Loading...
HomeMy WebLinkAbout20232487.tiffalto COLORADO Department of Public Health & Environment Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 August 18, 2023 To Whom it May Concern: RECEIVED AUG 18 2023 WELD COUNTY COMMISSIONERS On August 18, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc - Ridge State 17 Sec HZ. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver. CO 80246-1530 P 303-692-2000 www.colorado.gov!cdphe 0117-5r 1:2-5 Jared Polls, Governor I 011 Hunsaker Ryan, MPH, Executive Director Le. ►—'LLTPIKk L4LCts L —L Cfiz 1 bi+ I cdk I PT) ) v u u) tiSi1zZ)23 2023-2487 r.v., sAir Pollution Control Division Notice of a Proposed Project or Activity Warranting Public � Comment Website Title: PDC Energy, Inc - Ridge State 17 Sec HZ - Weld County Notice Period Begins: August 18, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc Facility: Ridge State 17 Sec HZ Well Production Facility SWSW of Section 17, Township 5N, Range 66W Weld County The proposed project or activity is as follows: PDC Energy, Inc. (PDC) is requesting permit coverage for condensate storage vessels, produced water storage vessels, hydrocarbon liquid loadout and spark ignition reciprocating internal combustion engines (SI RICE) at a new synthetic minor oil and gas well production facility located in the ozone non -attainment area. Public comment is not required for the SI RICE because they are covered under the GP02. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 21WE0598, 21WE0599 Et 21WE0600 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public- notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe_apcd_airpermitcomments@state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 1 1 COLORADO Department of Public Health 6 Environment NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 2 I COLORADO Department of Public Health 6 1::=. Hello