Loading...
HomeMy WebLinkAbout20232998.tiffRESOLUTION RE: APPROVE SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR23-0030, FOR A 3.6 MW SOLAR ENERGY FACILITY (SEF) IN THE A (AGRICULTURAL) ZONE DISTRICT - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board of County Commissioners held a public hearing on the 18th day of October, 2023, at the hour of 10:00 a.m., in the Chambers of the Board, for the purpose of hearing the application of Louis and Gina Fabrizius, P.O. Box 429, Eaton, Colorado 80615, cio CBEP Solar 30, LLC, P.O. Box 1255, Sterling, Colorado 80751, for a Site Specific Development Plan and Use by Special Review Permit, USR23-0030, for a 3.6 MW Solar Energy Facility (SEF) in the A (Agricultural) Zone District, on the following described real estate, being more particularly described as follows: Lot B of Recorded Exemption, RE -4980; being part of the E112 of Section 8, Township 7 North, Range 65 West of the 6th P.M., Weld County, Colorado WHEREAS, at said hearing, the applicant was present, and WHEREAS, Section 23-2-230 of the Weld County Code provides standards for review of said Use by Special Review Permit, and WHEREAS, the Board of County Commissioners heard all of the testimony and statements of those present, studied the request of the applicant and the recommendation of the Weld County Planning Commission and all of the exhibits and evidence presented in this matter and, having been fully informed, finds that this request shall be approved for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. The applicant has demonstrated that the request is in conformance with Section 23-2-230.B of the Weld County Code as follows: A. Section 23-2-230.B.1 — The proposed use is consistent with Chapter 22 and any other applicable Code provisions or ordinance in effect. 1) Section 22-2-10.C states: "Promoting Economic Growth and Stability. Land use policies have a significant impact economic conditions in the County and should be structured to encourage economic prosperity. To ensure the continued strength of Weld County's economy, land use processes and decisions based on the [Comprehensive Plan] shall be consistent and promote financially responsible growth." The Solar Energy Facility (SEF) will provide GC :plC'rp/MW/cG/MW), cACLB[B),APPL.,APPL.REP. I%/16/2.3 2023-2998 PL2893 SPECIAL REVIEW PERMIT (USR23-0030) - LOUIS AND GINA FABRIZIUS, CIO CBEP SOLAR 30, LLC PAGE 2 construction jobs and energy to Weld County, which directly supports economic prosperity. The SEF, being a power -generating facility, will add variety, stability, and redundancy to the existing electrical grid. Traditional energy resources are tied to commodity markets and can vary in demand and output. This facility can complement and support the economy during times of fluctuating energy activity. 2) Section 22-2-30.C states: "Harmonize development with surrounding land uses." The adjacent land will experience minimal impacts from the SEF. The nearest residence is located more than 500 feet from the boundaries of the SEF. The proposed facility will be set back approximately 80 feet from County Road 41 and approximately 128 feet from the south property line. B. Section 23-2-230.B.2 — The proposed use is consistent with the intent of the A (Agricultural) Zone District. 1) Section 23-3-10 — Intent, states: "Agriculture in the County is considered a valuable resource, which must be protected from adverse impacts resulting from uncontrolled and undirected business, industrial and residential land uses. The A (Agricultural) Zone District is established to maintain and promote agriculture as an essential feature of the County. The A (Agricultural) Zone District is intended to provide areas for the conduct of agricultural activities and activities related to agriculture and agricultural production, and for areas for natural resource extraction and energy development, without the interference of other, incompatible land uses." This Code Section supports the installation of the subject SEF, which is for energy development. The facility will provide power to be utilized by residences, businesses, and farming operations in Weld County. 2) Section 23-3-40.FF — Uses by Special Review, of the Weld County Code include, "Solar Energy Facilities (SEF'S), being more than five (5) acres in size, but less than 160 acres, in the Near/Urban Area, as shown on Appendix 21-B, or being more than five (5) acres, but less than 320 acres, in the Agricultural/Rural Area, as shown on Appendix 21-B." This Code Section allows the applicant to apply for the subject Solar Energy Facility, being located in the Near/Urban Area, as shown by map, in Appendix 21-B. Per Section 23-1-90 of the Weld County Code, a "Solar Energy Facility" means: "a commercial facility whose primary purpose is to supply electricity and consists of one or more solar arrays and other accessory structures, equipment, including substations, switchyards, battery storage, electrical infrastructure, generators, transmission lines, communications infrastructure, and other appurtenant structures and/or facilities." The SEF will 2023-2998 PL2893 SPECIAL REVIEW PERMIT (USR23-0030) - LOUIS AND GINA FABRIZIUS, CIO CBEP SOLAR 30, LLC PAGE 3 encumber approximately 44 acres and qualifies as a SEF USR. The USR facility will also include two (2) storage containers for construction and operation usage, being Accessory Uses, permitted by Section 23-3-30.B of the Weld County Code. The applicant is also proposing a temporary construction trailer office, during construction. Per Section 23-4-190 of the Weld County Code: "a zoning permit shall not be required for a manufactured structure in the A (Agricultural) Zone District if such structure is already shown on an approved and recorded Use by Special Review map." C. Section 23-2-230.B.3 —The uses which will be permitted will be compatible with the existing surrounding land uses. The adjacent lands consist of pastures, crops, and rural residences. The closest residence is approximately 660 feet to the south of the SEF. There are four (4) USRs within one (1) mile of the site. USR-1583, for an Ag Service Establishment (8,000 head dairy); USR-1349, for a 2,675 -Head Dairy; MUSR15-0011, for a 9,600 -Head Feedlot; and AMUSR-199, for a Feedlot are located south, southwest, and southeast of the site. The Weld County Department of Planning Services sent notice to five (5) surrounding property owners. No responses were received. A Landscape and Screening Plan was provided with the application and states that Rocky Mountain Juniper Trees will be planted along the southeastern portion of the property. A neighborhood meeting was held on Monday, August 14, 2023. Documentation was provided stating there were no attendees at the neighborhood meeting and that no neighbor correspondence was received. Based on the referral agency responses and the location of the site, the SEF is in an area that can support this development. The proposed screening, the Conditions of Approval and Development Standards will assist in mitigating the impacts of the facility on the adjacent properties and ensure compatibility with surrounding land uses and the region. D. Section 23-2-230.8.4 — The uses which will be permitted will be compatible with future development of the surrounding area, as permitted by the existing zoning, and with the future development, as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is located within the Coordinated Planning Agreement (CPA) area for the Town of Ault. The Town of Ault did not submit a Notice of Inquiry (NOI) response. The site is located within the three (3) mile referral area of the Town of Ault and no referral response 2023-2998 PL2893 SPECIAL REVIEW PERMIT (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 4 was received. The property is located outside of the Town of Ault's Future Land Use Map Planning area, as delineated in the Town of Ault Future Land Use Map. E. Section 23-2-230.6.5 — The application complies with Chapter 23, Articles V and XI, of the Weld County Code. The property is not located within the A -P (Airport) Overlay District, 1-25 Overlay District, Geologic Hazard Overlay District, MS4 - Municipal Separate Storm Sewer System area, Historic Townsites Overlay District, or Agricultural Heritage Overlay District. A small portion of the property is located within the Lone Tree Creek floodplain. The proposed SEF location is outside of the floodplain boundaries, but in the event any development occurs within the floodplain, a Flood Hazard Permit will be required. Building Permits issued on the lot will be required to adhere to the fee structure of the County -Wide Road Impact Fee, County Facility Fee, and Drainage Impact Fee Programs. F Section 23-2-230.B.6 — The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The Natural Resources Conservation Services (NRCS) Soil Survey indicates 61.4% of the property consists of (0-1% slope) Dacono clay loam and 16.1% of the site consists of (0-1% slope) Nunn clay loam. The proposed SEF will be located on these soils. Both soil types are classified as "Prime if Irrigated". The property owner provided an affidavit stating they had to rent water to have enough for agricultural purposes and that the SEF will allow the property owner to redistribute water to support their remaining agricultural land. The applicant proposes to plant a native seed mixture on the property and utilize grazing sheep to maintain the height of the vegetation from 18-22 inches. G. Section 23-2-230.6.7 — The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards can ensure that there are adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and County. This proposal has been reviewed by the appropriate referral agencies and it has been determined that the attached Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and county and will address and mitigate impacts on the surrounding area with the operation of this facility. 2023-2998 PL2893 SPECIAL REVIEW PERMIT (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 5 NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Louis and Gina Fabrizius, c/o CBEP Solar 30, LLC, for a Site Specific Development Plan and Use by Special Review Permit, USR23-0030, for a 3.6 MW Solar Energy Facility (SEF) in the A (Agricultural) Zone District, on the parcel of land described above, be, and hereby is, granted subject to the following conditions: 1. Prior to recording the map: A. The applicant shall address the requirements of the Colorado Department of Transportation (CDOT), as stated in the referral response, dated July 21, 2023. Written evidence of such shall be submitted to the Weld County Department of Planning Services. B. The applicant shall acknowledge the requirements of the Weld County Department of Building Inspection, as stated in the referral response, dated July 14, 2023. Written evidence of such shall be submitted to the Weld County Department of Planning Services. C. The applicant shall attempt to address the requirements of the Larimer and Weld Irrigation Company, as stated in the referral response, dated August 14, 2023. Written evidence of such shall be submitted to the Weld County Department of Planning Services. D. The applicant shall acknowledge the comments of the Weld County Department of Oil and Gas Energy (OGED), as stated in the referral response, dated July 25, 2023. Written evidence of such shall be provided to the Department of Planning Services. E. The Landscape and Screening Plan states that Rocky Mountain Junipers will be planted along the outside corner of the southeastern fence line and a portion of the eastern fence line, to provide natural screening for nearby residences. The height and location of the Rocky Mountain Junipers shall be identified. F. A Final Drainage Report, stamped and signed by a Professional Engineer, licensed in the State of Colorado, shall be submitted. G. The map shall be amended to delineate the following: 1) All sheets of the map shall be labeled USR23-0030. 2) The attached Development Standards. 3) The map shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. 2023-2998 PL2893 SPECIAL REVIEW PERMIT (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 6 4) The applicant shall show and label the Colorado Department of Transportation's (CDOT) access point onto State Highway 14 and the right-of-way on the map, along with the documents creating the right-of-way. 5) The applicant shall show and label the drainage flow arrows. 6) The applicant shall show and label the required setbacks, in accordance with Section 23-4-1030.C.3 of the Weld County Code. 7) Any existing and proposed solar facility installations and electrical equipment, power lines, structures, temporary work trailers, storage containers (limited to two [2], per Section 23-3-30.6 of the Weld County Code), storage areas and miscellaneous improvements, as applicable. Clearly indicate which items are temporary for use during construction and which items are permanent. 8) Required fencing, gates and any emergency and site identification signage, in accordance with Section 23-2-240.A.12 and Section 23-4-1030.C.6 of the Weld County Code. 9) On -site lighting, if applicable. All lighting shall be downcast and shielded so that light rays will not shine directly onto adjacent properties. Include lighting specification details on the USR map. Refer to Section 23-2-250.D of the Weld County Code for design criteria. 10) Proposed landscape and screening, as identified on the Landscape and Screening Plan, dated April 24, 2023, shall be delineated on the map. 11) Trash collection areas, if applicable. Section 23-2-240.A.13 of the Weld County Code addresses the issue of trash collection areas. 12) Planned oil and gas surface development areas, corridors, access roadways, etc., as part of any executed Surface Use Agreement, if applicable. 13) The applicant shall show the floodplain and floodway (if applicable) boundaries on the map. Label the floodplain boundaries with the FEMA Flood Zone and FEMA Map Panel Number or appropriate study. 2. Upon completion of Condition of Approval #1 above, the applicant shall submit one (1) electronic copy (.pdf) of the map for preliminary approval to the Weld County Department of Planning Services. Upon approval of the map the applicant shall submit a Mylar map along with all other documentation required as Conditions 2023-2998 PL2893 SPECIAL REVIEW PERMIT (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 7 of Approval. The Mylar map shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The map shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar map and additional requirements shall be submitted within 120 days from the date of the Board of County Commissioners' Resolution. The applicant shall be responsible for paying the recording fee. 3. In accordance with Appendix 5-J of the Weld County Code, should the map not be recorded within the specified timeline from the date of the Board of County Commissioners' Resolution, a $50.00 recording continuance fee shall be added for each additional three (3) month period. 4. Prior to Construction: A. If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required. B. If there is any disturbance/construction in the floodplain a Floodplain Development Permit is required. C. The applicant shall submit an irrevocable standby letter of credit, bond, or alternate form of security in an amount sufficient to fund the estimated decommissioning/reclamation costs required by Section 23-4-1030.6.4 of the Weld County Code, for acceptance and approval by the Weld County Board of County Commissioners. Once approved, the Decommissioning and Reclamation Plan shall be updated to include the approved security information. 5. The Use by Special Review is not perfected until the Conditions of Approval are completed and the map is recorded. Activity shall not occur, nor shall any building or electrical permits be issued on the property, until the Use by Special Review map is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement. 2023-2998 PL2893 SPECIAL REVIEW PERMIT (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 8 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 18th day of October, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: d.,t4/O� Weld County Clerk to the Board B. ll1. Deputy Clerk to the Board County Attorney Date of signature: 1110412-3 Mi. - -eman, Chair Perry L. B k, Pro-Tem 2023-2998 PL2893 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC USR23-0030 1 Site Specific Development Plan and Use by Special Review Permit, USR23-0030, is for a 3.6 MW Solar Energy Facility (SEF) in the A (Agricultural) Zone District, subject to the Development Standards stated hereon. 2. Approval of this plan may create a vested property right, pursuant to Section 23-8-10 of the Weld County Code. 3. The Use by Special Review Permit shall be valid for three (3) years from the date of approval. If the site is not selected for being a participant in any community solar program the permit shall expire on the anniversary date of Board of County Commissioners approval. 4. Any future structures or uses onsite must obtain the appropriate Zoning and Building Permits. 5. The facility is unmanned and will operate year-round. Limited maintenance personnel may visit the site, once operational. 6. Height limitation. Ground -mounted solar collectors shall not exceed 25 feet in height, measured from the highest natural grade below each solar panel, to the highest extent of the solar panel rotation. 7 Glare. The SEF shall be placed so that concentrated solar glare from its solar collectors will not be directed toward, or onto, nearby properties or roadways, at any time of the day. 8. Setbacks. The Improved Area of the SEF shall conform to the setback requirements of the underlying zone. Additionally, the improved area must be at least 500 feet from existing residential buildings and residential lots of a platted subdivision or planned unit development. The residential setback requirement may be reduced if appropriate screening through landscape or an opaque fence is installed, or upon submittal to Weld County of a waiver or informed consent signed, by the residence owner, agreeing to the lesser setback. If landscaping or opaque fencing is substituted for the setback, a Landscaping Plan or Fencing Plan shall first be submitted to, and approved by, the Department of Planning Services, per Section 23-4-1030.C.3 of the Weld County Code, as amended. 9. Dust mitigation. The operators of the SEF shall continuously employ the practices for control of fugitive dust, detailed in the accepted Dust Mitigation Plan, per Section 23-4-1030.C.4 of the Weld County Code, as amended. 10. Underground cables. All electrical cables on the improved area shall be buried, except for direct current string wires that connect between solar collectors, and direct current collection circuits between rows of solar arrays that are no more than four (4) feet above 2023-2998 PL2893 DEVELOPMENT STANDARDS (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 2 grade crossings, substations, switchyards, and circuit voltages greater than 34.5 kilovolts, where necessary. 11. Fencing. The SEF shall be enclosed with a security fence, as accepted, pursuant to the Fencing Plan, as presented in the application materials. Appropriate signage shall be placed upon such fencing that warns the public of the high voltage therein. 12. Stormwater management. The Operator of the SEF shall comply with the approved Final Drainage Report and the required Storm Drainage Criteria pursuant to Chapter 8, Article XI of the Weld County Code. Ground -mounted solar collector systems shall be exempt from impervious surface calculations if the soil under the collectors is designated hydrologic A or B soil groups, by the Natural Resources Conservation Service (NRCS). 13. Existing irrigation systems. The nature and location or expansion of the SEF must not unreasonably interfere with any irrigation systems on, or adjacent to, the solar facility, per Section 23-4-1030.C.9 of the Weld County Code, as amended. 14. Decommissioning. The site shall adhere to the accepted Decommissioning and Reclamation Plan. Weld County shall have the right to draw upon the irrevocable standby letter of credit, or other form of financial security, to pay for decommissioning in the event that the holder has not commenced decommissioning and reclamation activities within 90 days of the Board of County Commissioners' order or Resolution directing decommissioning and reclamation. 15. The site shall be maintained in accordance with accepted Property Maintenance Plan. 16. All signs shall adhere to Chapter 23, Article IV, and Division 2 of the Weld County Code. 17. Landscaped areas shall be maintained by the owner/tenant of the property, including landscaped areas within the adjacent right-of-way. Maintenance shall include, but not be limited to, irrigating, mowing, pruning, removal of trash and weeds, and the replacement of any required plantings that become diseased infested, or otherwise unhealthy, shall be replaced within the growing season or next calendar year, whichever occurs sooner. 18. The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Articles I and II, of the Weld County Code. 19. The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off -site tracking. 20. The historical flow patterns and runoff amounts on the site will be maintained. 21. During construction, all liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, C.R.S. §30-20-100.5) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2023-2998 PL2893 DEVELOPMENT STANDARDS (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 3 22. During construction, no permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, C.R.S. §30-20-100.5. 23. During construction, waste materials shall be handled, stored, and disposed of in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The facility shall operate in accordance with Chapter 14, Article I of the Weld County Code. 24. Fugitive dust and fugitive particulate emissions shall be controlled throughout the duration of construction and operation of the facility. 25. During construction, adequate toilet facilities and handwashing units shall be provided. Portable toilets shall be serviced by a cleaner licensed in Weld County, contain hand sanitizers, be screened from public view, and removed when construction is completed. 26. The facility shall comply with the Air Pollution Emission Notice (APEN) permit requirements, as stipulated by the Air Pollution Control Division of the Colorado Department of Public Health and Environment, as applicable. 27. The facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone, as delineated in C.R.S. §25-12-103. 28. The operation shall comply with all applicable rules and regulations of state and federal agencies and the Weld County Code. 29. A Flood Hazard Development Permit is required for all construction or development occurring in the floodplain or floodway, as delineated on Federal Emergency Management Agency (FEMA) FIRM Community Panel Map #08123C -1250E, with an effective date of January 20, 2016 (Lone Tree Creek Floodplain). Any development shall comply with all applicable Weld County requirements, Colorado Water Conservation Board requirements, as described in Rules and Regulations for Regulatory Floodplains in Colorado, and FEMA regulations and requirements, as described in 44 CFR parts 59, 60, and 65. The FEMA definition of development is any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. (Department of Planning Services - Floodplain) 2. FEMA's floodplain boundaries may be updated at any time by FEMA. Prior to the start of any development activities, the owner should contact Weld County to determine if the floodplain boundaries have been modified. 30. Lighting shall be maintained in accordance with the approved Lighting Plan. 31. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties. Sources of light should not cause a nuisance or interfere with the use on the adjacent properties in accordance with the map. Neither the direct, nor reflected, light from any light source may create a traffic hazard to operators of motor vehicles on public or 2023-2998 PL2893 DEVELOPMENT STANDARDS (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 4 private streets. No colored lights may be used, which may be confused with, or construed as, traffic control devices. 32. Building Permits may be required for any new construction, set up of manufactured structures, or change of use of existing buildings, per Section 29-3-10 of the Weld County Code. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently, the following has been adopted by Weld County: 2018 International Building Codes, 2018 International Energy Code, 2020 National Electrical Code, and Chapter 29 of the Weld County Code. A Building Permit application must be completed and two (2) complete sets of engineered plans, bearing the wet stamp of a Colorado registered architect or engineer, must be submitted for review. A Geotechnical Engineering Report, performed by a Colorado registered engineer, or an Open Hole Inspection shall be required. A Building Permit must be issued prior to the start of construction. 33. Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Facility Fee, County -Wide Road Impact Fee, and Drainage Impact Fee Programs. 34. The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code. 35. All buildings shall comply with the setback from oil and gas wells, per Section 23-4-700, as amended. 36. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. 37. The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards, as shown or stated, shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 38. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 39. Construction or use pursuant to approval of a Use by Special Review Permit shall be commenced within three (3) years from the date of Board of County Commissioners signed Resolution, unless otherwise specified by the Board of County Commissioners 2023-2998 PL2893 DEVELOPMENT STANDARDS (USR23-0030) - LOUIS AND GINA FABRIZIUS, C/O CBEP SOLAR 30, LLC PAGE 5 when issuing the original Permit, or the Permit shall be vacated. The Director of the Department of Planning Services may grant an extension of time, for good cause shown, upon a written request by the landowner. 40. A Use by Special Review shall terminate when the use is discontinued for a period of three (3) consecutive years, the use of the land changes or the time period established by the Board of County Commissioners through the approval process expires. The landowner may notify the Department of Planning Services of a termination of the use, or Planning Services staff may observe that the use has been terminated. When either the Department of Planning Services is notified by the landowner, or when the Department of Planning Services observes that the use may have been terminated, the Planner shall send certified written notice to the landowner asking that the landowner request to vacate the Use by Special Review Permit. 41. RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal. Under Title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the state's commercial mineral deposits are essential to the state's economy; (b) the populous counties of the state face a critical shortage of such deposits; and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state. Mineral resource locations are widespread throughout the County and people moving into these areas must recognize the various impacts associated with this development. Oftentimes, mineral resource sites are fixed to their geographical and geophysical locations. Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource. 42. The Weld County Right to Farm Statement, as it appears in Section 22-2-30.A.4.a of the Weld County Code, shall be placed on the map and recognized at all times. 2023-2998 PL2893 Hello