HomeMy WebLinkAbout20233396.tiff COLORADO
•�N Departme
He nt of Public
Health Et Environment
Weld County-Clerk to the Board
1150 O St RECEIVED
PO Box 758
Greeley,CO 80632
NOV 2 0 20B
November 20,2023 WELD COUNTY
COMMISSIONERS
To Whom it May Concern:
On November 20,2023,the Air Pollution Control Division wilt begin a 30-day public notice period for
Bayswater Exploration Et Production,LLC-Hester Farms II Tank Battery.A copy of this public notice
is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office.A public copy of
this notice is required by Colorado Air Quality Control Commission regulations.The notice must be
available for public inspection for a period of thirty(30)days from the beginning of the public notice
period.Please reference the public notice for instructions on submitting comments.
pF COlO\
4300 Cherry Creek Drive S.,Denver,CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe I �e Fro"
Jared Polls,Governor Jill Hunsaker Ryan,MPH,Executive Director its...,
*
1�ev i.rZty ex;.PLC—rill-O4),Fi LLD5( ,
"I271 f Z 3 17 W L J?I LH 1 CK 1 DD I D µ), 6 Co m) 2023-3396
It(Z��Z3
M,,.„ Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
C
S �
Comment
Website Title: Bayswater Exploration Et Production,LLC-Hester Farms II Tank Battery-Weld County
Notice Period Begins: November 20,2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Bayswater Exploration Et Production,LLC
Facility: Hester Farms II Tank Battery
Well Production Facility
SWNW quadrant of Section 31,Township 7N,Range 66W
Weld County
The proposed project or activity is as follows: Operator requested the initial construction permits for
condensate and produced water storage tanks,condensate and produced water loadouts,and gas venting
from vapor recovery tower and low-pressure separator(s)with new throughputs and permit limits.This
project is conversion from Facility Wide General Permit(GP10)to individual construction permits.This
facility will be considered new synthetic minor of VOC by NANSR through this project after reclassification
on 11/07/2022.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No.3,Part B,Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application,the Division's analysis,and a draft of Construction Permit 22WE0142 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices.This page also
includes guidance for public participation
• Send an email to cdphe_apcd_airpermitcomments@state.co.us
• Send written comments to our mailing address:
Air Pollution Control Division-Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South,APCD-SS-B1
Denver,Colorado 80246-1530
COLORADO
2.02 1 I ' Heae y Ex nenc
NOTE:Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public.Your comments and the division's responses are not considered confidential and will
be publicly accessible,including your name and any other personal information you provide in your
comments.
COLORADO
2.02 2 I a`°'" Hedl b Exvl 4xmbext
Hello