Loading...
HomeMy WebLinkAbout20230150.tiff-14710��'�e Work Phone # %� #'S�Yio�ne Phone # lv�Ije1 ��A3 Address: / Sag V►�r� t'N/ 41 0/24 L''�. City/State/Zip Code . PLANNED UNIT DEVELOPMENT (PUD) CHANGE OF ZONE APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT # /AMOUNT # /$ CASE # ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: f1J'7 L33 _ I_ aoParcelNumber ot (12 digit number - found on Tax I.D. information, obtainable at the Weld County Assessor's Office, or www.co.weld.co.us) (Include all lots being included in the application area. If additional space is required, attach an additional sheet.) Pr s a iv I 3 - I (0" Legal Description L_ol 1> at 1 C' '2o' ection , Township N h, Range West Property Address (If Applicable) 4,1 Existing Zone District:Ajt?Cttktt4CkFroposed Zone District:C-416 Proposed #/Lots: Acres Open Space: �" ° Are you applying for Conceptual or Specific Guide? Conceptual FEE OWNER(S) OF THE PROPERTY (If additional space is required, attach an additional sheet.) Name: LisA.t1/�ILGN��✓4�� (3,2.'yJOUfJ t �'� th2Actiel Email Address L A t ff ) CO • g eaaa Total Acreage: Specific e edrnceeNT" Cr APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: s eso ;At 1+13 Z: V La Work Phone # Home Phone # Email Address Address: City/State/Zip Code UTILITIES: Water: LL Sewer: Gas: Electric: Procai ow -CS -cod Pow eiC Phone: Ovine Chotoa-.- DISTRICTS: School: Post: 13wkhi flejs C4tv1iof Pai24.c L u P s oat O1 %-h(4c_jis I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property, must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating the signatory has the legal authority to sign for the corporation. I (we), the undersigned, hereby request hearings before the Weld County Planning Commission and the Board of County Commissioners concerning the proposed Change of Zone for the a% e ve described unincorporated area of Weld County, Colorado: 44_ateph i, v-zz_ S gnature: Owner or A►�hcr' ed Agent Date Authorize + • . ent Date (k, 4- 4-Z2 ;°1143.- -zz 7 DEPARTMENTS OF PLANNING BUILDING, DEVELOPMENT REVIEW AND ENVIRONMENTAL HEALTH 1555 NORTH 17TH AVENUE GREELEY, CO 80631 AUTHORIZATION FORM LI sc. 4 6 g_tuueothu , itiu 45 /Ito yeuctill I, (We), WI 1,l- � C�-riZ , give permission to S (�-/'Y1 2, 614 (�� N'�',I�(Owner - pleae prirtt) (Authorized Agent/Applicant—please print) to apply for any Planning, Building, Access or OWTS permits on our behalf, for the property located at (address or parcel number) below: t71- 33- I - 00 - cii Legal Description: _AT Subdivision Name: Property Owners Information: of Section �, Township / N, Range (p (4O W • Address: [ &45-asse \Ij'tqiN24 OI2IUt Lot Block Phone: -1?-O , q2'r-zi E-mail: Z —N /53 e (.-o neiCvnte 1 . N FT • Authorized Agent/Applicant Contact Information: Address: siterme, tot& owNerzS Phone: E -Mail: Correspondence to be sent to: Owner na_ Authorized Agent/Applicant by: Mail n Email Additional Info: Owner Signature: Owner Signature: 9/10/21 (AJAX /1/47-1 IC -4111 Date: ‘)3 --- -6 as Date: ;A. 3- 3 52-Z" 9 The proposed Cluster PUD meets the standards of Section 27-10-20 of the Weld County Code as follows: A. If the Cluster PUD is proposed on agricultural lands, the land shall be currently used or capable of being used for agricultural production such as farming and ranching operations for the next forty (40) years from the date of final approval. The Cluster PUD is proposed on agricultural lands, which are currently used for agricultural production per the Weld County Assessor's Property Report valuation of land. Approval of the subject Cluster PUD would not impede this use. B. The Outlot shall be restricted to operations and be free from development for any other uses for a period of forty (40) years from the date of final approval. As part of step 2 of the PUD process, the PUD Change of Zone plat will include limitations on the uses that may occur on the Outlot. No commercial, industrial or residential uses shall occur on the Outlot. Agricultural uses will be restricted to operations only and no development may occur. This preserved land shall not be developed for at least forty (40) years from the date the PUD Final Plan is approved. C. A minimum of two-thirds of the total area of the tract must be reserved for the preservation of contiguous land. The property is approximately 122.5 acres in size. Two-thirds of this area is approximately 81.6 acres. The applicant is voluntarily exceeding this minimum reservation of 81.6 acres as the proposed Outlot is approximately 110 acres. D. The outlot may be used for all agricultural uses by right, as passive view corridors, recreation or the preservation of environmentally sensitive features such as wildlife habitat or critical areas. The Outlot will continue to be used for agricultural production including growing hay contains existing ditch infrastructure. It will also provide a passive view corridor to the six (6) small lots and the surrounding lands. E. Public access to the Outlot is not a requirement. The Outlot may be substituted for the common open space requirement used in the traditional Planned Unit Development application. Public access to the Outlot will be further discussed in the PUD Change of Zone and Final Plan applications. F. The intent of the A (Agricultural) Zone District as outlined in Chapter 23 and the Comprehensive Plan, Chapter 22 of this Code, including Weld County's Right to Farm, Appendix 22-E, shall be met. This PUD will not interfere with the surrounding A (Agricultural) zoned properties in unincorporated Weld County. The intent of the A Zone soundly applies to the proposed use of the Outlot. This PUD is in line with the goals of the Weld County Comprehensive Plan and is supported by the Weld County Right to Farm Statement. G. A Cluster PUD may be used in urban and non -urban areas. A Cluster PUD shall follow the procedures as outlined in this Code. A Cluster PUD is equally permittable in currently defined urban or non -urban areas per the PUD Ordinance. Given that this part of Weld County contains both urbanizing and nonurbanizing features, a Cluster PUD is an appropriate land development tool. H. The number of single-family residential units must not exceed two (2) per thirty -five -acre increment. The residential lots created by this option may not be further subdivided in the future. This ratio is illustrated in the table below. The property is approximately 122.5 acres in size. There are approximately 3.5 thirty -five -acre increments within this parcel. Two (2) residences are allowed per each of these increments, giving a total allotted residential unit of seven (7). As only six (6) single family residential units are proposed, this PUD proposal is compliant. Additionally, the six (6) proposed small lots comply with the PUD Water Provision per Section 27-2-210 of the Weld County Code which states an exception may be granted for nine (9) lots or less residentially clustered PUDs when public water is not available and the residential PUD results in an intensity of development that preserves and enhances agricultural lands and production. A PUD applying for an exception to the public water requirement must be considered a nonurban scale development as defined in this Chapter. A PUD not served by public water shall preserve a minimum eighty -acre agricultural Outlot except for Cluster PUDs SPECIFIC DEVELOPMENT GUIDE PER ARTICLE VI CHAPTER 27 OF THE WELD COUNTY CODE: Sec. 27-6-30. Major components of development guide: Sec. 27-6-40. Component One -environmental impacts. 1 -noise and vibration: the lots are well distance from one another and closest residential estate lot neighborhood is several hundred feet from the proposed PUD therefore noise and vibration will not be an issue. 2 -smoke, dust, odors: the lots are several hundred feet from the nearest neighborhood of estate lots and we do not anticipate this to travel to that distance and be an issue. 3 -heat, light, and glare. The same as above, several hundred feet distancing from the closest neighborhood. 4 -visual -aesthetic impacts- The single family residential homes shall follow Weld county code for building single family homes and adhere to Weld county's building permits. 5 -electrical interference- we do not anticipate any interference as Excel energy will run electrical lines according to Weld county code. 6 -water pollution-PUD estate lots with have their own septic systems and water systems. 7 -wastewater disposal -each estate lot will have their own individual septic system. 8 -wetland removal -the PUD site is dry land however if a wetland condition were to develop then it shall be managed by physically removal the wetland area by cutting, mowing, or uprooting the wetland by hand or by machinery. 9 -erosion and sedimentation -the builders/construction company shall follow an erosion and sedimentation control plan as designed by their structural/civil engineer. Measures include those necessary to delineate areas of work/disturbance, prevent erosion of unstable or denuded areas, plan for construction staging and storage logistics, construction of stabilized access points, and proper containment measures for construction materials and waste. 10 -excavating, filling and grading -The owners shall hire a license land grading company to perform this work and the contractor shall follow the building permit and Weld county code requirements. 11 -drilling, ditching and dredging -The land has ditches that are already dredged along CR 31. A license contractor shall dredge and form ditches along with coverts as needed to provide for water drainage. 12 -air pollution -The home owners shall follow recommended advise from the State of Colorado to decrease air pollution thru transportation, environmental factors, household factors and lawn/gardening tips provided on their website. 13 -solid waste -each estate lot residential dwelling shall use a dependable disposal waste company to remove in a timely fashion of all solid waste, trash. 14 -wildlife removal- there are no wildlife present on this raw parcel of land. 15 -national vegetation removal -land currently has no vegetation grow, no trees, grass or bushes. 16-radiation/radioactive material- land survey/improvement survey and previous records do not show any presence of this type of material. 17 -drinking water source -each estate lot/residential single family home shall apply for individual water wells. 18 -traffic impacts -no traffic study is needed according to Weld County public works Sec. 27-6-50. Component Two -service provision impacts. 1 -schools (school age children may choose to attend Brighton 27J school district or any other school of their choosing). 2 -law enforcement -will be provided by Weld County Sheriff's Office, Patrol district 3 3 -fire protection -Brighton fire rescue district 52 4 -ambulance -emergency service by Platte valley ambulance service 5 -transportation -the cluster PUD is accessible by CR 31 which is a collateral road to a private access road, granted ROW by City of Brighton. Access road will be paved and is 60 feet wide with round about at end to provide turn around for emergency vehicles per Weld County Code Sections 22-3-60 thru 22-3-190. 6-A traffic impact analysis was waived by Department of Public works, see referral in PUD packet. 7- Storm drainage study was waived after drainage report submitted by drainage engineer, see drainage report in PUD packet. 8- Utility Provisions -United Power will be providing electricity and gas will be provided by individual propane tanks. 9- Water provisions- each lot owner shall apply for a well permit thru Colorado water resources. 10- Sewage disposal- each lot owner shall apply for a OWTS permit thru Weld County. 11- Structural Road improvements- a 60 ft paved road will be developed according to Weld county code to allow access to the PUD district, currently there is 30 ft gravel private access road. ROW permit was granted thru City of Brighton from CR 31 onto private access road. Section. 27-6-60. Component three -landscaping elements. 1- The 6 lots are 3 plus acre estate lots. Each individual lot owner shall development their own landscape plan with elements according to Weld County code for individual estate lots. Section. 27-6-70. Component four -site design 1- There are no topography and no irrigation ditches on this PUD. 2,3,4 - Comprehensive Plan Conformance: Section 22-2-10 of the Weld County Comprehensive Plan contains Guiding Principles that are the foundation for land use policy in the County. All of the Goals and Objectives within the Weld County Comprehensive Plan are adopted with the intent that they are consistent with the Guiding Principles. This proposal supports two (2) relevant Guiding Principles. A. Respecting Our Agricultural Heritage. Weld County has an agricultural heritage built upon the hard work of pioneers and farmers on traditional family farms. Weld County is now one of the most economically productive agricultural counties in the nation. The Weld County Right to Farm Statement and the Goals and Objectives in this Plan support the importance of agriculture in the County. This application utilizes a development tool that expressly accounts for the retention of agricultural farm ground in the form of a reserved Outlot. Furthermore, this Cluster PUD protects this large Outlot of land for specific agricultural purposes for forty (40) years, should the PUD Final Plan be approved. B. Respecting Private Property Rights. One of the basic principles upon which the United States was founded is the right of citizens to own and utilize property so long as that use complies with local regulations and does not interfere with or infringe upon the rights of others. The property owners have requested to divide their land to create several small lots for family members to build residences. This proposal does not appear to interfere with or infringe upon the rights of others, as demonstrated by the relatively limited referral responses at this stage of the PUD application process. Additional referral and surrounding property owner input will be solicited during the PUD Change of Zone and Final Plan applications 5 -N/A Sec. 27-6-80. Component Five -common open space usage 1 -Each estate lot is comprised of 3 plus acres and elimination of common open space within the proposed PUD allows for each lot to have adequate open space. Sec. 27-6-90. Component Six-signage. 1-Signage shall be placed in accordance with the Weld County code. Sec. 27-6-100. Component Seven- RUA impact. 1 -The Planning dept. will review the PUD application for development inside the RUA with the applicable standards are set forth in Chapter 26. Sec. 27-6-110. Component Eight -Intergovernmental agreement. 1- The Planning dept. will review the PUD application to determine if an intergovernmental agreement in conjunction with the PUD application standards are set forth in the agreement. Change of Zone Planning C►uestionnaire 1) The purpose of this request is to develop a Cluster PUD of 4 three -acre estate lots. 2) The land is use for agricultural purposes such as raising cattle and harvesting hay and corn. 3) The proximity of proposed use of the residences are closest to CR 31, east of irrigation pond and ditch and 50 acres east of the land used for cattle and harvesting. 4) The proposed rezoning is not due to any faulty zoning, its sole purpose is to allow for 4 estate lots for family to live on. 5) The existing land uses are for harvesting hay/corn and raising cattle and rezoning the 4 lots will n ot affect the agricultural land use on the west side of the ditch and irrigation pond. 6) Our soil report showed good soil with no existence of any soil limitations. See copy of soils report with cluster PUD pre application on file. 7) Our change of zone proposal is consistent with Weld County's comprehensive plan and is compliant with Chapter 22 of the Weld County code. Our proposal is compliant by maintaining an agricultural land use designation. We as landowners voluntarily with conserve agriculture land use and our proposal doesn't not interfere with our already irrigation land use. We own and will keep our water share and have looked into purchasing additional water shares thru Brighton Lateral Ditch. As landowners we intend to promote a quality environment which is free of vehicles, refuse and unsightly materials. We have established that there is adequate water supply thru State Division of Water Resources for each 4 estate lots to have their own individual water well permit, see letter from the State of Colorado Division of Water Resources included with the cluster PUD application file. Each lot will have its own OWTS. Access road is already present, and City of Brighton has given ROW access permit #BP -21-01386 as they are owners of CR 31. Per Western Engineering Consultants drainage report, their report shows there is adequate stormwater drainage, see their report on file with our cluster PUD application. 8) The does not pertain to our proposal as we do not have any future development of the surrounding area or have any adopted master plans of affected municipalities. 9) -noise and vibration: the lots are well distance from one another, and closest residential estate lot neighborhood is several hundred feet from the proposed PUD therefore noise and vibration will not be an issue. -smoke, dust, odors: the lots are several hundred feet from the nearest n eighborhood of estate lots, and we do not anticipate this to travel to that distance and be an issue. -heat, light, and glare. The same as above, several hundred feet distancing from the closest neighborhood. -visual-aesthetic impacts- The single family residential homes shall follow Weld county code for building single family homes and adhere to Weld county's building permits. -electrical interference- we do not anticipate any interference as Excel energy will run e lectrical lines according to Weld County code. -water pollution-PUD estate lots with have their own septic systems and water systems. -wastewater disposal -each estate lot will have their own individual septic system. -wetland removal -the PUD site is dry land however if a wetland condition were to develop then it shall be managed by physically removal the wetland area by cutting, mowing, or uprooting the wetland by hand or by machinery. -erosion and sedimentation -the builders/construction company shall follow an erosion and sedimentation control plan as designed by their structural/civil engineer. Measures include those necessary to delineate areas of work/disturbance, prevent erosion of unstable or denuded areas, plan for construction staging and storage logistics, construction of stabilized access points, and proper containment measures for construction materials and waste. - excavating, filling and grading -The owners shall hire a license land grading company to perform this work and the contractor shall follow the building permit and Weld county code requirements. -drilling, ditching and dredging -The land has ditches that are already dredged along CR 31. A license contractor shall dredge and form ditches along with coverts as needed to provide for water drainage. -air pollution -The homeowners shall follow recommended advise from the State of Colorado to decrease air pollution thru transportation, environmental factors, household factors and lawn/gardening tips provided on their website, -solid waste -each estate lot residential dwelling shall use a dependable disposal waste company to remove in a timely fashion of all solid waste, trash, -wildlife removal- there are no wildlife present on this raw parcel of land. -national vegetation removal -land currently has no vegetation grow, no trees, grass or bushes, -radiation/radioactive material- land survey/improvement survey and previous records do not show any presence of this type of material. 10) This is not applicable to our proposal as our land is not located within any overlay zoning district or a special flood hazard are identified by maps officially adopted by the County. Change of Zone Development Review C►uestionnaire 1) Currently the land is zoned agricultural, and our proposal is for a change of zone to allow for 4 - three -acre estate lots. The access location is off of CR 31. The City of Brighton are the owners of CR 31 and have issued a ROW permit (permit # BP -21-01386). The closest intersecting county road is % mile south of the access road off CR 31 to nearest intersection of CR 2 & CR 31. 2) There are no anticipated changes to an existing access. 3) There is not an existing gate or a proposed gate to access the road or future lots. 4) There are no accesses on adjacent parcels or on parcel located on the opposite side of the road. 5) The land is flat and without trees or bushes that could obstruct anyone's view of the road, Northbound or Southbound traffic. They are no anticipated difficulties seeing oncoming traffic from this proposed access. 6) There are no horizontal curves in the vicinity of the access road. The access road in flat and straight as well as CR 31 is flat and straight. 7) The topography of the access road and CR 31 is flat in the vicinity of the existing access. Change of Zone Environmental Health Questionnaire !) The proposed potable water source for each of the 4 estate lots will be individual water wells after they obtained their well permits thru Colorado State Division of Water Resources. See letter on file with the Cluster PUD application stating there is adequate water sources available for the 4 proposed estate lots to apply for an individual water well. 2) The proposed sewage disposal system with include an OWTS for each individual lot. "A new on -site wastewater treatment system is proposed". There are no existing OWTS on this land. fThGHpLAmgENGIiEERIN.G.&DEsTGN,ttc 555 MAIN STREET, P.O. BOX 1077, HUDSON, CO 80642 • PHONE: 303-857-9280 • FAX: 303-857-9238 Date: May 26, 2021 Lisa Nguyen 1726 Virginia Drive Fort Lupton, CO 8621 Phone: 720-988-5023 Email:• [n1 ....g'comoas t net RE: To provide an Onsite Wastewater Treatment System (OWTS) for the proposed 4 bedroom home located at Parcel No. 147133100011, Lot D of Recorded Exemption RECX 20-0040, A Part of the S1/2 of the N1/2 of Section 33, Ti N, R66W of the 6th P.M., Weld County, CO. Job #21-2400 PRELIMINARY INVESTIGATION - 04/29/2021 There are no existing structures located at the above -described site. The proposed well is located North of the proposed home. Any water well must be a minimum of 100 feet from the STA. There are no records of existing septic systems per Weld County Department of Public Health and Environment (WCDPHE). The topography at the site slopes approximately 3.25% to the West -Southwest. The information obtained from Natural Resources Conservation Service (NRCS) indicates that Map Unit 44 consists of Olney loamy sand, 1-3 percent slopes; Map Unit 47 consists of Olney fine sandy loam, 1-3% slopes. There are no physical features noted that will require a setback per Table 5, in Appendix A. Through locates and other information gathered, High Plains Engineering & Design, LLC (HPE&D) presumes that the OWTS is located outside any easements. HPE&D recommends that the home owner/contractor verify these findings with a survey of the site. If any easements are found that may affect the OWTS, please contact HPE&D so the septic design can be revised for this site. The site is not in the floodplain per FEMA Flood Plain Ma p RECONNAISSANCE (SITE) VISIT _ TO EVALUATE - O4l3Q/2Q2 1 No vegetative restrictions exist at the OWTS site, the vegetation consists of native grasses and weeds. The topography at the STA location is approximately 3.25% slope to the West - Southwest. There are no natural or cultural features noted at the site. The historic land use is not known. The current or planned land use for this lot will be to construct a single family home. The soils investigation was performed by a visual and tactile evaluation in two excavated test pits. Please reference the attached HPE&D Pit Evaluation report. The STA shall be located a maximum of 48" below grade in the Sandy Loam. 1 We do not anticipate any construction related issues other than a maximum depth. We recommend that the STA, septic piping and appurtenances are fenced to keep construction traffic off the system. The proposed land use should not affect the performance of the OWTS; a water meter should be installed to monitor the water consumption. There were not any difficulties encountered during the site evaluation. SEPTIC SYSTEM DESIGN DATA: The purpose of this design is to provide a septic system for the proposed 4 bedroom single family home to be constructed at the above -described site. The design flow will be 525 Gallons Per Day (GPD). The design will be based on Treatment Level 1 with standard residential effluent strength; the owner(s) reported that they do not have any hobbies that would alter or spike the effluent BODs strength. They will need to monitor the waste flow and minimize the contamination of the "normal" waste stream. The soil type is 2A, the Long Term Acceptance Rate (LTAR) is 0.50, or percolation rate of 26-40 MPI. FOR WELD COUNTY: GRAVITY ICS The chamber computations are from the WCDPHE Chapter 30 OWTS Manual dated February 12, 2018. The LTAR of 0.50 GPD/SQ.FT. (26-40 MPI) was used for our computations. Soil Treatment Area (STA) = Din Flow = 525 GPD = 1050 SF LTAR 0.50 GPD/SF Bed Multiplier (1.2) 1050 SF x 1.2 = 1260 SF Chamber Multiplier (0.7) 1260 SF x 0.7 = 882 SF # of Q4 Chambers = 882 SF / 12 SF per Q4 =74 Q4 4 76 Total Q4 Chambers (1 bed) (end feed) Bed Length = 19 Q4 chambers x 4 FT = 76 FT + 4 FT = 80 FT STA Dimensions = 12' wide x 80' long Check CLR= Q/L = 525 GPD/80 = 6.57 (<12) OK INSTALL 1 BED WITH 4 ROWS OF 19 STANDARD CAPACITY Q4 INFILTRATORS PER BED IN AN END FEED GRAVITY FLOW BED SYSTEM AS SHOWN ON THE ATTACHED SITE PLAN(S). The proposed house may need to be raised for a gravity flow septic system to be utilized at this site. If a gravity system is not utilized at this site please contact High Plains Engineering & Design, LLC so the septic design can be revised for this site. The installer shall place geotextile (landscape) fabric over the chambers to help prevent soil fines from back -flowing into the chamber through the louvers. A 30 mil. (min.) plastic liner MAY be required because of the existing slope of grade and the limiting bed depth of the system. If any part of the chamber is above grade, then the plastic liner MUST be installed. Place the liner around the perimeter of the STA where finished bed grades are filled above existing natural grades, which is typical. 2 NOTE: The Engineer and Health Department will inspect the site once the Q4 chambers, plastic liner (if required), septic tank and all components are in place prior to backfilling. SEPTIC TANK, PIPING and DISTRf BIJTION BOX PECIFIC, TIONS: 4 Install one Colorado Department of Public Health & Environment (CDPHE) approved Infiltrator IM -1530 -gallon capacity, two compartment (leak proof) septic tank that has been approved by CDPHE. The tank shall be buried between 0" - 28" or per manufacturer's specification. All tanks installed at high groundwater sites shall be anchored in accordance with manufacturer's recommendations. The tank shall be installed at the elevation depicted on the design site plan. The installer and owner shall follow the maximum depth of cover as specified by the manufacturer. The inlet and outlet shall provide 4" diameter. Sewer line from the building to the tank shall be installed a minimum of 22" deep. If the site requires the sewer line to be shallower than 22", the backfill will need to be mounded to achieve the minimum depth of 22" below finished grade. Do not block drainage swales. All piping shall be bedded with granular, mechanically compacted soil. The pipe identification shall be visible for the inspector. The Distribution Box (D -Box) shall be placed a minimum of 5' from both the septic tank and the STA, at a depth between 12" - 18", which is typical, below grade with a riser to the surface. Flow equalizers (speed levelers) shall be installed. Inspection ports must be installed at the end of each trench and per manufacturer recommendations for chambers. Installer is to provide a schedule 40 pipe sleeve when trenching below any road or driveway. The STA shall be isolated from all vehicular travel, parking, grazing, and storage areas. We recommend that the surface of the STA be seeded after installation of the system. A good native grass cover will promote evapotranspiration from the field and reduce erosion. We recommend using a seed mix such as a "Foothills, Pasture, or Prairie" mixes available at local feed and seed stores. These mixes do not require irrigation and develop a growth 10" to 15" high. An automatic sprinkler system shall not be installed above the STA. CONSTRUCTION MEANS AND METHODS: During cold weather, caution should be used when installing OWTS due to frost. If frost occurs, any placement of STA components shall not be placed until soil frost recedes. Do NOT use any additives such as antifreeze or salt to prevent or defrost an OWTS. Do NOT run any water continuously, to prevent frost. This may flood and irreparably harm the OWTS. 3 Properly compact the soil below the tank locations) prior to placement of the tank(s) to prevent settlement. OPERATIC AND MAINTE\ ANCE: The owner must read and follow the recommendations below to prolong the life of the OWTS. The owner must realize an OWTS is considerably different from public sewer services. The owner must be aware of and assume the responsibility for continued maintenance of the system. The system is relatively maintenance free, but the owner must have the septic tanks pumped. We recommend the septic tank be pumped at the end of the 1st year of use to monitor sludge buildup and then at a minimum of every 2 years or as required by the governing agency. Effluent filter and screened vaults, as applicable, are to be cleaned at the time of pumping or as needed. There are also daily considerations, such as not putting plastic or other non -biodegradable material into the sewage disposal system. Also, water use must be carefully monitored so toilets are not allowed to run when seals malfunction. To illustrate the point, a running toilet may consume in excess of 1000 gallons per day if allowed to run which could flood and irreparably harm the system. We also caution against the installation of a water softener. The high levels of salt from the backwash of a water softener is detrimental to all on -site sewage disposal systems and a separate drywell should be constructed for the backwash waste if a water softener is installed. No landscaping or plastic can be used over the disposal field which will reduce evapotranspiration from the disposal field. Chemically treated water from a swimming pool or spas should not be introduced into the OWTS. For additional OWTS information, please visit www.cpow.net. All construction is to be in accordance with Weld County Department of Public Health & Environment Chapter 30 On -Site Wastewater Treatment System (OWTS) Regulations. Certification: I hereby certify that the septic system shown on this plan was made by me or under my direct supervision and is accurate to the best of my knowledge or belief. Todd M. Schroeder, PE 33548 Attachments: Figure 1 A: Overall Site Plan Figure 1 B: Intermediate Site Plan Figure 1 C: Scaled Site Plan Figure 2: Gravity Chamber Bed Section view Figure 3: Table 30-10-1; Design Flow; Tank Size Web Soil Survey WCHDPH Site Plan & Design Checklist(s) Visual & Tactile (PIT) Report Site Map 4 SITE M A1ri PARCEL NO. 14713310001 I , LOT D or RECORDED EXEMPTION RECX 20-0040 A PART or THE 51/2 OF THE N1/2 or SECTION 33, T ! N, R66W OF THE 6TH P.N. WELD COUNTY, CO OVER ALL SITE NET TO SCALE LEGEND o - Percolation Test Hole X - Percolation Profile Hole A -Soil Profile Hole *X Fence * -Bench Mark ,1. —..natiorinir FIGURE lA 1 1 JLJB#21-2400 DATE: 5-26-2021 All locations shown above are based on specific information furnished by others or estimates made in the field by High Plains Engineering & Design personnel. The locations, distances, directions, etc, are riot the result of a property survey but are approxino tiorts and are not warranted to be exact. It is the owner/builder's responsibility to define property - boundaries and ensure all onsite improvements are located within the platted site and out of inappropriate easements. AR distances are to be verified prior to excavation, Soil Pit SITE MAC PARCEL NO. 1471331000 I I , LOT D OF RECORDED EXEMPTION RECX 20-0040 A PART OF THE 51/2 or THE N1/2 OF SECTION 33, T I N, KGGW OF THE GTH P.M. WELD COUNTY, CO DISTRIBUTION BOX THE STA CIINSIST OF1BED WITH ROWS OF 19 Q4 CHAMBERS .Ty 1 t - 41 1 B.M. 1500 GAL SEPTIC TANK C EXISTING GRADE = EG EG = 101.3 AT A EG = 9811 AT D EG=97:8ATE EG = 98,4 AT F EG = 98.9 AT G EG = 98.3 AT H BM 100.0 INTERMEDIATE SITE NOT TO SCALE LEGEND o - Percolation Test Hole X -Percolation Profile Hole /\-Soil Profile Hole SHE Fence - Bench Mark - Soil Pit G Fir Way PROPOSED vWad_ S OBSERVATION PORTS L2' (4 CORNERS TXP) INVERT ELEV. A = 104.6 =100,0 C = 997 D = 95.6 E = 95.6 F=95.6 G = 95.6 H = 95.6 .—rr -ter- 0 25 50 75 X00 TO WELD COUNTY ROAD 31 TO WELD COUNTY ROAD 4 FIGURE 1B JUB#21-2400 DATE, 5-26--2021 All locations shown above are based on specific information furnished by others or estimates made in the field by High Plains Engineering & Design personnel, The locations, distances, directions, etc. are not the result of a property survey but are approximations and are not warranted to be exact, It is the owner/builder's responsibility to define property - boundaries and ensure all onsite improvements are located within the platted site and out of inappropriate easements. All distances are to be verified prior to excavation, SITE fVA� PARCEL NO. 147 1 33100011, LOT D OF KECORDED EXEMPTION RECX 20-0040 A PART OF THE 51/2 or THE N1/2 OF SECTION 33, TIN, R66W OF THE 6TH P.M. WELD COUNTY, CO f 1/4 DISTRIBUTION BOX THE STA CONSIST OF 1 BED WITH 4 ROWS OF 19 Q4 CHAMBERS 80' EXISTING GRADE = EG EG = 101.3 AT A EG = 98.1 AT D EG = 97.8 AT E EG = 98,4 AT F EG = 98.9 AT G EG = 98.3 AT H BM = 100.0 I 1/2 1500 SEPTIC TANK LEGEND o - Percolation Test Hole X -Percolation Profile Hole A -Soil Profile Hole �-�E-Fence - Bench Mark - Soil Pit /OBSERVATION PORTS 12' (4 CORNERS TYP,) 100' ▪ S PROPOSED WELL be INVERT ELEV. A = 100.3 B = 100.0 C = 99,7 D - 95.6 E = 95.6 F - 95.6 G = 95.6 H = 95.6 0 25 • 71/44. 1 -se 50 ere ter SCALE: 1 : 60 FIGURE 1C L ti 75 Sc 100 1 TO WELD COUNTY ROAD 4 TO WELD COUNTY ROAD 31 JLB#21-2400 DATE S-26-2021 All locations shown above are based on specific information furnished by others or estimates made in the field by High Plains Engineering & Design personnel. The locations, distances, directions, etc, are not the result of a property survey but are approximations and are not warranted to be exact, It is the ownerlbuilder's responsibility to define property - boundaries and ensure all onsite improvements are located within the platted site and out of inappropriate easements. All distances are to be verified prior to excavation, U a .a r1, a.* c7 z w w c., LI; can su z z Am 00 CO C" a) LU co r -r co co oo ceNii I I..L. co O co t W z 0 Ncr O C" 00 ct Nan O z 0 D 2 0 r X O m 0 OJ Iii W^� I T cov z LU LU Ltd 0 LSI Ld OD X H- 0 (.9 4J 5 C.) Lai L] V ) /( 1 C ) I � C) 1 W m =C I W m ccC rY T- Name: LISA NGUYEN Jab # 21-2400 Weld County WELD COUNTY: TABLE 30-10-1 Long Term Acceptance Rate (LTAR); Gallons per day per square foot Soil Type, Texture, Structure and Percolation Rate Range Soil Type USDA Soil Texture USDA Soil Structure -Type Percolation Rate (MPI) All Treatment Levels USDA Soil Structure- Grade R >35% Rock (>2mm): See Table 30-10-1A >35% Rock See Table (>2mm): 30-10-1A >35% Rock (>2mm): 10-1A See Table 30- ' >35% Rock (>2mm): See Table 30-10-1A >35% Rock (>2mm): See Table 30-10-1A 1 Sand, Loamy Sand Single Grain 0 (Structureless) 5-15 0.80 i 2 Sandy Loam, Loam, Silt Loam PR (Prismatic) BK (Blocky) GR (Granular) 2 (Moderate) 3 (Strong) 16-25 0 60 2�..--- PR, BK, IV r 1 eak 2640 0 50 Sandy Loam, Loam, Silt Massive 0 (Strut ure ess PR, BK, GR 2, 3 41-60 0 35 Sandy Clay Loam, Loam, Silty Clay Clay Loam 3 3A Sandy Clay Loam, Silty Loam, Clay Clay Loam PR. BK, GR Massive 61-75 0 30 1 0 (Structureless) PR, BK, GR 2, 3 76-90 0 20 4 Sandy Clay, Clay. Silty Clay Sandy Clay, Clay, Silty Clay PR, BK, GR Massive 1 0 (Structureless) 91-120 0.15 4A Soil Types 2-4A Platy 1, 2, 3 121+ 0.10 5 Design Flow # of Bedrooms Design Flow 300 2 3 450 4 525 5 600 6 675 Tank Sizes Tank Size # of Bedrooms 2 or 3 1000 1- 4_ __ + 250 Each Additional Table 12: NDDS Size Adjustment Factors Soil Type Percolation Rate Size Adjustment Factor 1,2,2A,3,3A 5-75 2.2 4 76-90 1.7 4A I 91-120 1.5 5 121+ 1.4 STA = Design Flow / LTAR NDDS = DESIGN FLOW X SAF / LTAR Figure3 CL O ti O 0 0 0 0 0 il 11� rl r• N. up 0 timl o �� O L `N ['r} u� 1n �� CI. O il TS t C. ry 0 si 0 CI)r� ,--1 0 O o ,, CA c@ ua � vp co 6 L O1 r D 4 0 ► o a, >- >, E U, 4_,- E U u� C VI 10 OO -0 U) W cu C t= e iv go ro — to Z >' r� O u., r1 o. o LA a on O },. �' �ap.� ir O E O (Do, E L 10 t_ V 1 L. __ O Q.1 — td � U � to W C Cu ® c C C'-'.i co ra o ,._, .-1 c cz �n c o a ro a V 0 C a win ro ) f L 47 ]► tU t]J C C L C s- C L. C Q 0- C O d 0 W Ca] Q1 O O O O L C -- co t- — O to a C_ a O° a > an to > rn GS - _ C Na0- O O" y Uri o Vi L 4.1 ds a 2 CU � V �m Th r. Lin i-rs 2:55:10 PM -- Web Soi Friday, May 21, 2021 County use only-PermitiD# Address DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue Greeley, CO 80631 Web: l ivi ti't i. Yee I d L 1 gad it . c ,'t Health Administration Vital Records Tele: 970.304.6410 Fax: 970.304.6412 Public Health & Clinical Services Tele: 970.304.6420 Fax 970.3045416 Environmental Health Services Tele: 970.304.6415 Fax: 970.304.6411 Communication, Education & Planning Tele: 970.304.6470 Fax: 970.304.6452 Our Vision: Togetherwith the communities we sealer we are working to make We(d County the healthiest place Public liea43. Emergency Preparedness & Response Tele: 970.304.0420 Fax: 970.304.6469 to /1wer ream, work and play. Site Plan Requirements from Sections 30-5-60 and 30-5-70 of the Weld County OWTS Regulations Site Plan Checklist O Site Plan Diagram Size: No smaller than 8 1/z" x 11" o Site Plan Scale — required to be to standard engineering scale O Owner Name o Street Name and Address o Arrow Pointing North & Labeled O Property Boundaries o Easements o Profile Test Holes (borings or pits) and Percolation Holes. NOTE: Pits required by July 1, 2016 O Contours or slope direction and percent slope o Proposed elevation of the infiltrative surface of the soil treatment are, from an established datum (either ground sue -ace or benchmark)(Depth of system) O Location, dimensions and depths ofproposed OWTS components, including, but not limited to the soil treatment area, septic tank, distribution boxes (see also Design Document Checklist) o Distances from the proposed OWTS to all required setbacks from Table 30-7-1, including, but not limited to proposed or existing wells; water lines; high water mark of ponds, retention or detention ponds, lakes stream, or other surface waters; ditches (see also Design Document Checklist) o Eseated depth of periodically saturated soils and bedrock, or flood elevation, if applicable. o Dimension indicating vertical separation from infiltrative surface of the soil treatment area to groundwater or restrictive layer. o Existing or proposed house O Existing or proposed driveway Existing or future other lot improvements (barns, sheds; garages, pools) County use only-PermitlD# Address DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17th Avenue Greeley, CO 80631 Web: vinvitieweidneaith4o Health Administration Vital Records Tele: 970.304.6410 Fax: 970.304.6412 y • Public Health & Clinical Services Tele: 970.304.6420 Fax 970.304.641 6 Environmental Health Services Tele: 970.304.6415 Fax: 970.304.6411 Communication, Education & Planning Tele: 970.3043470 Fax: 970.304_6452 Publtell!!!4Ch Emergency preparedness & Response Tele: 970.304.6420 Fax: 970.304.6469 Our vision: Together with the communities we serve, we are working to make Weld County the healthiest place to five, /earn, work and play. Design Document Requirements from Sections 30-5-60 and 30-5-70 of the Weld County OWTS Regulations Desjgu. Document Checklist o Assumptions and calculations for each component o A drawing, to a standard engineering scale, showing location of each OWTS component and distances to water, physical and health impact features requiring setbacks (see also Site Plan Checklist) O Layout of soil treatment area, dimensions of trenches or beds, distribution method and equipment, distribution boxes, drop boxes, valves, or other components used (see also Site Plan Checklist) Depth from finished grade to: infiltrative surface of soil treatment area, the top of the septic tank lid top of other components (see also Site Plan Checklist) o Specifications for each component. Specifications for septic tanks or other buried components must include loads due to burial depth, additional weight or pressure loads, and highest elevation of ground water. Resistance to local water composition such as high sulfates shall be included in the specification if such conditions exist at the site o References to design manuals or other technical materials used o Installation procedures; This includes methods of excavation & equipment used, methods & equipment for compaction, placing & leveling sewer rock and ensuring all components are secured against buoyancy. o Operation and maintenance manuals or instructions for each component (building sewer, tank, d -box, manifold, drainfieldL o Other information that may be useful such as photos and cross-section drawings 1 HIGH PLAINS ENGINEERING & DESIGN, LIC 555 MAIN STREET, P.O. BOX 1077, HUDSON, CO 80642 • PHONE: 303-857-9280 • FAX: 303-857-9238 FILE NO, 21-2400 SITE EVALUATOR RANDALL TREVER ADDRESS 555 MAIN STREET, P.O. BOX 1077, HUDSON, COLORADO 80642 EMAIL RANDALLTHPEDESIGN.COM PHONE 1-303-857-9280 CREDENTIALS COMPLETED CPOW SOILS CLASS HELD SEPTEMBER 12-13, 2019 2 YEARS EXPERIENCE WITH OWTS SYSTEMS PRELIMINARY INVESTIGATION DATE 4/29/2021 CONTACT INFO NAME LISA NGUYEN ADDRESS 1726 VIRGINIA DRIVE, FORT LUPTON, CO 80621 PHONE 720-988-5023 SITE ADDRESS PARCEL NO. 147133100011, WELD COUNTY, Co. LEGAL DESCRIPTION LOT THE D N1/2 OF RECORDED OF SECTION EXEMPTION 33, T1 N, R66W RECX OF THE 20-0040, 6TH A P.M. PART OF THE S1/2 OF STRUCTURE S NO STRUCTURES ON THIS SITE WELL PROPOSED WELL TO BE LOCATED NORTH OF THE PROPOSED HOME COUNTY RECORDS NO RECORDS PER WELD COUNTY HEALTH DEPARTMENT TOPOGRAPHY THE SITE SLOPES APPROXIMATELY 3.25% TO THE WEST-SOUTHWEST EASEMENTS NO EASEMENTS PER OWNER FLOODPLAIN NOT IN THE FLOODPLAIN PER FEMA FLOOD PLAIN MAP NRCS OLNEY LOAMY SAND, 1 - 3 % SLOPES ; OLNEY FINE SANDY LOAM, 1 - 3 % SLOPES 4/30/2021 RECONNAISSANCE DATE NO VEGETATIVE RESTRICTIONS EXIST AT THE OWTS SITE LANDSCAPE POSITION VEGETATION NATIVE WEEDS AND GRASSES Groundwater Bedrock ENCOUNTERED @ _ GREATER THAN 8' 1" ENCOUNTERED @ GREATER THAN _ 8' 1" ESTIMATED MAXIMUM WATER ENCOUNTERED TABLE SEASONAL DEPTH IF NOT TO ESTIMATED ENCOUNTERED PROFILE DEPTH IN IF NOT IS AREA FLUCTUATIONS SEASONAL BELIEVED WATER TO WHICH TABLE BE SUBJECT COULD WITHIN TO RESULT 8' OF SEASONAL SURFACE IN A TYPE OF BEDROCK IS BEDROCK FRACTURED = OR WEATHERED? Soil Profile Hole Log PIT #1 0 _:_ 1 2 3 : a 3 4 0 5 O 6 7 8 9 10 SANDY LOAM 0' - 8'1" a U. a) a PIT #2 Folarr 0 1 2 3 SANDY LOAM 0' - 8' 4 5 6 7 8 9 10 THE OWTS SHALL BE CONSTRUCTED IN THE SOIL HORIZON OF THE SANDY LOAM. THE STA IS SIZE BASED ON THE SANDY LOAM WHICH HAS A GRANULAR STRUCTURE -TYPE WITH A WEAK STRUCTURE -GRADE. BASED ON THE INFORMATION WE COLLECTED FROM OUR INVESTIGATION THIS SITE HAS A LTAR RATE OF 0.50 AND A PERC RATE OF 26-40 (MPI). Certification I certify that the above information is correct and complete to the best of my knowledge and that all tests were performed in the accordance with the provisions of The Governing Health Department On -Site Wastewater Treatment System (OWTS) regulations by myself or under my supervision. Signature Date High Plains Engineering & Design LLC 555 Main Street, P.O. Box 1077 Hudson, CO 80642 303-857-9280 • SITE MAC PARCEL NO. 147133100011, LOT D or RECORDED EXEMPTION RECX 20-0040 A PART OF THE 51/2 OF THE N1/2 OF SECTION 33, T I N, GGAA/ or THE 6TH P.N. WELD COON -1, CO 102' 185' 165' 235° 188' BM 99' 283' X62 _ r FT//i PIT #2 LEGEND o - Percolation Test Hole X -Percolation Profile Hole /\-Soil Profile Hole -)eE-Fence - Bench Mark - Soil Pit 255' 233' TO WELD COUNTY ROAD 4 TO WELD COUNTY KOAD3I All locations shown above are based on specific information furnished by others or estimates mode in the Feld by High Pla.lns Engineering 8 Design personnel. The locations, distances, directions, etc. are not the resutt of a property survey out are approximations and are not warranted to be exact. It is the owner/builder's responsibility to define property - boundaries and ensure ad orrsite improvements are located within the platted site and out of inappropriate easements. All distances are to be verified prior to excavation. From: To: Subject: Date: Attachments: Karin McDougal Michael Hall RE: RE: PUDZ Water Update Friday, August 19, 2022 8:24:36 AM image001.jpg image002.pnq Michael, I believe this report show that there is sufficient water supply for this development, so the application can move forward. Thanks. Karin Karin McDougal Assistant County Attorney Weld County Attorney's Office 1150 "0" Street Greeley, CO 80631 970-400-4396 STATEMENT OF CONFIDENTIALITY & DISCLAIMER: The information contained in this email message is attorney privileged and confidential, intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please notify us immediately by replying and delete the message. Thank you. From: Michael Hall <mhall@weldgov.com> Sent: Wednesday, August 3, 2022 3:21 PM To: Karin McDougal <kmcdougal@weldgov.com> Subject: RE: RE: PUDZ Water Update Karin, Lisa hired a different engineer who prepared a water memo in response to our anticipated requirements. Please see attached... note, I have combined this new doc with the rest of the water docs that have been submitted so far. Please review and let me know if this is sufficient or if more is needed. Thank you, Michael Hall Planner II (970) 400-3528 mhall@weldgov.com 1555 N17th Avenue Greeley, CO 80631 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Michael Hall Sent: Tuesday, August 2, 2022 8:17 AM To: Karin McDougal <kmcdougal@weldgov.com> Subject: RE: RE: PUDZ Water Update Hello Karin, By chance, I was going through an online publication of the APA and the attached article was in it regarding the responsibility of local governments to properly review a development's water supply proposal. Your opinion below matches what is recommended in the article, refer to highlighted text. I will communicate this requirement to the applicant. Thank you, Michael Hall Planner II (970) 400-3528 mhall@weldgov.com 1555 N17th Avenue Greeley, CO 80631 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Karin McDougal <kmcdougal@weldgov.com> Sent: Thursday, July 28, 2022 4:48 PM To: Michael Hall <mhall@weldgov.com> Subject: RE: RE: PUDZ Water Update Michael, I reviewed the information provided and also ran it past Bruce. Unfortunately, I do not believe this is sufficient to move forward. We need an engineer to tell us that there is sufficient water to support this kind of development. In my legal opinion, that includes an estimation on how long the water supply would last with this kind of development in place. Thanks. Karin Karin McDougal Assistant County Attorney Weld County Attorney's Office 1150 "0" Street Greeley, CO 80631 970-400-4396 STATEMENT OF CONFIDENTIALITY & DISCLAIMER: The information contained in this email message is attorney privileged and confidential, intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please notify us immediately by replying and delete the message. Thank you. From: Michael Hall <mhall@weldgov.com> Sent: Friday, July 15, 2022 10:42 AM To: Karin McDougal <kmcdougal@weldgov.com> Subject: FW: RE: PUDZ Water Update Hello Karin, See below email in reference to the proposed Cluster PUDZ that we spoke about a few weeks ago. The applicant contacted an engineer, who provided the attached documents regarding adequacy of well water for the Cluster PUD. Please review and let me know your opinion whether this is sufficient or if more is needed. Thank you, Michael Hall Planner II (970) 400-3528 mhall@weldgov.com 1555 N17th Avenue Greeley, CO 80631 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: LISA NGUYEN <In153@comcast.net> Sent: Thursday, July 14, 2022 8:58 AM To: Michael Hall <mhall@weldgov.com> Subject: Fwd: RE: PUDZ Water Update Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hello Michael, I'm attaching a water report from the state website showing that there is adequate water supply for the additional 5 lots. The water engineer, Doug Seely emailed it to me and said this should be what the Weld County attorney is looking for. Also, see his email below explaining the water supply below. Thanks, Lisa Original Message From: Doug Seely <doug@nocoengineering.com> To: Lisa Nguyen <In153@comcast.net> Date: 07/13/2022 1:41 PM Subject: RE: PUDZ Water Update Lisa, Attached is a report from the DWR online aquifer tool (https://dwr.state.co.us/Tools/DenverTract). I ran this for a 5 ac tract at your property location in the S1/2 of the NW1/4 of Section 33. Note that the amount of water available is dependent on the surface area of the tract. Results show 0.8 acre-feet per year from Not Non-Trib (Lower Arapahoe) and 1.4 acre-feet per year from the Non-Trib aquifer (Laramie -Fox Hills) for a 5 ac tract. Perhaps this information is sufficient for your needs? The online tool is available to anyone to use. If you need more that this you might want to contact Steve at Clear Water Solutions (http://www.clearwatercolorado.com/). Doug 970-988-1459 From: Lisa Nguyen <In153@comcast.net> Sent: Wednesday, July 13, 2022 1:13 PM To: Doug Seely <doug@nocoengineering.com> Subject: Re: PUDZ DZ Water Update CR 31, between CR2 and CR4 My house that is being built is 503 CR31, Brighton 80603 Sent from my iPhone On Jul 13, 2022, at 12:58 PM, Doug Seely <doug@nocoengineering.com> wrote: Hi Lisa Could you please provide me with the location of the proposed building lots? Thanks, Doug Ill DOUGLAS C. SEELY, PE 8209 W. 20th Street, Suite A Greeley, Co 80634 970-988-1459 From: Lisa Nguyen <In153@comcast.net> Sent: Wednesday, July 13, 2022 10:31 AM To: Doug Seely <doug@nocoengineering.com> Subject: PUDZ Water Update Sent from my iPhone Begin forwarded message: From: Michael Hall <mhall@weldgov.com> Date: July 6, 2022 at 1:20:18 PM MDT To: Lisa Nguyen <In153@comcast.net> Subject: RE: PUDZ Water Update Hi Lisa, See attached consultant list. There are a few engineering firms listed that you may consider calling. Generically, it is likely that you are looking for any civil engineer who is capable of evaluating the water. Other than that, I just did a quick google search for water engineer, and I got a lot of results for this area, such as Terracon Consultants, Northern Engineering, Clear Water Solutions, Water & Earth Technologies, etc. Thank you, Michael Hall Planner II (970) 400-3528 mhall@weldgov.com 1555 N17th Avenue Greeley, CO 80631 image002.jpg Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Lisa Nguyen <In153@comcast.net> Sent: Wednesday, July 6, 2022 11:39 AM To: Michael Hall <mhall@weldgov.com> Subject: Re: PUDZ DZ Water Update Caution This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Michael Can you recommend a water engineer that you worked with and is good? Thanks Lisa Sent from my iPhone On Jul 6, 2022, at 8:56 AM, Michael Hall <mhall@weldgov.com>wrote: Hello Lisa, Apologies for the delay, I have been waiting on a response from the Weld County Attorney's Office, prior to advancing the processing of the PUDZ application. Specifically, as part of the PUDZ intake process, the Weld County Attorney's Office needs to approve the proposed water plan for the PUD. As there have been no other Cluster PUD applications in 20+ years, their evaluation took some time. The Weld County Attorney's Office provides the following comments: "After review of the information submitted by the applicant, our code requirements, and the referral from the State of Colorado, 1 do not believe that the applicant has provided sufficient information for our office to determine that there is an adequate water supply for the Cluster PUD. I reviewed the permit the applicant submitted and the referral from the Department of Water Resources. The permit is only for one well and according to the referral, if this PUD is approved, that permit will likely need to be redone or canceled. There is no information about whether the water source for the cluster PUD is sufficient to supply water to all six lots that are being proposed and the State of Colorado referral basically stated that they didn't have enough information to make a determination about sufficient water supply at this time. It is my understanding that the applicants chose option one under Section 27-6-20, in our Development Guide, which is the specific option. That means that Sections 27-6-40(b) and 27-6-50(B)(9) Weld County Code, both apply. Both require detailed information about water supply. I understand that it may be a little confusing for the applicants because a Cluster PUD is an exception to the public water component but it is not an exception to providing evidence of adequate water supply. Section 27-6-120(d) which tells that a PUD zone district shall be serviced by an adequate water supply and sewage disposal system in compliance with the performance standards in Article II of this Chapter. If the State isn't able to provide them the information regarding sufficient water supply, they may need to contact a water engineer who can provide a report about the ability of the aquifer to meet their development request." In other words, as the State does not comment on if future water wells would be an adequate water supply, you need to hire an engineer who can evaluate the likelihood that the aquifer can provide both the quantity and quality of water for the proposed uses within your PUD. The Engineer's report needs to be submitted to the County in order to continue processing the PUDZ application. Thank you, Michael Hall Planner II (970) 400-3528 mhall@weldgov.com 1555 N17th Avenue Greeley, CO 80631 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. Notice of Inquiry Weld County Pre -application Case # PRE22-0040 Date of Inquiry 3/4/2022 Municipality Fort Lupton CPA Name of Person Inquiring Lisa Nguyen Property Owner Lisa Nguyen, Brandon Nguyen & Moriah Turney Planner Michael Hall Planner Phone Number (970) 400-3528 Planner Email Address mhall@weldgov.com Legal Description Lot D of RECX20-0040 Parcel Number 147133100011 Nearest Intersection CR 31 & CR 4 Type of Inquiry Proposed Cluster PUD The above person met with County Planning staff about developing a parcel of land inside your designated Intergovernmental Agreement/Coordinated Planning Agreement Boundary. County Planner's signature Would you like to pursue annexation of this property? NO Date of Contact 3 7 VI --- Comments: Please sign and date to acknowledge that the applicant has contacted you and return this signed form to Weld County Department of Planning Services. Weld County Planning Department 1555 N 17th Ave, Greeley, CO 80631 a• (970) 400-6100 (970) 304-6498 Fax 20181107 Weld County Treasurer Statement of Taxes Due Account Number R8967612 Parcel 147133100011 Legal Description PT S2N2 33 1 66 LOT D REC EXEMPT RECX20-0040 Account: R8967612 MAAN SUKHMINDER 9760 SWAN LAKE DR GRANITE BAY, CA 95746-6641 Year Tax Tax Charge Adjustments Interest Situs Address Fees Payments Balance 2020 $837.52 Total Tax c 1t:�� $0,00 $0.00 $0.00 ($837.52) $0.00 $0.00 Grand Total Due as of 05/17/2021 $0.00 Tax Billed at 2020 Rates for Tax Area 2524 - 2524 Authority WELD COUNTY SCHOOL DIST 27J CENTRAL COLORADO WATER (CCW GREATER BRIGHTON FIRE HIGH PLAINS LIBRARY Taxes Billed 2020 * Credit Levy Mill Levy 15.0380000* 48.7450000* 1.1560000 I1 7950000 3 1810000 Amount $157 61 $51085 $12.11 $123 61 $3334 79.9150000 $837 52 Values Actual Assessed AG -FLOOD $28,373 $8,230 1RRRIGATED LAND AG -DRY FARM LAND $2,474 $720 AG -MEADOW HAY $5,165 $1,500 LAND AG -WASTE LAND $94 $30 Total $36,106 $10,480 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES, CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE cni I ntA/INICr fATFQ. fPP flKI/]{ PPfIPFRTV PPM PRClPFRTV ANfl MflR1I F HfMFS - AUGUST 1 Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer are evidence that as of this date, all current and prior year taxes related to this parcel have been jd in full. Signed: Date: slii/€i Hello