Loading...
HomeMy WebLinkAbout20230830.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROAD 94 BETWEEN COUNTY ROADS 39 AND 41 FOR APPROXIMATELY FIVE (5) DAYS, FOR CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions exist which make it necessary to temporarily close County Road 94, between County Roads 39 and 41, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective March 27, 2023, for approximately five (5) days for a culvert replacement. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 94, between County Roads 39 and 41, be temporarily closed, with said closure being effective March 27, 2023, for approximately five (5) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. CC: So(Rs) D;spotc►,, CSP 03/30/23 2023-0830 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 94 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 22nd day of March, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: d21 G jC,lto;,. Weld County Clerk to the Board County A torney Date of signature: 03/30/,23 (rN-cz Mike man, Chair 63,64 Perry L. Buc Pro-Tem 2023-0830 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 20, 2023 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to close Weld County Road 94 between Weld County Road 39 and Weld County Road 41 beginning 3/27/23 thru 3/31/23 for culvert replacement. See attached closure diagram. 2023-0830 63/22 E6 6011 www.invarion.com W20 -1F ...a.s.a sass ii a••• .a."4 M4-10 W20-3 a Ii iliMil+ancuaa M4-9 111TrIf •W ►r•l7rrr• 77ITTr f7rrrrr• 77 W20 -1F 0t 0 w o J W20-1Fi Innla N14-10 anol30 M4-9 INJIT -41-11-i:•i-f-0.F►•ai. Ff.•.•••ay..iiai-ice••• mow.►•sflan. at. •• M4-9 0 c I M4-9 W20-3 W20 -1F PROJECT #AN -59 Arne:143396 ROAD CLOSURE DESCRIPTION WCR 94 between WCR 39 and WCR 41 closed 3/27/2023 thru 3/31/2023 for culvert replacement NOTICE TO PUBLIC Road signs and barricaded DETOUR ROUTE WCR 39 between WCR 94 and WCR 92 1 mile paved WCR 92 between WCR 39 and WCR 41 1 mile gravel WCR 41 between WCR 92 and WCR 94 1 mile gravel NOTES ADT of WCR is: 46/2008 Culvert replaced is irrigation: OLD 30" Round CMP NEW 30" CSPR Culvert is .5 east of WCR 39 on WCR 94 Prepared by: Ryan Reynolds 3/7/2023 Hello