HomeMy WebLinkAbout20232098.tiff•
COLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
1150O St
PO Box 758
Greeley, CO 80632
July 20, 2023
To Whom it May Concern:
RECEIVED
JUL 2 0 2023
WELD COUNTY
^OMMISSIONERS
On July 20, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Crestone Peak Resources Operating, LLC - Frederiksen 28H. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe I
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
11.1,)l Imo- evItAtA)e,e;FLtri'lML (�D51 LI-))
W I 7-07.3 CEl ch+ I CA I Di) I A Lt.) DG (,3M -l)
riI Zl IZ3
M!^�M
44.4.40
Notice of a Proposed Project or Activity Warranting Public
-
Comment
Air Pollution Control Division
Website Title: Crestone Peak Resources Operating, LLC - Frederiksen 28H - Weld County
Notice Period Begins: July 20, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Crestone Peak Resources Operating, LLC
Facility: Frederiksen 28H
Well Production Facility
NENE quadrant of Section 28, Township 3N, Range 68W
Weld County
The proposed project or activity is as follows: Operator requested the initial construction permit for gas
venting from low-pressure separator with requested throughput and permit limits. Permit 22WE0003 will
cover this gas venting. This project includes condensate tanks general permit (GP01) and two compression
engines' cancellation. This facility will be considered new synthetic minor of VOC by NANSR through this
project after reclassification on 11/07/2022.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 22WE0003 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 1 I a
COLORADO
Depsrtmenc o[ Public
Health 617,. ame .
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02 2 I a
COLORADO
Department of Public
Health 6 Environment
Hello