Loading...
HomeMy WebLinkAbout20231984.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING EXTENSION OF TEMPORARY CLOSURE OF COUNTY ROAD 44 BETWEEN COUNTY ROAD 33 AND U.S. HIGHWAY 85 FOR APPROXIMATELY AN ADDITIONAL TWO (2) WEEKS, FOR UNANTICIPATED DELAYS DUE TO INCLEMENT WEATHER WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, on the 5th day of June, 2023, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board determined that conditions exist which made it necessary to temporarily close County Road 44, between County Road 33 and U.S. Highway 85, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective June 12, 2023, for approximately two (2) weeks, through June 26, 2023, for roadway and intersection improvements, and WHEREAS, on the 26th day of June, 2023, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to extend said temporary closure of County Road 44, between County Road 33 and U.S. Highway 85, with said extended closure being effective June 26, 2023, for approximately an additional two (2) weeks through July 10, 2023, for unanticipated delays due to inclement weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions, and WHEREAS, on the 12th day of July, 2023, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board determined that conditions exist which made it necessary to extend said temporary closure of County Road 44, between County Road 33 and U.S. Highway 85, with said extended closure being effective June 26, 2023, for approximately an additional two (2) weeks through July 31, 2023, for unanticipated delays due to inclement weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc: So(RS) p :Spa,+c �., CS? 07/24/23 2023-1984 EG0024 EXTEND TEMPORARY CLOSURE - COUNTY ROAD 44 PAGE 2 NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the closure of County Road 44, between County Road 33 and U.S. Highway 85, be, and hereby is, extended, with said extended closure being effective June 26, 2023, for approximately an additional two (2) weeks through July 31, 2023, for unanticipated delays due to inclement weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 12th day of July, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ddtA4A) ' jeka tom. Weld County Clerk to the Board BY: APP County A torney Date of signature: O7/r2H /23 Mi eman, Chair err L. Bu; , Pro-Tem S ott K. Ja Kevin D. Ross Lori Sain 2023-1984 EG0024 MEMORANDUM TO: Clerk to the Board DATE: July 7, 2023 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Jalisco International Inc. is requesting permission to extend the closure of CR 44 between CR 33 and US 85 through 7/31/23 for roadway and intersection improvements for CDOT flyover project. Completion was delayed due to weather. See attached closure diagram. 2023-1984 -7/(7- CC 00 Z4 F C') (J DEr _ _A n, II! L.; PO40 .nasty C4 e4? L CLOSED I1 / 4 www.invarion.com b MPH 30 2 55 TYPE URBAN LOW URBAN LOW FRVtft WIDTH 12' 12 1. MERGING TAPER 180' 245' 550 SHIFTING TAPER 9C' 123' 330 SHOULDR TAPER 50 32 220 DEV SPC TAPER 30, 3` DEV SPC TANGENT F0+ 70 110' SIGN SPACING 100' 100' 500' COMPANY PREPARED BY ARDENT TRAFFIC SERVICES APPROVED BY NAME Antonio D. Ledezma ARDENT TRAFFIC SERVICES. INC NOT DRAWN TO SCALE DESCRIPTION Ardent No. Designed by: Project: Project No.: Proj Owner: CR 44 TEMP CLOSURE 2O21 -012 Antonio l_edezma, TCS COMMENTS US 85 8. Pockham Grade Sep®ration NH PP 0853-107 (21OO6) Jalisco Intl Inc. • This VHT ohcws :he work are for the TEMP CR 44 Closure. **naggers my be moved or removed depending on the work as approved by the engineer. -• This MHT is based on latest version of the MUTCD TA 20 & 25 ▪ This MHT should be used with MHT 001, MHT 008 This MHT may be used with MHT's for this project " All signs and devices used to meet the requirements of NCHRP 350 The closure may be moved. lengthened or shortened depending on the work as approved by the engineer or designee. Any conflicting Signs will be covered or removed Work Hours: Work Hours Mon • Fri 7am - Spm. other hours as approved by the PM Lane Closures Single Lane lam- 5pm Other Hours as Approved oy the PM Flagging. la - Spin Other hours as approved by the PM Legend A Cone Work Area Manifest 19 x Cone 4 x Barrel 2 x M4-9 detour (R) 1x M4 -10L Detour Left 1 x M4-9 Detour Straight 1 x R3.1 no right turn 1 x W20-3 road dosed ahead TITLE Pres /TCS Ryan Idler Peter Kubiak 5 x Type III Barricade 2 x M4-9 detour (LI 2 x R11-2 road closed R11-2 1 x M4 -10R Detour Right 1 x R11-4 R11-4 1 x W20-2 detour ahead SIGNATURE Hello