HomeMy WebLinkAbout20232692.tiffCOLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
1150O St
PO Box 758
Greeley, CO 80632
September 20, 2023
To Whom it May Concern:
RECEIVED
SEP 2 0 2023
:LO COUNTY
)MM?SSIONERS
On September 20, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Noble Energy, Inc. - STORIS E24 It MACKINAW A19 ECONODE T6N-R65W-S24 L01. A copy of this public
notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe I
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, ExecutiveDirector
Gc h i C� N'e 0 ; _C et". 71- (T -PI kA ILL), L Cbs i 1�->
i0Jo4/z3 (cziCNIGGii IADM),()GPM)
0q1 2.-11Z-3
Z0 Z3-ZIAZ
a
Air Pollution Control Division
o �Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: Noble Energy, Inc. - STORIS E24 Et MACKINAW A19 ECONODE T6N-R65W-S24 L01 - Weld County
Notice Period Begins: September 20, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Noble Energy, Inc.
Facility: STORIS E24 Et MACKINAW A19 ECONODE T6N-R65W-S24 L01
Well Production Facility
NESW quadrant of Section 24, Township 6N, Range 65W
Weld County
The proposed project or activity is as follows: Operator requested the facility wide construction permit
modification (15WE0181) for gas venting from separators and vapor recovery tower, condensate storage
tanks and loadout with new throughputs and permit limit. This facility will be considered new synthetic
minor of VOC by NANSR through this project after reclassification on 11/07/2022.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 15WE0181 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd_airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil & Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02 1 I a
COLORADO
Department et Publle
Health 6 EnvlrOnment
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
2xC
COLORADO
11 nepareme�x oe Pubua
6 Eavlronsne tt
Hello