Loading...
HomeMy WebLinkAbout20233443.tiff RESOLUTION RE: APPROVE SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR23-0027, FOR A SOLAR ENERGY FACILITY (SEF) OUTSIDE OF SUBDIVISIONS AND HISTORIC TOWNSITES IN THE A(AGRICULTURAL)ZONE DISTRICT-PHYLLIS BURKGREN,C/O USS SOUTH PLATTE SOLAR,LLC WHEREAS,the Board of County Commissioners of Weld County,Colorado,pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County,Colorado,and WHEREAS,the Board of County Commissioners held a public hearing on the 6th day of December,2023,at the hour of 10:00 a.m.,in the Chambers of the Board,for the purpose of hearing the application of Phyllis Burkgren,1890 South Marshall Circle,Lakewood,Colorado 80232,c/o USS South Platte Solar,LLC,100 N 6th Street,Suite 410B,Minneapolis,Minnesota 55403,for a Site Specific Development Plan and Use by Special Review Permit,USR23-0027, for a Solar Energy Facility (SEF) outside of subdivisions and historic townsites in the A(Agricultural)Zone District, on the following described real estate, being more particularly described as follows: W1/2 SE1/4 of Section 36, Township 5 North, Range 66 West of the 6th P.M., Weld County, Colorado WHEREAS,at said hearing,the applicant was represented by Nicole Affleck,US Solar, 100 N 6th Street,Suite 410B,Minneapolis,Minnesota 55403,and WHEREAS,Section 23-2-230 of the Weld County Code provides standards for review of said Use by Special Review Permit,and WHEREAS, the Board of County Commissioners heard all of the testimony and statements of those present,studied the request of the applicant and the recommendation of the Weld County Planning Commission and all of the exhibits and evidence presented in this matter and,having been fully informed,finds that this request shall be approved for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. The applicant has demonstrated that the request is in conformance with Section 23-2-230.B of the Weld County Code as follows: A. Section 23-2-230.B.1—The proposed use is consistent with Chapter 22 [Weld County Comprehensive Plan] and any other applicable Code provisions or ordinance in effect. 1) Section 22-2-10.C states: "Promoting Economic Growth and Stability. Land use policies have a significant impact economic conditions in the County and should be structured to encourage economic prosperity. To ensure the continued strength of Weld County's economy,land use processes and decisions based on this ec PL(ER/NW/OA/Kw/DA),CA(Kat),RSR(SG), 2023-3443 APPL.,RPM,.REP. PL2892 i/.2.4/24 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,C/O USS SOUTH PLATTE SOLAR,LLC PAGE 2 plan [Comprehensive Plan] shall be consistent and promote financially responsible growth."This Solar Energy Facility(SEF)will provide construction jobs,initially,and energy generation to Weld County,both of which directly support economic prosperity.This SEF,being a power-generating facility,will add variety,stability, and redundancy to the existing electrical grid.Traditional energy resources are tied to commodity markets and can vary in demand and output.This facility can complement and support the economy during times of fluctuating oil and gas activity. 2) Section 22-2-30.C states: "Harmonize development with surrounding land uses."The adjacent land will experience minimal nuisance from the SEF,which is an unmanned energy development facility.There are no residences less than 500 feet from the facility. B. Section 23-2-230.B.2—The proposed use is consistent with the intent of the A(Agricultural)Zone District. 1) Section 23-3-10— Intent, states: "Agriculture in the County is considered a valuable resource, which must be protected from adverse impacts resulting from uncontrolled and undirected business,industrial and residential land uses.The A(Agricultural) Zone District is established to maintain and promote agriculture as an essential feature of the County.The A(Agricultural)Zone District is intended to provide areas for the conduct of agricultural activities and activities related to agriculture and agricultural production,and for areas for natural resource extraction and energy development, without the interference of other,incompatible land uses."Once the proposed SEF is operational, residents, businesses, and public entities within Xcel Energy's service territory will have the ability to subscribe to the proposed SEF and save five(5%)to ten(10%) percent on their monthly electric utility bills. 2) Section 23-3-40.FF—Uses by Special Review,of the Weld County Code include, "Solar Energy Facilities(SEFs),being more than five(5)acres in size,but less than 160 acres,in the Near/Urban Area, as shown on Appendix 21-B, or being more than five(5) acres,but less than 320 acres in the Agricultural/Rural Area,as shown on Appendix 21-B."This Code Section allows the applicant to apply for the subject Solar Energy Facility,being located in the Near/Urban Area, as shown by map, in Appendix 21-B. Per Section 23-1-90 of the Weld County Code,a"Solar Energy Facility" means:"a commercial facility whose primary purpose is to supply electricity and consists of one or more solar arrays and other accessory structures, equipment, including substations, switchyards,battery storage,electrical infrastructure,generators, transmission lines, communications infrastructure, and other 2023-3443 PL2892 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,CIO USS SOUTH PLATTE SOLAR,LLC PAGE 3 appurtenant structures and/or facilities."The SEF will encumber approximately 19 acres and qualifies as a SEF USR.This SEF will include three (3) conex (cargo) containers during construction. These cargo containers shall be removed from the site during operations or shall be reduced to two (2), since two(2)cargo containers are allowed as an Accessory Use,per Section 23-3-30.B of the Weld County Code. C. Section 23-2-230.B.3—The uses which will be permitted will be compatible with the existing surrounding land uses.There are eight(8)A(Agricultural) Zoned properties that surround this site.Because the SEF is located on the south side of the property there are no residences less than 500 feet from the proposed facility.The surrounding land uses are primarily agricultural. There are eight(8)USRs within one(1)mile of the site:USR-1053,for seed production;SUP-446,for a 20-dog kennel;USR-600,for a natural gas facility; USR-848, for a storage facility; SUP-131, for a gravel pit; 3rd Amended USR-597,for a natural gas processing facility;USR-1163, for a storage and parking of oilfield equipment; and USR13-0012,for agricultural services. The Godfrey Ditch runs east/west through the subject site and the SEF will be located south of the ditch.USS South Platte Solar,LLC,has been in contact the Godfrey Ditch representative,Daniel Gallen,Water Resources Specialist at Aurora Water.Mr.Gallen is aware the SEF and of USS South Platte Solar,LLC's,need to cross the ditch.USS South Platte Solar,LLC, will eventually,likely,need to execute a Crossing Agreement with Godfrey Ditch.Per the application materials,Mr.Gallen does not anticipate any issues between the proposed SEF and the ditch owners but stated that U.S.Solar should avoid significant grading so sediment will not blow into the ditch.USS South Platte Solar,LLC,does not plan on conducting any significant grading on the parcel.Mr.Gallen stated that any access-path improvements would need to be brought to the ditch owners;however,USS South Platte Solar, LLC, does not anticipate any major access-path improvements, and plan on utilizing the existing eastern gravel access path.The Godfrey Ditch did not return any referral agency comments. An Approved Jurisdictional Determination(AJD)(NWO-2022-01095-DEN) from the U.S.Army Corps of Engineers,dated December 20,2022,was provided stating all features on the site(except for Godfrey Ditch)are not Waters of the United States(WOTUS),and,therefore,do not require a permit for the discharge of dredged or fill material.The site is also in a floodplain. Weld County Department of Planning Services staff sent notice to seven(7)surrounding property owners within 500 feet of the proposed 2023-3443 PL2892 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,C/O USS SOUTH PLATTE SOLAR,LLC PAGE 4 USR boundary. No written correspondence or telephone calls were received. The proposed use is in an area that can support this development and the Conditions of Approval and Development Standards will assist in mitigating the impacts of the facility on the adjacent properties and ensure compatibility with surrounding land uses and the region. D. Section 23-2-230.B.4—That the uses which will be permitted will be compatible with future development of the surrounding area,as permitted by the existing zoning,and with the future development,as projected by Chapter 22 of this Code or master plans of affected municipalities.The site is located within the Coordinated Planning Agreement Area(CPA)for the City of Evans and the Town of LaSalle.As part of the pre-application process the municipalities were sent a Notice of Inquiry(NOI).The City of Evans submitted a Notice of Inquiry,dated May 26,2023,that stated no concerns and that they did not wish to annex.According to the City of Evans'Community Master Plan(2022)and corresponding Future Land Use Map the site is located outside the City of Evans' Urban Growth Boundary. The Town of LaSalle submitted a Notice of Inquiry,dated June 6,2023, stating that they do wish to annex when the property is eligible. The Comprehensive Plan Map for the Town of LaSalle shows the site within the primary and secondary growth boundaries and 100-year floodplain. The site is located within the three(3)mile referral area of the Cities of Greeley and Evans and the Towns of LaSalle and Garden City.The City of Evans and the Town of Garden City did not submit referral agency comments.The City of Greeley submitted referral agency comments,dated July 6,2023,stating that they have no concerns. The Town of LaSalle submitted referral agency comments dated July 21, 2023,that included comments regarding a Floodplain Development Permit, annexation of the property,travel routes,weeds,water runoff/erosion,and a possible Road Maintenance Agreement with the Town of LaSalle.The applicant provided an email, dated October 4, 2023, that stated a discussion was held with the Town of LaSalle and that US Solar is agreeable to the conditions suggested by the Town of LaSalle. E. Section 23-2-230.B.5—The property is not located within any overlay district officially adopted by the County,including A-P(Airport)Overlay District, 1-25 Overlay District, Geologic Hazard Overlay District, MS4-Municipal Separate Storm Sewer System area,Historic Townsites Overlay District, Agricultural Heritage Overlay District, or part of a Disproportionally Impacted Community.The property is located within a Special Flood Hazard Area. Building Permits issued on the lot will be 2023-3443 PL2892 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,CIO USS SOUTH PLATTE SOLAR,LLC PAGE 5 required to adhere to the fee structure of the County-Wide Road Impact Fee,County Facility Fee,and Drainage Impact Fee Programs. F. Section 23-2-230.B.6—The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use.The proposed facility is located on approximately 20 acres of soils designated as "Prime Farmland if drained and either protected from flooding or not frequently flooded during the growing season,"Aquolls and Aquents, and gravelly substratum, per the USDA Natural Resources Conservation Service(NRCS)Custom Soil Report.The proposed use of the property for an SEF will not remove topsoil from the property.After the life of the SEF the land may be returned to historic uses.A letter submitted by USS South Platte Solar,LLC,stated,historically,the property has been used for farming row crops like corn,wheat,soybeans,etc.,and in 2023, the landowner teamed up with Petrocco Farms to plant vegetables on the parcel.The SEF will encompass approximately 19.7 acres of the 43 acres, which allows the remaining 23.3 acres to continue to be utilized as cropland.Additionally, a majority of the 19.7 acres within USS South Platte's fenced area will be transformed into a diverse mix of pollinator-friendly, low-lying,deep-rooted grasses,which will be planted underneath the modules and between the rows.The general intention of this pollinator-friendly habitat is to reduce stormwater runoff and increase crop yields of any neighboring farmland.The pollinator-friendly habitat is intended to enhance the local wildlife, such as bumblebees, monarch butterflies,and more.This site will also involve agrivoltaics in the form of beekeeping.A community beekeeper is invited to use the site as an apiary. While the solar panels generate electricity from the sun,bees make honey and pollinate the habitat planted underneath and in-between the rows of solar panels. G. Section 23-2-230.B.7—There are adequate provisions for the protection of the health,safety,and welfare of the inhabitants of the neighborhood and County. This proposal has been reviewed by the appropriate referral agencies and it has been determined that the attached Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and county and will address and mitigate impacts on the surrounding area with the operation of this facility. NOW,THEREFORE,BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that the application of Phyllis Burkgren,c/o USS South Platte Solar,LLC,for a Site Specific Development Plan and Use by Special Review Permit,USR23-0027,for a Solar Energy Facility(SEF)outside of subdivisions and historic townsites in the A(Agricultural)Zone District,on the parcel of land described above,be,and hereby is,granted subject to the following conditions: 2023-3443 PL2892 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,C/O USS SOUTH PLATTE SOLAR,LLC PAGE 6 1. Prior to recording the map: A. A Road Maintenance Agreement(Construction)is required at this location. Road maintenance includes,but is not limited to,dust control and damage repair to specified haul routes during construction. B. The applicant shall comply with the referral comments from Colorado Parks and Wildlife,dated August 4,2023.Evidence of such shall be submitted,in writing,to the Weld County Department of Planning Services. C. The applicant shall submit an executed Crossing Agreement from Godfrey Ditch. D. The applicant shall address the Notice of Inquiry comments from the Town of LaSalle,dated July 21,2023.Evidence of such shall be submitted,in writing,to the Department of Planning Services. E. The applicant shall acknowledge the advisory referral comments from the Weld County Oil and Gas Energy Department, dated June 29, 2023. Evidence of such shall be submitted, in writing, to the Weld County Department of Planning Services. F. The applicant shall submit the Interconnection Agreement. G. The map shall be amended to delineate the following: 1) All sheets of the map shall be labeled USR23-0027. 2) The attached Development Standards. 3) The map shall be prepared, per Section 23-2-260.D and Section 23-4-1030 of the Weld County Code. 4) The applicant shall show and label the required setbacks, in accordance with Section 23-4-1030.C.3 of the Weld County Code. 5) The applicant shall show and label any existing and proposed solar facility installations and electrical equipment, power lines, structures,temporary work trailers,storage containers(limited to two[2],per Section 23-3-30.B of the Weld County Code),storage areas and miscellaneous improvements, as applicable. Clearly indicate which items are temporary for use during construction and which items are permanent. 6) The applicant shall show and label the required fencing,gates and any emergency and site identification signage,in accordance with Section 23-2-240.A.12 and Section 23-4-1030.C.6 of the Weld 2023-3443 PL2892 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,C/O USS SOUTH PLATTE SOLAR,LLC PAGE 7 County Code.Include fence and sign specification details on the map.Refer to the Weld County Sign Code,as amended. 7) The applicant shall show and label any on-site lighting,if applicable. All lighting shall be downcast and shielded so that light rays will not shine directly onto adjacent properties.Include lighting specification details on the USR map.Refer to Section 23-2-250.D of the Weld County Code for design criteria. 8) The applicant shall show and label the location of the trash collection areas,if applicable.Include specification details on the USR map.Refer to Section 23-2-240.A.13 of the Weld County Code for design criteria. 9) The applicant shall show and label any planned oil and gas surface development areas,corridors,access roadways,etc.as part of any executed Surface Use Agreement. 10) The applicant shall show and label all recorded easements and rights-of-way on the map by book and page number or Reception number and recording date. 11) County Road 394 is a paved road and is designated on the Weld County Functional Classification Map as a collector road,which requires 80 feet of right-of-way at full buildout.The applicant shall delineate and label the future and existing right-of-way(along with the documents creating the existing right-of-way)and the physical location of the road on the site map.All setbacks shall be measured from the edge of the right-of-way.This road is maintained by Weld County. 12) The applicant shall show and label an approvable access point onto County Road 394 and the usage type(s)(Agriculture,Residential, Commercial/Industrial,or Oil and Gas).Development Review will review the access location as a part of the plan submittal.The applicant must obtain an Access Permit in the approved location, prior to construction. 13) The applicant shall show and label the drainage flow arrows. 14) The applicant shall show the floodplain and floodway(if applicable) boundaries on the map.Label the floodplain boundaries with the FEMA Flood Zone and FEMA Map Panel Number or appropriate study. 2. Upon completion of Condition of Approval#1 above,the applicant shall submit one(1)electronic copy(.pdf)of the map for preliminary approval to the Weld 2023-3443 PL2892 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,C/O USS SOUTH PLATTE SOLAR,LLC PAGE 8 County Department of Planning Services.Upon approval of the map the applicant shall submit a Mylar map along with all other documentation required as Conditions of Approval.The Mylar map shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services.The map shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code.The Mylar map and additional requirements shall be submitted within 120 days from the date of the Board of County Commissioners Resolution. The applicant shall be responsible for paying the recording fee. 3. In accordance with Appendix 5-J of the Weld County Code,should the map not be recorded within the specified timeline from the date the administrative review was signed,a$50.00 recording continuance fee shall be added for each additional three(3)-month period. 4. The Use by Special Review is not perfected until the Conditions of Approval are completed and the map is recorded.Activity shall not occur,nor shall any Building or Electrical Permits be issued on the property,until the Use by Special Review map is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement. 5. Prior to Construction: A. The applicant shall submit an irrevocable standby letter of credit,bond,or alternate form of security in an amount sufficient to fund the estimated decommissioning/reclamation costs,required by Section 23-4-1030.B.4 of the Weld County Code,for acceptance and approval by the Weld County Board of County Commissioners.Once approved,the Decommissioning and Reclamation Plan shall be updated to include the approved security information. B. The approved tracking control shall be constructed prior to on-site construction. C. An Access Permit shall be obtained prior to on-site construction. D. If more than one(1)acre is to be disturbed,a Weld County Grading Permit will be required. E. If there is any disturbance/construction in the floodplain a Floodplain Development Permit is required. 6. Prior to Operation: A. The site shall not contain more than two(2)cargo containers. 2023-3443 PL2892 SPECIAL REVIEW PERMIT(USR23-0027)-PHYLLIS BURKGREN,C/O USS SOUTH PLATTE SOLAR,LLC PAGE 9 The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 6th day of December,A.D.,2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY,COLORADO � c 3 ATTEST: .. RA.J �Y y e� �"� � Mike man,Chair Weld County Clerk to the Board Bk.")Bk.")Shir44. Perry L.B ,Pro-Tem Deputy Clerk to the Board . 1� co K.James APP ED A. •F . 11,61 r O e n D.Ross ounty A orney, �.� .. 12C V17,3 .�►ori Saine Date of signature: 2023-3443 PL2892 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS PHYLLIS BURKGREN, C/O USS SOUTH PLATTE SOLAR,LLC USR23-0027 1. Site Specific Development Plan and Use by Special Review Permit,USR23-0027,is for a Solar Energy Facility (SEF) outside of subdivisions and historic townsites in the A(Agricultural)Zone District,subject to the Development Standards stated hereon. 2. Approval of this plan may create a vested property right,pursuant to Section 23-8-10 of the Weld County Code. 3. The Use by Special Review Permit shall be valid for three(3)years from the date of approval. If the site is not selected for being a participant in any community solar program the permit shall expire on the anniversary date of Board of County Commissioners approval. 4. Any future structures or uses onsite must obtain the appropriate Zoning and Building Permits. 5. The facility is unmanned and will operate year-round, according to the application materials.Limited maintenance personnel may visit the site,once operational. 6. Height limitation.Ground-mounted solar collectors shall not exceed twenty-five(25)feet in height,measured from the highest grade below each solar panel,to the highest extent of the solar panel rotation, per Section 23-4-1030.C.1 of the Weld County Code,as amended. 7. Glare.A SEF shall be designed,located,or placed so that concentrated solar glare from its solar collectors will not be directed toward,or onto,nearby properties or roadways,at any time of the day,per Section 23-4-1030.C.2 of the Weld County Code,as amended. 8. Setbacks.The Improved Area of the SEF shall conform to the setback requirements of the underlying zone.Additionally,the improved area must be at least 500 feet from existing residential buildings and residential lots of a platted subdivision or planned unit development. The residential setback requirement may be reduced if appropriate screening through landscape or an opaque fence is installed,or upon submittal to Weld County of a waiver or informed consent,signed by the residence owner,agreeing to the lesser setback.If landscaping or opaque fencing is substituted for setback,a Landscaping Plan or Fencing Plan shall first be submitted to and approved by the Department of Planning Services,per Section 23-4-1030.C.3 of the Weld County Code,as amended. 9. Dust mitigation.The operators of the SEF shall continuously employ the practices for control of fugitive dust, as detailed in their accepted Dust Mitigation Plan, per Section 23 4-1030.C.4 of the Weld County Code,as amended. 10. Underground cables.All electrical cables on the improved area shall be buried,except for direct current string wires that connect between solar collectors, and direct current 2023-3443 PL2892 DEVELOPMENT STANDARDS (USR-0027) - PHYLLIS BURKGREN, C/O USS SOUTH PLATTE SOLAR,LLC PAGE 2 collection circuits between rows of solar arrays that are no more than four(4)feet above grade crossings,substations,switchyards,and circuit voltages greater than 34.5 kilovolts, where necessary,per Section 23-4-1030.C.5 of the Weld County Code,as amended. 11. Fencing.The SEF shall be enclosed with a security fence,as approved,pursuant to the Fencing Plan shown heron.Appropriate signage shall be placed upon such fencing that warns the public of the high voltage therein,per Section 23-4-1030.C.6 of the Weld County Code.All signs shall adhere to the adopted Weld County Sign Code,as amended. 12. Stormwater management.The Operator of the SEF shall comply with the approved Final Drainage Report and the required Storm Drainage Criteria, pursuant to Chapter 8, Article XI of this Code.Ground-mounted solar collector systems shall be exempt from impervious surface calculations if the soil under the collectors is designated hydrologic A or B soil groups, by the Natural Resources Conservation Service (NRCS), per Section 23-4-1030.C.7 of the Weld County Code,as amended. 13. Access Permit.Prior to construction of the SEF the applicant shall apply for,and obtain, an approved Access Permit from the Weld County Department of Planning,pursuant to the provisions of Chapter 8, Article XIV of the Weld County Code, per Section 23-4-1030.C.8 of the Weld County Code,as amended. 14. Existing irrigation systems.The nature and location or expansion of the SEF must not unreasonably interfere with any irrigation systems,on,or adjacent to,the solar facility,per Section 23-4-1030.C.9 of the Weld County Code,as amended. 15. Decommissioning. The site shall adhere to the accepted Decommissioning and Reclamation Plan.Weld County shall have the right to draw upon the irrevocable standby letter of credit,or other form of financial security,to pay for decommissioning in the event that the holder has not commenced decommissioning/reclamation activities within 90 days of the Board of County Commissioners'order or Resolution directing decommissioning and reclamation. 16. The site shall be maintained in accordance with the accepted Property Maintenance Plan. 17. The site shall be maintained in accordance with the accepted Lighting Plan. 18. All signs shall adhere to Chapter 23,Article IV,Division 2 of the Weld County Code. 19. Landscaped areas shall be maintained by the owner/tenant of the property,including landscaped areas within the adjacent right-of-way.Maintenance shall include,but not be limited to,irrigating,mowing,pruning,removal of trash and weeds,and any required plantings that become diseased,infested or otherwise unhealthy,shall be replaced within the growing season,or next calendar year,whichever occurs sooner. 20. The property owner or operator shall be responsible for controlling noxious weeds on the site,pursuant to Chapter 15,Articles I and II,of the Weld County Code. 2023-3443 PL2892 DEVELOPMENT STANDARDS (USR-0027) - PHYLLIS BURKGREN, CIO USS SOUTH PLATTE SOLAR,LLC PAGE 3 21. The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off-site tracking. 22. Any work that may occupy and/or encroach upon any County rights-of-way or easement shall require an approved Right-of-Way Use Permit,prior to commencement. 23. The property owner shall comply with all requirements provided in the executed Road Maintenance Agreement. 24. Prior to the release of Building Permits, the applicant shall be required to submit a complete access application for a"preliminarily approved"access location as shown on this plan. 25. The historical flow patterns and runoff amounts on the site will be maintained. 26. Weld County is not responsible for the maintenance of on-site drainage related features. 27. During construction,all liquid and solid wastes(as defined in the Solid Wastes Disposal Sites and Facilities Act, C.R.S. §30-20-100.5)shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 28. During construction,no permanent disposal of wastes shall be permitted at this site.This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act,C.R.S.§30-20-100.5. 29. During construction,waste materials shall be handled, stored, and disposed of in a manner that controls fugitive dust,fugitive particulate emissions,blowing debris,and other potential nuisance conditions.The facility shall operate in accordance with Chapter 14, Article I of the Weld County Code. 30. Fugitive dust and fugitive particulate emissions shall be controlled throughout the duration of construction and operation of the facility. 31. During construction,adequate toilet facilities and handwashing units shall be provided. Portable toilets shall be serviced by a cleaner licensed in Weld County,contain hand sanitizers,be screened from public view,and removed when construction is completed. 32. The facility shall comply with the Air Pollution Emission Notice (A.P.E.N.) permit requirements as stipulated by the Air Pollution Control Division of the Colorado Department of Public Health and Environment,as applicable. 33. The facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone,as delineated in C.R.S.§25-12-103. 34. The operation shall comply with all applicable rules and regulations of state and federal agencies and the Weld County Code. 2023-3443 PL2892 DEVELOPMENT STANDARDS (USR-0027) - PHYLLIS BURKGREN, C/O USS SOUTH PLATTE SOLAR,LLC PAGE 4 35. A Flood Hazard Development Permit is required for all construction or development occurring in the floodplain or floodway,as delineated on Federal Emergency Management Agency(FEMA)FIRM Community Panel Maps#08123C-1726F,dated September 17, 2020(South Platte River).Any development shall comply with all applicable Weld County requirements,Colorado Water Conservation Board requirements,as described in Rules and Regulations for Regulatory Floodplains in Colorado, and FEMA regulations and requirements,as described in 44 CFR parts 59,60,and 65.The FEMA definition of development is any man-made change to improved or unimproved real estate,including, but not limited to,buildings or other structures,mining,dredging,filling,grading,paving, excavation,drilling operations,or storage of equipment and materials. 36. FEMA's floodplain boundaries may be updated at any time by FEMA.Prior to the start of any development activities,the owner should contact Weld County to determine if the floodplain boundaries have been modified. 37. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties in accordance with the plan.Neither the direct,nor reflected,light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets.No colored lights may be used,which may be confused with,or construed as, traffic control devices. 38. Building Permits may be required for any new construction,set up of manufactured structures,or change of use of existing buildings,per Section 29-3-10 of the Weld County Code.Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application.Currently,the following have been adopted by Weld County:2018 International Building Codes,2018 International Energy Code,2020 National Electrical Code,and Chapter 29 of the Weld County Code.A Building Permit application must be completed and two(2)complete sets of engineered plans,bearing the wet stamp of a Colorado registered architect or engineer,must be submitted for review. A Geotechnical Engineering Report,performed by a Colorado registered engineer,or an Open Hole Inspection shall be required.A Building Permit must be issued prior to the start of construction. 39. Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Facility Fee,County-Wide Road Impact Fee,and Drainage Impact Fee Programs. 40. The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code. 41. All buildings shall comply with the setback from oil and gas wells,per Section 23-4-700, as amended. 42. Necessary personnel from the Weld County Departments of Planning Services,Public Works,and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply 2023-3443 PL2892 DEVELOPMENT STANDARDS (USR-0027) - PHYLLIS BURKGREN, C/O USS SOUTH PLATTE SOLAR,LLC PAGE 5 with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. 43. The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards,as shown or stated,shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted.Any other changes shall be filed in the office of the Department of Planning Services. 44. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 45. Construction or use pursuant to approval of a Use by Special Review Permit shall be commenced within three(3)years from the date of approval,unless otherwise specified by the Board of County Commissioners when issuing the original Permit,or the Permit shall be vacated.The Director of the Department of Planning Services may grant an extension of time,for good cause shown,upon a written request by the landowner. 46. A Use by Special Review shall terminate when the use is discontinued for a period of three (3)consecutive years,the use of the land changes or the time period established by the Board of County Commissioners through the approval process expires.The landowner may notify the Department of Planning Services of a termination of the use,or Planning Services staff may observe that the use has been terminated.When either the Department of Planning Services is notified by the landowner,or when the Department of Planning Services observes that the use may have been terminated,the Planner shall send certified written notice to the landowner asking that the landowner request to vacate the Use by Special Review Permit. 47. In such cases where the Use by Special Review has terminated but the landowner does not agree to request to vacate the Use by Special Review Permit,a hearing shall be scheduled with the Board of County Commissioners to provide the landowner an opportunity to request that the Use by Special Review Permit not be vacated,for good cause shown.The landowner shall be notified at least ten(10)days prior to the hearing. If the Board of County Commissioners determines that the Use by Special Review has terminated and no good cause has been shown for continuing the permit,then the termination becomes final,and the Use by Special Review Permit is vacated. 48. RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT:Weld County has some of the most abundant mineral resources,including,but not limited to,sand and gravel,oil, natural gas,and coal.Under Title 34 of the Colorado Revised Statutes,minerals are vital resources because(a)the state's commercial mineral deposits are essential to the state's economy;(b)the populous counties of the state face a critical shortage of such deposits; and(c)such deposits should be extracted according to a rational plan,calculated to avoid 2023-3443 PL2892 DEVELOPMENT STANDARDS (USR-0027) - PHYLLIS BURKGREN, C/O USS SOUTH PLATTE SOLAR,LLC PAGE 6 waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state.Mineral resource locations are widespread throughout the County and people moving into these areas must recognize the various impacts associated with this development.Oftentimes, mineral resource sites are fixed to their geographical and geophysical locations.Moreover,these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource. 49. The Weld County Right to Farm Statement,as it appears in Section 22-2-30.A.4.a of the Weld County Code,shall be placed on the map and recognized at all times. 2023-3443 PL2892 Hello