HomeMy WebLinkAbout20232241.tiffRESOLUTION
RE: APPROVE NON-REFUNDABLE QUOTE LETTER FOR RELOCATION OF HIGH
PRESSURE GAS PIPELINE METER STATION FOR COUNTY ROAD 41 AND
STATE HIGHWAY 52 INTERSECTION PROJECT AND AUTHORIZE CHAIR TO SIGN -
XCEL ENERGY
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with a Non -Refundable Quote Letter for the
Relocation of a High Pressure Gas Pipeline Meter Station for the County Road 41 and State
Highway 52 Intersection Project between the County of Weld, State of Colorado, by and through
the Board of County Commissioners of Weld County, on behalf of the Department of Public
Works, and Xcel Energy, with further terms and conditions being as stated in said quote letter,
and
WHEREAS, after review, the Board deems it advisable to approve said quote letter, a
copy of which is attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Weld County, Colorado, that the Non -Refundable Quote Letter for the Relocation of a High
Pressure Gas Pipeline Meter Station for the County Road 41 and State Highway 52 Intersection
Project between the County of Weld, State of Colorado, by and through the Board of County
Commissioners of Weld County, on behalf of the Department of Public Works, and Xcel Energy,
be, and hereby is, approved.
BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized
to sign said quote letter.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 2nd day of August, A.D., 2023.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: d„,,A4A)C� JClto•(4,
Weld County Clerk to the Board
BY:
eputy Clerk to the Boar
APPROVED AS TO FOR
A • -County Attorney
Date of signature: O$/Io/23
cc:PW(CH/ER/DD)
OS/3(/23
40,
rts
man, Chair
i!l P •
erry/' B; ck, Pro-Tem
Scot K. James
7
evin D. Ross
257,4.A.
Lori Saine
2023-2241
EG0081
Cri-vxc iz4 I
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
PASS -AROUND TITLE: WCR 41 / SH 52 Intersection Project Xcel Energy High Pressure Gas Relocation
Non-refundable Quote Letter
DEPARTMENT: Public Works DATE: 7/5/23
PERSON REQUESTING: Don Dunker, and Cutis Hall
Brief description of the problem/issue:
WCR 41 / SH 52 Intersection Project will install a left turn lane on the WCR 41 north and south legs of the
intersection. Wider shoulders and larger radii at the corners will also be installed. The intersection design was
shifted to the east to avoid a house at the SW corner and a Western Midstream 20" process waterline, 8" gas
line and 12" gas line next to the existing west ROW line. As a result, the shift to the east requires an Xcel
Energy High Pressure Gas metering station at the NE corner to be relocated from its current location further
east.
Xcel Energy has provided staff with a cost estimate of $1,658,490.40 to do this relocation. The cost of
acquiring ROW, easements for the process waterline and gas lines on the west side of the existing road is
expected to cost more than $1.7 million. Xcel has also indicated in the email that the non -refund letter needs to
be signed by the County to agree to this amount. The 2023 budget to do this relocation is currently at
$1,100,000 which indicates an additional $558,490.40 would be required if the BOCC agrees to the relocation
cost. This project has a CDOT/CMAQ grant for $953,445.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options):
Option 1: The Board may choose to recommend approval of the Xcel Energy relocation cost and sign the letter.
Option 2: The Board may choose to request Public Works staff to schedule a work session to discuss the issue.
Recommendation:
To keep the project moving forward and on schedule, Staff recommends the BOCC approve option 1 above
which is to approve the Xcel relocation cost of $1,658,490.40 and sign the letter.
Perry L. Buck, Pro -Tern
Mike Freeman, Chair
Scott K. James
Kevin D. Ross
Lori Saine
3/2,
Approve Schedule
Rec,pounendation Work Session
4917136 Pages: 2 of 4
08/24/2023 12:22 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
uIII MittUPI JAM IiiiMari Dlf II
Other/Comments:
2023-2241
E oO I
Xce/Energy
June 16, 2023
Don Dunker
County Engineer
1 150 O St.
Greeley, CO 80631
Subject: Request For High Pressure Gas relocation at 40.080794', -104.678150°, Hudson,
Colorado
Dear Don Dunker,
I have completed the engineering design and cost estimate to provide High Pressure Gas relocation
based upon information you have provided. This design is based upon High Pressure Gas
relocation, as shown on the enclosed drawing. The cost to provide the requested High Pressure
Gas relocation is $1,658,491.00, which is non-refundable. If the Applicant elects to have the
Company advance the Construction Payment for the duration of the construction period,
Applicant will be billed by the Company in accordance with the Company's tariffs, within 30
days after the construction of the Extension is complete. The Applicant shall pay the Company
within ninety (90) days after the Construction Completion date.
This proposal is contingent upon the following:
• Alt work performed during our normal work hours.
• Obtaining "Right -of -Way" at no cost to us.
• Obtaining permits as needed.
• No frost, in the ground, during construction or agreeing to pay for additional costs during
frost conditions.
• There is an additional charge to open the transformer.
• Providing final grade elevations, at our equipment locations.
• Grade at trench location to be within 6 inches of the final grade.
If necessary our right-of-way agent will mail the right-of-way or easement documents to the
appropriate landowners for their signature. This proposal is contingent upon receiving
easements at no cost to us. Our right-of-way agent will need a copy of the Warranty Deed, the
legal description, and the site drawing in order to prepare the easement for the landowner's
signature.
NOTE: You must personally contact the local telephone company, the local cable TV company
and/or any other utility company to arrange for the installation and payment of any costs of their
facilities if they need to be relocated or disconnected along with the relocation.
If you accept the above costs and system design, please sign and date the second page of this
letter and return this document to Public Service Company of Colorado, at the address shown
below. After the signed and dated documents are received, a work order will be issued and
Revision January 28, 2022 Non-refundable Quote Letter PA
4917136 Pages: 3 of 4
08/24/2023 12:22 PM R Fee:$0.00
Carly
III IYU��IIGiJT N Clerk and Recorder,
!'ihi4 4� �' J�I� 6411111 a oar -02,2 I
released so your project can be placed on the construction schedule. When payment is due if a
check is sent via the new payment process we are unable to accept checks with any sort of Lien
Waiver because our Tariffs do not make an allowance for PSCo to accept checks printed or
stamped with a lien waiver. Our current lead-time to begin work after receiving the signed
documents is approximately 24 weeks. You will be notified of the week that our construction is
scheduled to begin as soon as it is available.
This proposal will be valid until July 07, 2023. If you have any questions regarding this project,
please call me at (970)690-9080.
Sincerely,
Delaney Morgan
Gas Engineering HP
Mailing address:
1 123 W 3rd Ave
Denver, CO 80223
Name: Timothy O'Connor
Title: EVP, Chief Operation Officer
Re: High Pressure Gas, relocation, 40.080794°, -104.678150°
I have reviewed and approve of the enclosed design. I accept the cost of $1,658,491.00 and this
amount will be paid to Xcel Energy within 90 days of the construction completion date. The
Construction Cost stated above does not include special items such as but not limited to frost or
rock conditions. In the event the Company encounters any special items during construction, the
Company shall bill Applicant for such special items as a non-refundable contribution in aid of
construction.
I will send a signed copy of this letter with the applicable agreements.
Date: AUG 0 2 2023
*Customer Signature:
Mike Freeman, Chair
Title: Board of Weld County Commissioners
Mailing address: 1150 "0" Street
Greeley, CO 80631
* Confidential Information
Revision January 28, 2022 Non-refundable Quote Letter PA
4917136 Pages: 4 of 4
08/24/2023 12:22 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII fFJIRILdal4TIPAMJIM 0 MPhil '111.1.'444k 11 III
2
.92%1,3 —a 2 LA/
From:
To:
Cc:
Subject:
Date:
Attachments:
Morgan, De anev N
port Dunker
Cinde Wright
RE: WCR 41 & HWY 52 (GH-3 Relocation
Thursday, June 22, 2023 1:07:17 PM
jmage001,png
( ution : This email originated from outside of Weld County Government. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Hi Don,
Unfortunately after speaking with upper management, this is as detailed of a breakdown as we can
go. We are replacing like for like on this station, and any upgrading will come at Xcel Energy's cost.
Best Regards,
Delaney Morgan
Xcel Energy
Staff Gas Pipeline Engineer, Gas Transmission Engineering
1123 W. 3rd Ave Denver, CO 8O223
(97O)69O-9O8O
From: Don Dunker <ddunker@weld.gov>
Sent: Wednesday, June 21, 2023 10:50 AM
To: Morgan, Delaney N <Delaney.N.Morgan@xcelenergy.com>
Cc: Cinde Wright <cwright@weld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
EXTERNAL - STOP & THINK before opening links and attachments.
Do you have a break down for each main category shown below? This is the information my Board
of County Commissioner will want to see.
Thanks,
Don
From: Morgan, Delaney N <Delaney.N,Morganc xcelernergy.corn>
Sent: Wednesday, June 21, 2023 10:21 AM
To: Don Dunker <ddunkerTweld.gov>
Cc: Cinde Wright <cwr'ghtweld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Good morning,
Below is a breakdown based on Ancillary, Engineering, and construction of each component of this
relocation as well as material cost. Let me know if you need any additional information.
Ancillary
Support
Services
$ 353,284.01
Project
Management
& Planning
$ 353,284.01
Engineering
Services
$ 152,131.85
Design & Constructability
Support
$ 152,131.85
Construction
Services
$1,153,074.55
Materials
$ 305,087.48
Removal
Building,
(Exisitng
Fencing)
T -G,
Meter
Set,
$ 85,000.00
T -O Valve
& HP
line Relocaion
$ 161,394.42
Meter
Building,
Station
Fence
Install
Gravel,
(Meter
Set,
Acess Road
$ 601,592.65
Total Cost
$ 1,6580490.40
Best Regards,
Delaney Morgan
Xcel Energy
Staff Gas Pipeline Engineer, Gas Transmission Engineering
1123 W. 3rd Ave Denver, CO 80223
(970)690-9080
From: Don Dunker <ddunk! weld.gov,
Sent: Wednesday, June 21, 2023 9:50 AM
To: Morgan, Delaney N <Delaney,N.Morganaxcelenergy.com>
Cc: Cinde Wright <cwright(cOweld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
i _
EXTERNAL - STOP & THINK before opening links and attachments
Hi Delaney,
I need the backup data as to how you derived at the $1.658M. It needs to show Weld is only paying
for like for like or 4" gas line for a 4" gas line. Please let me know if you have questions.
Thanks,
Don Dunker, P.E.
Weld County, County Engineer
From: Morgan, Delaney N <Delaney.N.Morgar•Cbxcefenefgy.cotn>
Sent: Tuesday, June 20, 2023 8:20 AM
To: Don Dunker <ddunkerPwe d.gov>
Subject: WCR 41 & HWY 52 (GH-3 Relocation
This email originated from outside of Weld County Government. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Good Afternoon,
Attached is the non -refund letter requiring your signature.
Let me know if you need any additional information.
Delaney Morgan
Xcel Energy
Staff Gas Pipeline Engineer, Gas Transmission Engineering
1123 w 3rd Ave Denver, Co 80223
(970)690-9080
reern: droller Wr er < .y ; r,.; ,y,_ . ;_y_11>
Sent. Monday, April 25, 2012 3'25 PM
Tot 8Cl-Co <.. cv.t..•
Cis Morn. Ka My <1.t.a-=S,:-,Y►Lt.Ctett.SC :.s: Don Ou tart <3!a'.a:.ior :astns feats Martian ca
Subjoelt FW' WCA 41 and State Highway 52 Intersection
LXf (NNA1, 'rum .4 1)f •rK t•." s '. I
a,
last *ecerrater we put in a request for Info/melon regard kit a valve suUon at the NE corner of lwy 52 and WCR 4 I n Weld County- We did not receive any Information at thst tnse, however we decided to proceed as if we could
more the Writ natant to IM n M
We are now moving forward vnth the design of the Intersection and would file to touch base With you on the protect r ne protect is going to to decried by in roust County staff this war, with `tOW and Jetity re+uubun occurring in
2O23 Please let us know who our print of contact is for the protect. If we cou d get a rough cost estimate and scope of wort( involved with retocaturg the station, we would appreciate 4 Thank you
Grids
Prom Croat Wright
$inti Tuesday. December Al. 2021 12:US PM
Tot as. csatat r't'Ct:tt
WOW,: WCR 41 and State Highway 52 Morsection
Please see the attached request ktr info rotation regarding a valve station in the NE corner of the intersection Thank yrxi I
Devon FnQlneer (PE)
t,S%tl %'rte P*j %.t •1.
Grotty. CC 40631
(Mt 400.3719 - owe
19701342-9549 - cad
Wa
Conn den deity Notke: this electronic transmission .md any ittacerd documents or other writings are Intended only forth" person or entity to Mich It is addressed and may contain information that is privileged, confidential or
otherwise protected from d:sciasure If you have received this cornmwdcathy in error. please lelrnedtetety notify strider by return e-mail and destroy she communication Any disclosure, copying, dlianbution or the taking of any action
concerning the con ttnts of this torimunkatkin or any attachments by anyone other than the named rnoplent is stric+Jyrenhi it.d
CaleSalny,.`
1W tr�ada►at
A rtv: MO la and San Mglawy Si halt
e.er tiare.utar, ILS..L t I t, atn)1:e t:0 ara
Imp flu's tail rsamtS wi rem 'owl burn 7trrt ►har'1t
Onde
From: Hill, Rnhert M<Rnhrrt IU it:Ilfj@Xee'{.rr•rgycoin>
Sant: Monday, lune 27, 20210:53AM
to: Cinde Wright . cwrighttOweldgov come
Cs: Don Dunker <ddunker@weldgov.com>; TraceAnderson <tarderxin@weldgov corn pi; Ifolder, Andrew P <Andrew P He der)xccienergy corn)
Sublet[: RE. WCR 41 and State Highway 52 intersection
Mr awlwiplat ee1ear•.al.e,itia11e..ag/iar 'flOlt rtciillriovi.}nn3.ies boa ir alias JIM Ilk m.yt'rcIto torkrAN! MoWl,Mc.elIn+riah
Mande.
I was honing to get something to you much sooner I rn refining our estimate, but we're tooting at between 5500t to 5800k to reitxe:e our statiun and piping within tx.ir sire That doesn't include land acquisition
We have a federal rule that requires us to have uui erneiger:cy isuIati xa valves at east 15ft from the buildirig, so although we can nxot the pining anti pat up wane bollards fairly easily, we would ultimately have to move the entire
regutalo•/mater station further to the east as well This is also a transfer panic between Xcer and Atmos so thel/tl need to reconligure their piping un the north side. of Me site
ell get you a hetler Oclimate by the and of the week hut hopefully this belts let me know if you hap any Questions
Thanks.
Rob HII P E PMP
*oaf Energy I Naaponalble By Nature
Sr On Transmission Engineer, HPGE
1123 Wee 3rd Ave , Denver, CO 80223
P 303-571.338 C: 830.89D-9049
tcr331 f sf act Ja ccca
From: Cinde Wright< 1phtts dagia.tct>
Sant: Wednesday, April 7'/, 101217:31 PM
To: Hill, Robert M <kcircii 1! t • • ot.ce,r.r.c aDSs2'
Cc: purr Dunker <Ijt:,,tikcl('eetektzc', imp: Trace Anuerson <lca"; a'. kas' er c_r•>
Sublaci: R): OCR 4 t and State Highway 52 Intersection
You Oral ale pa teal Da • snag a ■ 44sn, irio Irootsbassetteel
LXTtW4AL t tIO'iflG •rs clerir•f roc• •irn3..la n;•
fl3/4100
Sorry IN; is confusing COOT has a project that is mstaiing the traffic signal lights at the Intersection (this year) Wetd county Is designing a separate protect to add felt turning lanes on both legs of WfR 41 Our project is starting the
Jesigtt this year with ROW being purchased and utility relocations to he done in 2023, and roadway ccnstrt'ction :n 2024 I think the correspondence that you forwarded to us was regarding the COOT protect
We have been conrd:nal.ng with COOT on the traffic light locations so that we don't have to r2loCate them when our proiectgocs in As your email stated with the C001 protect. they are ,yorking within the existing ROW for the traffic
pale locations and the Xcel gas valve station isn't affected by their protect The County's roadway widening protect will affect the gas valve station because we decided to push the roadway to the east (there is an enstirg residence and
large gas I nes to the wrst of the intersection we nerd to avoid) I've attached a drawing showing our preliminary layout and you can see how the Xccl valve station is affected
Wald you lot tit know whit the implications would he to move the fac.lity to the east approximately 20' 30'? Could ,ere get an approximate cost at relocating the facility? From what I have laid out for the intersection, the building and
valves west of the 'structure would be most affected As the design progresses, we can provide more detailed drawings
thank ycul
Cinde
D ,err
■ ? s's)c ". V , cixoft v., >t *
4- ` C a ynrynsm•.-up:nsac,ecet•• )tkUItlarS,Snows•:tAranirnAt•i'r'e.iseSO•r•FGt•tos..-,:*ta,wv..y.eann er.,••rwp•u.w.a".**•tellb• .ksna.wuswa,'••1Ra4Nstialas tug of r • be
it :s a ueN 1.i -•,r. -••.,. t 13 w`>wCa. — w -raw.." a-...\rwr . • ...v ' .t r. •� .I >Y - a• • tw, age -ego (, ta•
•
',aat I►sv\ •r•
aeons ti t9•
a
it • m * . i
:a. w.-st. a gassy
is 1.••• r,w (awn r,.,, r 9 .N.:.•:.14 ... • • • +
a gco a'd•• •- s: •
Cl •.I) !A:. .; '.••Sit ' :3:b.n111 iv 'r•••rt al(O1 P1r1•r 4 &M;3:*;s .is7a�e1'a?
►i' - -%I •e
.2.-
"4.. 'bar. 1••.%V'r•' .
• . •
• • a • • • • •••. . '
• . , • ' 1 .• •'t '
• . .
1 r • • ' 1 I Air
\ ,
. 1 • 1// • •• r I 1 .
•
• • •
+♦
I ••• ir . . 1
•
•r•
• • • ••' • • •
4• - . . •
.
• I
3 • 'e r♦
•
•w. ••r ' • : •
4,11.1
• . • • .•• • • • Q a 1.
• ...071 11.14,41
14V
Fiero: Itiit, Robert M <1,•y0 •1• S tatuttr.:rDS'
Sant Wert rwcday, April 71, It12A tkAO AM
Ts: Pnr:rasdoretots<t7/1aa.fry- titALCUCautibt Horn, Kelly <ItilttbL:`:is:t.t:.11di-CYi: >" Conde Wright <cHrrtbht1 at djw u r eon DaA n: ti•wo: ,c stC%_uttsCC'), Tact ta+fen o <I.Rjc'avtaart ►'r Len
Cc:O'Shea, Mrdlael K < MicaujjActili i r-tr fl, A+>- Ward, April 1 c*t.0 r "':a tiy. tclr-yacc.; Welch. Mark E c vas r MN. r warp •true
Iubjeet: RE• WCR 41 and State H,ghway52 Intersection
Cwear MbmsdongwrwFite 3+biborWelilCwntyGureemsat Iheeld/citladscrevcw.uatl-talsiwla•1rnrecevieaSe1a4oandLaee:►eua4aua;she
was informed Xcel didn't need to perform this review arymore by your engtneerins consultant (see Die attached e mail) Will rh•s need to be re..ewed again?
Ihank,,
'lob N►:.P
Jtcsa Enarpy I ResDoesINe Sy fWlute
Sr. 3as irencmisslon Engineer, HPGE
1173 Wes 3rd Ave . Owner, CO. 80223
P 303.371-3346 C: 630-89O-904$
i:Atsl Li:• Clitartsltrr..Ora_
Fromr Err'oactunents < agagt • • tt ,v • )
Sat Tuesday, April 26, 20222:38 PM
To: Horn, Kelty<I•t..a:.L::s2latv'.Ciitssr;Ctnde Wright < rc, EhiliCyabir,Qu11rr Don Dunker<•tiunAv' Alyce:rigur,cratt : Likmittil6Cetlataillahrj, Hitt. Robert 1Ae ft:L +,yp rligsit+rf-re, v
Cc(flned.MichaelK<4ts.'rr't3Stiestntrrilserer•.Ward.Agr4J<AeaiOn'Qwrrare.Le tWelch,Mark F<VIES. t ►YrdH.lnettnp :>•
Subset* RE' WCR 41 and State kkthwey 51 intersection
Hello
Ihis encroachment 4546 was assigned to Rob i tiff an Jan 4. 1O22. i sent the rn:tiel intake emit, to cw.r;ht@wetdkmr curt an that same day
Y": s ; - world yrxo please tollaw up with Conde'
Thant yarn,
Kseta Aoffnisyst
Kee Energy 1 Rnpon [sole 8y Nalurs
tier Otnttieu Irian; sp.Welal
1123 W 3'd Ave Denver. CO 60223
P: (103) 5714313
C: Aai2atistlnslniltataWastern
Fromm Horn. Kelly <ttlair irlttrn tr>
Sat: Tuesday, April 26, 2072 A:15 AM
Tar uncle Wright <; wrlgnrnigringer' cc,;._ • Don lbrnker <;+yjynrlpr yyg)ttltg'LL;tlnfr; trdr tiete'tu gem
Cc O'Shea, Michael K<'!!I'tl`.trs:7k^tAstten •tit* s.v• ►ialtitte ee. ItICIA • tlett2atteitilit6C:L-CilLiferna. Ward. April 1 <lluy„Q vtSogftraj cn>; Welch, Mark r <Mrs,Letigstt ititt{aettill +,i
Subfest: RI: WCR 41 and State Highway 52 intersection
Good morning Cinch',
As 1 stated in December 2021 I am not *e contact nor am quati!ied to assist you with your CDO- protect to relocate the high pressure gat gencml:soon lines At that time I was told to refer you to Mike O'Shea the
Manager of Gas Transmission Engineering department
I have cc's nfrtt Mod I am forwarding you, coned with your attached application and site print to him Please teach ott to him !or assistance on your project
Thank you,
kany Horn
xcel thargy
P+anner Dully S La/out Engrnemry
1460 W ft A6ti Aryeda.(O.80003
Pr 363.425 1966 Cat JO) 356-8670
1 ttisha !S*t*'S'aU4L.,
Houstan Aragon
From:
Sent:
To:
Cc:
Subject:
Don Dunker
Friday, July 28, 2023 9:37 AM
Houstan Aragon
Curtis Hall
Fwd: WCR 41 & HWY 52 (GH-3 Relocation
Houstan,
Here is the response from Xcel gas see below. It is okay to sign the non refundable quote etter.
Let me know if you have more questions.
Thanks,
Don
Sent from my iPhone
Begin forwarded message:
From: "Morgan, Delaney N" <Delaney.N.Morgan@xcelenergy.com>
Date: July 28, 2023 at 7:15:19 AM MDT
To: Don Dunker <ddunker@weld.gov>
Cc: Cinde Wright <cwright@weld.gov>, Curtis Hall <chall@weld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
Caution. This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize tl
sender and know the content is safe.
Hi Don,
This letter should be still good to sign.
Thanks,
Delaney Morgan
Xcel Energy
Stan Gas Pipeline Engineer, Gas Transmission Engineering
1123 W. 3rd Ave Denver, CO 80223
(970)690-9080
From: Don Dunker <ddunker@weld.gov>
Sent: Thursday, July 27, 2023 4:46 PM
To: Morgan, Delaney N <Delaney.N.Morgan@xcelenergy.com>
Cc: Cinde Wright <cwright@weld.gov>; Curtis Hall <chall@weld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
EXTERNAL - STOP & THINK before opening links and attachments.
Delaney,
The non-refundable quote letter you sent to get signed says it is only good through 07/07/23 and must
be signed before that date. I am just now able to get it on the Board of County Commissioner agenda
are we still okay to sign it? The Clerk to the Board is asking the question they process all agendas and
need to know asap.
Thanks,
Don Dunker, P.E.
Weld County, County Engnieer
From: Morgan, Delaney N <Delaney.N.Morgan@xcelenergy.com>
Sent: Thursday, June 22, 2023 1:07 PM
To: Don Dunker <ddunker@weld.gov>
Cc: Cinde Wright <cwright@weld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize tl
sender and know the content is safe.
Hi Don,
Unfortunately after speaking with upper management, this is as detailed of a breakdown as we can go.
We are replacing like for like on this station, and any upgrading will come at Xcel Energy's cost.
Best Regards,
Delaney Morgan
Xcel Energy
Staff Gas Pipeline Engineer, Gas Transmission Engineering
1123 W. 3rd Ave Denver, CO 80223
(970)690-9080
From: Don Dunker <ddunker@weld.gov>
Sent: Wednesday, June 21, 2023 10:50 AM
To: Morgan, Delaney N <Delaney.N.Morgan@xcelenergy.com>
Cc: Cinde Wright <cwright@weld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
EXTERNAL - STOP & THINK before opening links and attachments.
Do you have a break down for each main category shown below? This is the information my Board of
County Commissioner will want to see.
Thanks,
Don
From: Morgan, Delaney N <Delaney.N.Morgan@xcelenergy.com>
Sent: Wednesday, June 21, 2023 10:21 AM
To: Don Dunker <ddunker@weld.gov>
Cc: Cinde Wright <cwright@weld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize tl
sender and know the content is safe.
Good morning,
Below is a breakdown based on Ancillary, Engineering, and construction of each component of this
relocation as well as material cost. Let me know if you need any additional information.
Ancillary
Support
Services
$ 353,284.01
Project
Management
&
Planning
$ 353,284.01
Engineering
Services
$ 152,131.85
Design
& Constructability
Support
$ 152,131.85
Construction
Services
$ 1,153,074.55
Materials
$ 305,087.48
Removal
T-O,
Meter
Set,
Building,
(Exisitng
Fencing)
$ 85,000.00
Valve
&
HP
Line
Relocaion
$ 161,394.42
1-0
Meter
Station
Install
(Meter Set, $ 601,592.65
Building,
Fence,Gravel,
Acess
Road)
Total
Cost $ 1,658,490.40
Best Regards,
Delaney Morgan
Xcel Energy
Staff Gas Pipeline Engineer, Gas Transmission Engineering
1123 W. 3rd Ave Denver, CO 80223
(970)690-9080
From: Don Dunker <ddunker@weld.gov>
Sent: Wednesday, June 21, 2023 9:50 AM
To: Morgan, Delaney N <Delaney.N.Morgan@xcelenergy.com>
Cc: Cinde Wright <cwright@weld.gov>
Subject: RE: WCR 41 & HWY 52 (GH-3 Relocation
EXTERNAL - STOP & THINK before opening links and attachments.
Hi Delaney,
I need the backup data as to how you derived at the $1.658M. It needs to show Weld is only paying for
like for like or 4" gas line for a 4" gas line. Please let me know if you have questions.
Thanks,
Don Dunker, P.E.
Weld County, County Engineer
From: Morgan, Delaney N <Delaney.N.Morgan@xcelenergy.com>
Sent: Tuesday, June 20, 2023 8:20 AM
To: Don Dunker <ddunker@weld.g.ov>
Subject: WCR 41 & HWY 52 (GH-3 Relocation
Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize tl
sender and know the content is safe.
Good Afternoon,
Attached is the non -refund letter requiring your signature.
Let me know if you need any additional information.
Delaney Morgan
Xcel Energy
Staff Gas Pipeline Engineer, Gas Transmission Engineering
1123 W. 3' I Ave Denver, CO 80223
(970)690-9080
Contract Form
New Contract Request
Entity Information.
Entity Name.
XCEL ENERGY
Entity ID*
O00000400
Contract Name. Contract ID
WCR 41 , SH 52 INTERSECTION PROJECT XCEL ENERGY HIGH 7241
PRESSURE GAS RELOCATION NON-REFUNDABLE QUOTE
LETTER Contract Lead.
DRUNKER
Contract Status
CTB REVIEW
❑ New Entity?
Contract Lead Email
ddunkerOco.weld.co.us
Parent Contract ID
Requires Board
YES
Department Project
GR-59
Contract Description"
XCEL ENERGY HAS PROVIDED STAFF WITH A COST ESTIMATE OF $1,658,490.40 TO RELOCATE THIS METERING STATION OUT
OF THE WAY FOR OUR WCR 41 AND SH 52 INTERSECTION
PROJECT, THIS QUOTE LETTER IS A NON-REFUNDABLE LETTER WHICH NEEDS SIGNED BY THE BOCC.
Contract Description 2
Contract Type
AMENDMENT
Amount.
51,658,490.40
Renewable.
NO
Automatic Renewal
NO
Grant
IGA
Department
PUBLIC WORKS
Department Email
CM-
PublicWorks?nweldgay.corn
Department Head Email
CM-PublicWorks-
DeptHeadNweldgov,com
County Attorney
GENERAL COUNTY
ATTORNEY EMAIL
County Attorney Email
CM -
C OU NTYATTOR N EY@WELDG
O1/.COM
Requested BOCC Agenda
Date
07, 26,+2023
Due Date
07:22;2023
Will a work session with BOCC be required?*
NO
Does Contract require Purchasing Dept. to be included?
YES
Bid/RFP#*
GR-60
tf this is a renewal enter previous Contract ID
If this is part of a MSA enter MSA Contract ID
Note: the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in
OnBase
Contract Dates
Effective Date
Review Date.
0711 5,2024
Renewal Date
Termination Notice Period
Contact Information
Committed Delivery Date
Expiration Date*
07/17,2023
Contact Info
Contact Name Contact Type Contact Email Contact Phone lI Contact Phone 2
Purchasing
Purchasing Approver
CHERYL PATTELLI
Approval Process
Department Head Finance Approver
.CURTIS HALL CHERYL PATTELLI
Purchasing Approved Date
07/27;2023
Legal Counsel
BRUCE BARKER
DH Approved Date Finance Approved Date Legal Counsel Approved Date
07,=26=2023 07,26;`2023 07/2712023
Final Approval
BOCC Approved
BOCC Signed Date
BOCC Agenda Date
08/02,=2023