HomeMy WebLinkAbout20232805.tiffa,tio
COLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
September 22, 2023
To Whom it May Concern:
RECEIVED
SEP 21 2023
WELD COUNTY
COMMISSIONERS
On September 22, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Enerplus Resources (USA) Corporation - Saskatchewan Pad. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
.C/ OF COt
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Hunsaker Ryan, I�e9d'
Jill an, MPH, Executive Director ti
Rubl c." e,i11
tolDgtz3 0), L(1%6/
Pillt`��(6I}DM), DG ILO 2023-2805
Dq(22123
CMlM�M
Notice of a Proposed Project or Activity Warranting Public
441-4-1111
Comment
Air Pollution Control Division
Website Title: Enerplus Resources (USA) Corporation - Saskatchewan Pad - Weld County
Notice Period Begins: September 22, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Enerplus Resources (USA) Corporation
Facility: Saskatchewan Pad
Well Production Facility
SESE quadrant of Section 34, Township 8N, Range 66W
Weld County
The proposed project or activity is as follows: The following project consists of permits 20WE0771,
20WE0774, and 20WE0775 where a reduction in permitted limits are being requested for the following
construction permits.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 20WE0771 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil a Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
2.02 1 I S
COLORADO
Department of Public
Health 6 Environmext
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
IcOLORADO
2 DaputmentofPubllo
Health 6 Environmext
Hello