Loading...
HomeMy WebLinkAbout20230640.tiffa COLORADO Department of Public Health Et Environment Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 February 22, 2023 To Whom it May Concern: RECEIVED FEB 2 2 2023 WELD COUNTY COMMISSIONERS On February 22, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for Extraction Oil Et Gas, Inc. - Vic Production Facility. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I 310 Hunsaker Ryan, MPH, Executive Director Publ : c Rev:e,J cc:PL("ro/NvA HL(OS), oo(T)A Pw (cH/Egkg/pD/oN) 03/off/23 03/0,2/23 2023-0640 aM!�"eM Notice of a Proposed Project or Activity Warranting Public Comment Air Pollution Control Division Website Title: Extraction Oil a Gas, Inc. - Vic Production Facility - Weld County Notice Period Begins: February 22, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Extraction Oil Et Gas, Inc. Facility: Vic Production Facility Well Production Facility SENE Sec 20 T7N R67W Weld County The proposed project or activity is as follows: Applicant proposes the permitting of several points at a new well pad facility. This facility initially registered for coverage under GP10 in December of 2021, and these construction permits will replace that coverage. Points being permitted include: one condensate tank battery, one produced water tank battery, one hydrocarbon liquid loadout point, and the venting of low pressure and Vapor Recovery Tower gases during Vapor Recovery Unit downtime. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 22WE0591 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation • Send an email to cdphe_apcd airpermitcomments®state.co.us • Send comments to our mailing address: Ben Fischbach Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 COLORADO nepatlt�entoerunua Health 6 Envin)nmeni NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 =sm COLORADO Department of Public Health 6 Environment Hello