September 12, 2023
To Whom it May Concern:
RECEIVED
SEP 12 2023
WELD COUNTY
COMMISSIONERS
On September 12, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
Noble Energy, Inc. - SHABLE FED T9N-R6OW-S33 L01. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polis, Governor Jill Hunsaker Ryan, MPH, Executive Director
-RA i (.�C V i,Gcc� f 1 L Cl I C -,K n b j�l I) 0
2023-2717
MYu Air Pollution Control Division
• .'4. Notice of a Proposed Project or Activity Warranting Public
-
Comment
Website Title: Noble Energy, Inc. - SHABLE FED T9N-R60W-S33 L01 - Weld County
Notice Period Begins: September 12, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Noble Energy, Inc.
Facility: SHABLE FED T9N-R60W-533 L01
Well Production Facility
NWNW quadrant of Section 33, Township 9N, Range 60W
Weld County
The proposed project or activity is as follows: Applicant requests to modify point 001 (condensate tank) to
change the permit coverage from a GP01 to an individual construction permit, adopt state emissions factors,
and lower throughput. Additionally, the applicant requests to combine points 001 and 002 into point 001
(both condensate tanks). Point 002 will be cancelled upon issuance of this permit. The facility is in the
severe ozone nonattainment area and is synthetic minor for VOC NANSR and OP programs, and CO OP.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 23WE0516 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd airpermitcomments@state.co.us
Send written comments to our mailing address:
Air Pollution Control Division - Oil Et Gas Unit
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02
1,a
COLORADO
Department of l?u6llc
Health 6 linviro It
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.