HomeMy WebLinkAbout20230830.tiffRESOLUTION
RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING TEMPORARY
CLOSURE OF COUNTY ROAD 94 BETWEEN COUNTY ROADS 39 AND 41 FOR
APPROXIMATELY FIVE (5) DAYS, FOR CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, pursuant to said statute and upon the basis of traffic and personnel
investigations, the Board has determined that conditions exist which make it necessary to
temporarily close County Road 94, between County Roads 39 and 41, to through traffic and to
regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being
effective March 27, 2023, for approximately five (5) days for a culvert replacement.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 94, between County Roads 39 and 41,
be temporarily closed, with said closure being effective March 27, 2023, for approximately five (5)
days for a culvert replacement, and further, that standard official traffic control devices shall be
erected at said closure giving notice of the restrictions.
CC: So(Rs) D;spotc►,, CSP
03/30/23
2023-0830
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 94
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 22nd day of March, A.D., 2023.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: d21 G jC,lto;,.
Weld County Clerk to the Board
County A torney
Date of signature: 03/30/,23
(rN-cz
Mike man, Chair 63,64
Perry L. Buc Pro-Tem
2023-0830
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: March 20, 2023
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Weld County Public Works is requesting permission to close Weld County Road 94 between Weld
County Road 39 and Weld County Road 41 beginning 3/27/23 thru 3/31/23 for culvert replacement.
See attached closure diagram.
2023-0830
63/22
E6 6011
www.invarion.com
W20 -1F
...a.s.a sass ii a••• .a."4
M4-10
W20-3
a
Ii
iliMil+ancuaa
M4-9
111TrIf •W ►r•l7rrr• 77ITTr f7rrrrr• 77
W20 -1F
0t
0
w
o
J
W20-1Fi
Innla
N14-10
anol30
M4-9
INJIT
-41-11-i:•i-f-0.F►•ai. Ff.•.•••ay..iiai-ice••• mow.►•sflan. at. ••
M4-9
0
c I
M4-9
W20-3
W20 -1F
PROJECT #AN -59 Arne:143396
ROAD CLOSURE DESCRIPTION
WCR 94 between WCR 39 and WCR 41
closed 3/27/2023 thru 3/31/2023
for culvert replacement
NOTICE TO PUBLIC
Road signs and barricaded
DETOUR ROUTE
WCR 39 between WCR 94 and WCR 92 1 mile paved
WCR 92 between WCR 39 and WCR 41 1 mile gravel
WCR 41 between WCR 92 and WCR 94 1 mile gravel
NOTES
ADT of WCR is: 46/2008
Culvert replaced is irrigation: OLD 30" Round CMP
NEW 30" CSPR
Culvert is .5 east of WCR 39 on WCR 94
Prepared by: Ryan Reynolds
3/7/2023
Hello