Loading...
HomeMy WebLinkAbout20230417.tiffa ,Y M CDPHE COLORADO Department of Public Health & Environment Weld County - Clerk to the Board 1150OSt PO Box 758 Greeley, CO 80632 January 31, 2023 To Whom it May Concern: RECEIVED JAN 31 2023 WELD COUNTY COMMISSIONERS On January 31, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for Bonanza Creek Energy Operating Company, LLC - Mustang U-22 Production Facility . A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director PQbt ►c Rev; ec,i 02/13/23 cc'. pL (TP/MN), I-IL(PS), 06(31.0 P,1(cM/ERIcK/DD/Dw) 02 /og/23 2023-0417 Air Pollution Control Division g44Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Bonanza Creek Energy Operating Company, LLC - Mustang U-22 Production Facility - Weld County Notice Period Begins: January 31, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Bonanza Creek Energy Operating Company, LLC Facility: Mustang U-22 Production Facility Well Production Facility NENE quadrant of Section 4N, Township 22, Range 63W Weld County The proposed project or activity is as follows: The applicant proposes modification of point 002 condensate storage tanks to increase throughput, 003 produced water storage tanks to decrease throughput, cancels point 004 separator venting, modifies point 005 condensate loadout to increase throughput. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 18WE0824 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.Qov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe apcd_airpermitcomments@state.co.us Send comments to our mailing address: Abigail Weeks Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 1AINCOLORADO VI=7:47= NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 2 1 ICHOLORAD? D::11,1 ntofrth ealth 6 EnMt+onent Hello