To Whom it May Concern:
RECEIVED
DEC 2 9 2022
WELD COUNTY
COMMISSIONERS
On December 29, 2022, the Air Pollution Control Division will begin a 30 -day public notice period for
PDC Energy, Inc. - Pikes-Suden Sec 34 Pad. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
Pvb1;G Re,/;et„)
01/16/23
CC; PL(Tr/MN),NL(DS)O&(SM),
P W (CH/ER/cK/Db/DN)
o t /l0/?3
2023-0095
„... ,
is.,..,,_,,i,Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: PDC Energy, Inc. - Pikes-Suden Sec 34 Pad - Weld County
Notice Period Begins: December 29, 2022
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc.
Facility: Pikes-Suden Sec 34 Pad
Well Production Facility
NENE Sec 34 T5N R64W
Weld County
The proposed project or activity is as follows: The applicant is requesting coverage for fixed -roof
condensate storage tanks previously permitted under a GP01. The application submitted reflects emissions
control practices; addition of VRU and enclosed combustion device(s). Increasing throughput due to addition
of contributing wells. This is a modification to an existing facility located in the 8 hour ozone control area.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 22WE0035 are available
on the Division's website at https://www.colorado.Qov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd airpermitcomments®state.co.us
Send comments to our mailing address:
Lacey Langman
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02
goo ICOLORAD.O
nepuunent of Public
1 Hexlsh b Envkp=,
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.