v C (-J
act110/z3
2023-2720
Mr74M
440 Notice of a Proposed Project or Activity Warranting Public
- ‘44lik' Comment
Air Pollution Control Division
Website Title: Noble Energy, Inc. - CHANDLER ST T3N-R64W-S15 L01 - Weld County
Notice Period Begins: September 12, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Noble Energy, Inc.
Facility: CHANDLER ST T3N-R64W-S15 L01
Well Production Facility
NENE quadrant of Section 15, Township 3N, Range 64W
Weld County
The proposed project or activity is as follows: Operator requested the construction permit modification for
gas venting from low-pressure separator(s) and vapor recovery tower(s) with new throughputs and permit
limit. This project includes permit exempt for condensate loadout. This facility will be considered new
synthetic minor of VOC by NANSR through this project after reclassification on 11/07/2022.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 18WE1327 are available
on the Division's website at https://www.colorado.Qov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe_apcd_airpermitcomments®state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 1 I )(lit
COLORADO
DepartmentoEPublie
Health 6 Environment
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
2l*
COLORADO
11 Department of Public
6 Envlmnment
Hello