HomeMy WebLinkAbout20233400.tiff COLORADO
• j Department of Public
® Health b Environment
Weld County-Clerk to the Board
1150 0 St RECEIVED
PO Box 758
Greeley,CO 80632 NOV 2 0 2023
November 20,2023 WELD COUNTY
COMMISSIONERS
To Whom it May Concern:
On November 20,2023,the Air Pollution Control Division will begin a 30-day public notice period for
PDC Energy,Inc.-Huron-Ledford 22 Sec HZ.A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office.A public copy of
this notice is required by Colorado Air Quality Control Commission regulations.The notice must be
available for public inspection for a period of thirty(30)days from the beginning of the public notice
period.Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S.,Denver,CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
I y
Jared Polls,Governor I Jill Hunsaker Ryan,MPH,Executive Director „.
41O1 i c--ge,V l.,e t,�) cm:PL L PI M P4),W L CDs LL, \,„.,
•
t l I z112 3 PIO CE,g,I eN I(-KI DPI PM), 2023-3400
ll11)`13
MiM Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
C
� Comment
Website Title: PDC Energy,Inc.-Huron-Ledford 22 Sec HZ-Weld County
Notice Period Begins: November 20,2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy,Inc.
Facility: Huron-Ledford 22 Sec HZ
Well production facility
SESE SEC 22 T5N R64W
Weld County
The proposed project or activity is as follows: PDC Energy,Inc.submitted an application for a modification
at an existing synthetic minor oil and gas well production facility located in the ozone non-attainment area.
This modification involves updated combustor count,new site-specific emission factors,reduced throughput
limit,and increased permit limit for VOC.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No.3,Part B,Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application,the Division's analysis,and a draft of Construction Permit 21WE0983 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices.This page also
includes guidance for public participation
• Send an email to cdphe_apcd_airpermitcomments®state.co.us
• Send written comments to our mailing address:
Air Pollution Control Division-Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South,APCD-SS-B1
Denver,Colorado 80246-1530
�,y: COLORADO
2.02 1 I " Het`b Ea tmnm,,
NOTE:Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public.Your comments and the division's responses are not considered confidential and will
be publicly accessible,including your name and any other personal information you provide in your
comments.
COLORADO
v 11=1%,7=
2.02 2 I �9ii�
Hello