HomeMy WebLinkAbout20232487.tiffalto
COLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
August 18, 2023
To Whom it May Concern:
RECEIVED
AUG 18 2023
WELD COUNTY
COMMISSIONERS
On August 18, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC
Energy, Inc - Ridge State 17 Sec HZ. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver. CO 80246-1530 P 303-692-2000 www.colorado.gov!cdphe
0117-5r 1:2-5
Jared Polls, Governor I 011 Hunsaker Ryan, MPH, Executive Director
Le. ►—'LLTPIKk L4LCts L —L
Cfiz 1 bi+ I cdk I PT) ) v u u)
tiSi1zZ)23
2023-2487
r.v., sAir Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
�
Comment
Website Title: PDC Energy, Inc - Ridge State 17 Sec HZ - Weld County
Notice Period Begins: August 18, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc
Facility: Ridge State 17 Sec HZ
Well Production Facility
SWSW of Section 17, Township 5N, Range 66W
Weld County
The proposed project or activity is as follows: PDC Energy, Inc. (PDC) is requesting permit coverage for
condensate storage vessels, produced water storage vessels, hydrocarbon liquid loadout and spark ignition
reciprocating internal combustion engines (SI RICE) at a new synthetic minor oil and gas well production
facility located in the ozone non -attainment area. Public comment is not required for the SI RICE because
they are covered under the GP02.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 21WE0598, 21WE0599 Et
21WE0600 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-
notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe_apcd_airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 1 1
COLORADO
Department of Public
Health 6 Environment
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02 2 I
COLORADO
Department of Public
Health 6 1::=.
Hello