Loading...
HomeMy WebLinkAbout20232807.tiffCOLORADO Department of Public Health & Environment Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 September 22, 2023 To Whom it May Concern: RECEIVED SEP 21 2023 WELD COUNTY COMMISSIONERS On September 22, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Bost Farm 5-7 Pad. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe i4) ►Dioglz3 Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director g o PLOP! m l l) , C t351 LLB, 0(117.7.1,23 gAir Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: PDC Energy, Inc. - Bost Farm 5-7 Pad - Weld County Notice Period Begins: September 22, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Bost Farm 5-7 Pad Well Production Facility NWNW quadrant of Section 7, Township 5N, Range 66W Weld County The proposed project or activity is as follows: Operator requested the construction permit modifications for condensate and produced water storage tanks with new throughputs and permit limits. Permit 19WE0975 and 19WE0976 will cover condensate tanks and produced water tanks. This project includes points' cancellations for gas compression engines. This facility will be considered new synthetic minor of VOC and NOx by NANSR through this project after reclassification on 11/07/2022. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 19WE0975 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation • Send an email to cdphe apcd_airpermitcomments@state.co.us • Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 1 I a (COLORADO nepuemeee ,.."c Health 6 EmAronment NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. AteroL07,:p.,:2 2.n2 2 menc Hello