Loading...
HomeMy WebLinkAbout20232808.tiffCOLORADO Department of Public Health & Environment Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 September 22, 2023 To Whom it May Concern: RECEIVED SEP 21 2023 WELD COUNTY COMMISSIONERS On September 22, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Merrit 9 Sec. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe �� bl 1 Ci Re ik ctJ Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director i0/061113 '02/. P CPI Pi 11/40 I L Ds ( L-�-) > PLO CE --R1 og12_I2a 2023-2808 Air Pollution Control Division a M M!^• a"M 40 � is � Notice of a Proposed Project or Activity Warranting Public Comment Website Title: PDC Energy, Inc. - Merrit 9 Sec - Weld County Notice Period Begins: September 22, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Merrit 9 Sec Well Production Facility NENW Section 9, Township 6N, Range 66W Weld County The proposed project or activity is as follows: The applicant is proposing to convert the condensate storage tanks currently permitted under a GP01 to a traditional construction permit. Emissions were calculated using previously approved site specific emission factors. This permit modification reflects a decrease in throughputs which directly correlates to a decrease in emissions. This is an existing well production facility located in the severe ozone nonattainment area. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 23WE0211 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe apcd airpermitcomments@state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 gcoLoRADo Department of Public 2,02 1 � Health6Eavlronment NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 21* COLORADO Deputmento[Public Health 6 EaW fat Hello