Loading...
HomeMy WebLinkAbout20232924.tiffcMlM M- �n 4 COLORADO Department of Public Health Et Environment Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 September 29, 2023 To Whom it May Concern: RECEIVED SEP 2 9 2023 WELD COUNTY COMMISSIONERS On September 29, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Judy 6 Sec HZ. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe -Publcc.ReviBJ lolltul z3 Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director tee'. 1PL lPl+4as), FFLLi>5ILLD, PLO CSeICA-tic-K-I i»Ipsi,oGLJPt) . 1O/ozlz 3 2023-2924 M�M�M Air Pollution Control Division i4,... r Notice of a Proposed Project or Activity Warranting Public g� Comment Website Title: PDC Energy, Inc. - Judy 6 Sec HZ - Weld County Notice Period Begins: September 29, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Judy 6 Sec HZ Well Production Facility NESE of Section 6, Township 4N, Range 64W Weld County The proposed project or activity is as follows: The operator is requesting traditional permit coverage for condensate storage vessels, produced water storage vessels and hydrocarbon liquid loadout at a new synthetic minor oil and gas well production facility located in the severe ozone nonattainment area. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 22WE0004, 22WE0005 Et 22WE0006 are available on the Division's website at https://www.colorado.Qov/cdphe/air-permit-public- notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.Rov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe_apcd_airpermitcomments@state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 (COLORADO Department of Public 1 I Health b Environment NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 21* COLORADO 51=:;i= Hello