Loading...
HomeMy WebLinkAbout20232999.tiffRESOLUTION USR23-0030 Louis and Gina Fabnzius do CBEP Solar 30, LLC Page 2 uncontrolled and undirected business, industrial and residential land uses The A (Agricultural) Zone District is established to maintain and promote agriculture as an essential feature of the County The A (Agricultural) Zone District is intended to provide areas for the conduct of agricultural activities and activities related to agriculture and agricultural production, and for areas for natural resource extraction and energy development, without the interference of other, incompatible land uses " This code section supports the installation of the subject Solar Energy Facility, which is an energy development The facility will provide power to be utilized by residences, businesses and farming operations in Weld County Section 23-3-40 FF — Uses by special review, of the Weld County Code includes, "Solar Energy Facilities (SEF'S), being more than five (5) acres in size but less than one -hundred sixty (160) acres in the Near/Urban Area as shown on Appendix 21-B, or being more than five (5) acres but less than three -hundred twenty (320) acres in the Ag/Rural Area as shown on Appendix 21-B " This code section allows the applicant to apply for the subject Solar Energy Facility, being located in the Near/Urban Area as shown by map in Appendix 21-B Per Section 23-1-90 of the Weld County Code, a "Solar Energy Facility" means "a commercial facility whose primary purpose is to supply electricity and consists of one or more solar arrays and other accessory structures, equipment, including substations, switchyards, battery storage, electrical infrastructure, generators, transmission lines, communications infrastructure, and other appurtenant structures and/or facilities " The SEF will encumber approximately forty-four (44) acres and qualifies as an SEF USR This USR facility will also include two (2) storage containers for construction and operation usage, being Accessory Uses, permitted by Section 23-3-30 B of the Weld County Code Also, the applicant is also proposing a temporary construction trailer office during construction Per Section 23-4-190 of the Weld County Code "a zoning, permit shall not be required for a manufactured structure in the A (Agricultural) Zone District if such structure is already shown on an approved and recorded Use by Special Review map" C Section 23-2-220 A 3 -- The uses which will be permitted will be compatible with the existing surrounding land uses The adjacent lands consist of pastures, crops, and rural residences The closest residence is approximately 660 -feet to the south of the solar facility There are four (4) USRs within one mile of the site USR-1583 for an Ag Service Establishment (8,000 head dairy), USR-1349 (2,675 head dairy), MUSR15-0011 (9,600 head feedlot) and AMUSR-199 (feedlot) are located south, southwest and southeast of the site The Weld County Department of Planning Services sent notice to five (5) Surrounding Property Owners No referral responses have been received RESOLUTION USR23-0030 Louis and Gina Fabnzius c/o CBEP Solar 30, LLC Page 3 A Landscape and Screening Plan was provided with the application and states that Rocky Mountain Juniper Trees will be planted along the southeastern portion of the property The applicant stated that a neighborhood meeting was held on Monday, August 14, 2023, at the Greeley Recreation Center Documentation was provided stating that there were no attendees at the neighborhood meeting and that no neighbor correspondence was provided Based on the referral agency responses and the location of the site, the SEF is in an area that can support this development and the proposed screening, the Development Standards, and the Conditions of Approval will assist in mitigating the impacts of the facility on the adjacent properties and ensure compatibility with surrounding land uses and the region D Section 23-2-220 A 4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities The site is located within the Coordinated Planning Agreement Area (CPA) for the Town of Ault As part of the pre -application process a Notice of Inquiry (NO I) The Town of Ault did not submit a Notice of Inquiry response The site is located within the three (3) mile referral area of the Town of Ault No referral response was received The property is located outside of the Town of Ault Future Land Use Map Planning area as delineated in the Town of Ault Future Land Use Map E Section 23-2-220 A 5 -- The application complies with Chapter 23, Articles V and XI, of the Weld County Code The property is not located within the A -P (Airport) Overlay District, I-25 Overlay District, Geologic Hazard Overlay District, MS4 - Municipal Separate Storm Sewer System area, Historic Townsites Overlay District, or Agricultural Heritage Overlay District A small portion of the property is located within the Lone Tree Creek floodplain The proposed Solar Energy Facility location is outside of the floodplain boundaries in the event any development occurs within the floodplain a flood hazard permit will be required Building Permits issued on the lot will be required to adhere to the fee structure of the County- Wide Road Impact Fee Program Building Permits issued on the proposed lot will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee Programs RESOLUTION USR23-0030 Louis and Gina Fabrizius c/o CBEP Solar 30, LLC Page 4 F Section 23-2-220 A 6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use The Natural Resources Conservation Services (NRCS) Soil Survey indicates that 61 4% of the property consists of (0-1% slope) Dacono clay loam and 16 1% of the site consists of (0-1% slope) Nunn clay loam The proposed solar facility would be located on these soils Both soil types are classified as "Prime if Irrigated" The property owner provided an affidavit stating that the property has had to rent water to have enough for agricultural purposes rights and that the solar array will allow the property owner to redistribute water to support their remaining agricultural land The applicant proposes to plant a native seed mixture on the property and utilize grazing sheep to maintain the height of the vegetation from 18-22 inches G Section 23-2-220 A 7 — There is adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and County The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards can ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County This proposal has been reviewed by the appropriate referral agencies and it has been determined that the attached conditions of approval and development standards ensure that there are adequate provisions for the protection of the health, safety and welfare of the inhabitants of the neighborhood and county and will address and mitigate impacts on the surrounding area with the operation of this facility This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities The Planning Commission recommendation for approval is conditional upon the following 1 Prior to recording the map A The applicant shall address the requirements of the Colorado Department of Transportation (CDOT), as stated in the referral response dated July 21, 2023 Written evidence of such shall be submitted to the Weld County Department of Planning Services (CDOT) B The applicant shall acknowledge the requirements of the Weld County Department of Building Inspection, as stated in the referral response dated July 14, 2023 Written evidence of such shall be submitted to the Weld County Department of Planning Services (Building Inspection) C The applicant shall attempt to address the requirements of the Lanmer & Weld Irrigation Company as stated in their referral response dated August 14, 2023 Written evidence of such shall be submitted to the Weld County Department of Planning Services (Lamer & Weld Irrigation Company) RESOLUTION USR23-0030 Louis and Gina Fabrizws c/o CBEP Solar 30, LLC Page 5 D The applicant shall acknowledge the comments of the Weld County Oil & Gas Energy Department (OGED) as stated in their referral dated July 25, 2023 Written evidence of such shall be provided to the Department of Planning Services (OGED) E The landscape and screening plan states that Rocky Mountain Junipers will be planted along the outside corner of the southeastern fence line and a portion of the eastern fence line to provide natural screening for nearby residences The height and location of the Rocky Mountain Junipers shall be identified (Department of Planning Services) F A Final Drainage Report, stamped and signed by a professional engineer licensed in the State of Colorado shall be submitted G The map shall be amended to delineate the following 1 All sheets of the map shall be labeled USR23-0030 (Department of Planning Services) 2 The attached Development Standards (Department of Planning Services) 3 The map shall be prepared in accordance with Section 23-2-260 D of the Weld County Code (Department of Planning Services) 4 Show the Colorado Department of Transportation (CDOT) access point onto SH 14 and the right-of-way on the map along with the documents creating the right-of-way (Development Review) 5 Show and label the drainage flow arrows (Development Review) 6 Show and label the required setbacks, in accordance with Section 23-4- 1030 C 3 of the Weld County Code (Department of Planning Services) 7 Any existing and proposed solar facility installations and electrical equipment, power lines, structures, temporary work trailers, storage containers (limited to two (2) per Section 23-3-30 B of the Weld County Code), storage areas and miscellaneous improvements, as applicable Clearly indicate which items are temporary for use during construction and which items are permanent (Department of Planning Services) 8 Required fencing, gates and any emergency and site identification signage, in accordance with Section 23-2-240 A 12 and Section 23-4-1030 C 6 of the Weld County Code (Department of Planning Services) 9 On -site lighting, if applicable All lighting shall be downcast and shielded so that light rays will not shine directly onto adjacent properties Include lighting specification details on the USR map Refer to Section 23-2-250 D of the Weld County Code for design criteria (Department of Planning Services) RESOLUTION USR23-0030 Louis and Gina Fabrizius do CBEP Solar 30, LLC Page 6 10 Proposed landscape and screening (as identified on the Landscape and Screening Plan dated April 24, 2023, shall be delineated on the map (Department of Planning Services) 11 Trash collection areas, if applicable Section 23-2-240 A 13 of the Weld County Code addresses the issue of trash collection areas (Department of Planning Services) 12 Planned oil and gas surface development areas, corridors, access roadways, etc as part of any executed Surface Use Agreement, if applicable (Department of Planning Services) 13 Show the floodplain and floodway (if applicable) boundaries on the map Label the floodplain boundaries with the FEMA Flood Zone and FEMA Map Panel Number or appropriate study (Department of Planning Services - Floodplain) 2 Upon completion of Condition of Approval #1 above, the applicant shall submit one (1) electronic copy ( pdf) of the map for preliminary approval to the Weld County Department of Planning Services Upon approval of the map the applicant shall submit a Mylar map along with all other documentation required as Conditions of Approval The Mylar map shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services The map shall be prepared in accordance with the requirements of Section 23-2-260 D of the Weld County Code The Mylar map and additional requirements shall be submitted within one hundred twenty (120) days from the date of the Board of County Commissioners Resolution The applicant shall be responsible for paying the recording fee (Department of Planning Services) 3 In accordance with Appendix 5-J of the Weld County Code, should the map not be recorded within the specified timeline from the date of the Board of County Commissioners Resolution, a $50 00 recording continuance fee shall be added for each additional 3 -month period (Department of Planning Services) 4 Prior to Construction A If more than one (1) acre is to be disturbed, a Weld County Grading Permit will be required (Development Review) B If there is any disturbance/construction in the floodplain a Floodplain Development Permit is required (Department of Planning Services - Floodplain) C The applicant shall submit an irrevocable standby letter of credit, bond, or alternate form of security in an amount sufficient to fund the estimated decommissioning/reclamation costs required by Section 23-4-1030 B 4 of the Weld County Code, for acceptance and approval by the Weld County Board of County Commissioners Once approved, the Decommissioning and Reclamation Plan shall be updated to include the approved security information (Department of Planning Services) 5 The Use by Special Review is not perfected until the Conditions of Approval are completed and the map is recorded Activity shall not occur, nor shall any building or electrical permits be RESOLUTION USR23-0030 Louis and Gina Fabrizius c/o CBEP Solar 30, LLC Page 7 issued on the property, until the Use by Special Review map is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement (Department of Planning Services) Motion seconded by Michael Palizzi VOTE For Passage Elijah Hatch Skip Holland Butch White Pamela Edens Michael Wailes Michael Palizzi Virginia Guderjahn Barney Hammond Against Passage Absent Shana Morgan The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioners for further proceedings Certification of Copy I, Michelle Wall, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on October 3, 2023 Dated the 3rd day of October 2023 -tneffidee. ,„ r,iai-e- Michelle Wall Secretary RESOLUTION USR23-0030 Louis and Gina Fabrizius c/o CBEP Solar 30, LLC Page 8 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Lows and Gina Fabrizius c/o CBEP Solar 30, LLC USR23-0030 A Site Specific Development Plan for a 3 6 MW Solar Energy Facility (SEF) outside of subdivisions and historic townsites in the A (Agricultural) Zone District, subject to the Development Standards stated hereon (Department of Planning Services) 2 Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code (Department of Planning Services) 3 The Use by Special Review Permit shall be valid for three (3) years from the date of approval If the site Is not selected for being a participant in any community solar program the permit shall expire on the anniversary date of Board of County Commissioners approval (Department of Planning Services) 4 Any future structures or uses on site must obtain the appropriate zoning and building permits (Department of Planning Services) 5 The facility Is unmanned and will operate year-round Limited maintenance personnel may visit the site once operational (Department of Planning Services) 6 Height limitation Ground -mounted solar collectors shall not exceed twenty-five (25) feet in height, measured from the highest natural grade below each solar panel to the highest extent of the solar panel rotation (Department of Planning Services) 7 Glare The SEF shall be placed so that concentrated solar glare from its solar collectors will not be directed toward or onto nearby properties or roadways at any time of the day (Department of Planning Services) 8 Setbacks The Improved Area of the SEF shall conform to the setback requirements of the underlying zone Additionally, the improved area must be at least five hundred (500) feet from existing residential buildings and residential lots of a platted subdivision or planned unit development The residential setback requirement may be reduced if appropriate screening through landscape or an opaque fence is installed, or upon submittal to Weld County of a waiver or informed consent signed by the residence owner agreeing to the lesser setback If landscaping or opaque fencing is substituted for setback, a landscaping plan or fencing plan shall first be submitted to and approved by the Department of Planning Services per Section 23-4-1030 C 3 of the Weld County Code, as amended (Department of Planning Services) 9 Dust mitigation The operators of the SEF shall continuously employ the practices for control of fugitive dust detailed in their accepted Dust Mitigation Plan per Section 23-4-1030 C 4 of the Weld County Code, as amended (Department of Planning Services) 10 Underground cables All electrical cables on the improved area shall be buried, except for direct current string wires that connect between solar collectors, direct current collection RESOLUTION USR23-0030 Louis and Gina Fabnzius c/o CBEP Solar 30, LLC Page 9 circuits between rows of solar arrays that are no more than four (4) feet above grade crossings, substations, switchyards, and circuit voltages greater than 34 5 kilovolts (where necessary) (Department of Planning Services) 11 Fencing The SEF shall be enclosed with a security fence as accepted pursuant to the Fencing Plan as presented in the application materials Appropriate signage shall be placed upon such fencing that warns the public of the high voltage therein (Department of Planning Services) 12 Stormwater management The Operator of the SEF shall comply with the approved Final Drainage Report and the required Storm Drainage Criteria pursuant to Chapter 8, Article XI of this Code Ground- mounted solar collector systems shall be exempt from impervious surface calculations if the soil under the collectors is designated hydrologic A or B soil groups by the Natural Resources Conservation Service (NRCS) (Department of Planning Services) 13 Existing irrigation systems The nature and location or expansion of the SEF must not unreasonably interfere with any irrigation systems on or adjacent to the solar facility per Section 23-4-1030 C 9 of the Weld County Code, as amended (Department of Planning Services) 14 Decommissioning The site shall adhere to the accepted Decommissioning and Reclamation Plan Weld County shall have the right to draw upon the irrevocable standby letter of credit, or other form of financial security, to pay for decommissioning in the event that the holder has not commenced decommissioning and reclamation activities within ninety (90) days of the Board of County Commissioners' order or resolution directing decommissioning and reclamation (Department of Planning Services) 15 The site shall be maintained in accordance with accepted Property Maintenance Plan (Department of Planning Services) 16 All signs shall adhere to Chapter 23, Article IV, and Division 2 of the Weld County Code (Department of Planning Services) 17 Landscaped areas shall be maintained by the owner/tenant of the property, including landscaped areas within the adjacent right-of-way Maintenance shall include, but not be limited to, irrigating, mowing, pruning, removal of trash and weeds, and replacement of any required plantings that become diseased infested or otherwise unhealthy shall be replaced within the growing season or next calendar year whichever occurs sooner (Department of Planning Services) 18 The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code (Development Review) 19 The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off -site tracking (Development Review) 20 The historical f low patterns and runoff amounts on the site will be maintained (Development Review) RESOLUTION USR23-0030 Louis and Gina Fabnzius c/o CBEP Solar 30, LLC Page 10 21 During construction, all liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100 5, C R S ) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination (Department of Public Health and Environment) 22 During construction, no permanent disposal of wastes shall be permitted at this site This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100 5, C R S (Department of Public Health and Environment) 23 During construction, waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions The facility shall operate in accordance with Chapter 14, Article 1 of the Weld County Code (Department of Public Health and Environment) 24 Fugitive dust and fugitive particulate emissions shall be controlled throughout the duration of construction and operation of the facility (Department of Public Health and Environment) 25 During construction, adequate toilet facilities and handwashing units shall be provided Portable toilets shall be serviced by a cleaner licensed in Weld County, contain hand sanitizers, be screened from public view, and removed when construction is completed (Department of Public Health and Environment) 26 The facility shall comply with the Air Pollution Emission Notice (A P E N ) permit requirements as stipulated by the Air Pollution Control Division, Colorado Department of Public Health and Environment, as applicable (Department of Public Health and Environment) 27 The facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone as delineated in 25-12-103 C R S (Department of Public Health and Environment) 28 The operation shall comply with all applicable rules and regulations of State and Federal agencies and the Weld County Code (Department of Public Health and Environment) 29 A Flood Hazard Development Permit is required for all construction or development occurring in the floodplain or floodway as delineated on Federal Emergency Management Agency (FEMA) FIRM Community Panel Map #08123C -1250E effective date will be January 20, 2016 (Lone Tree Creek Floodplain) Any development shall comply with all applicable Weld County requirements, Colorado Water Conservation Board requirements as described in Rules and Regulations for Regulatory Floodplains in Colorado, and FEMA regulations and requirements as described in 44 CFR parts 59, 60, and 65 The FEMA definition of development is any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials (Department of Planning Services - Floodplain) 2 FEMA's floodplain boundaries may be updated at any time by FEMA Prior to the start of any development activities, the owner should contact Weld County to determine if the floodplain boundaries have been modified (Department of Planning Services - Floodplain) 30 FEMA's floodplain boundaries may be updated at any time by FEMA Prior to the start of any RESOLUTION USR23-0030 Louis and Gina Fabrizius c/o CBEP Solar 30, LLC Page 11 development activities, the owner should contact Weld County to determine if the floodplain boundaries have been modified (Department of Planning Services - Floodplain) 31 Lighting shall be maintained in accordance with the approved Lighting Plan (Department of Planning Services) 32 Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties Sources of light should not cause a nuisance or interfere with the use on the adjacent properties in accordance with the map Neither the direct, nor reflected, light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets No colored lights may be used which may be confused with, or construed as, traffic control devices (Department of Planning Services) 33 Building permits maybe required, for any new construction, setup of manufactured structures, or change of use of existing buildings per Section 29-3-10 of the Weld County Code Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application Currently the following has been adopted by Weld County 2018 International Building Codes, 2018 International Energy Code, 2020 National Electrical Code, and Chapter 29 of the Weld County Code A Budding Permit Application must be completed and two (2) complete sets of engineered plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review A Geotechnical Engineering Report, performed by a Colorado registered engineer, shall be required or an Open Hole Inspection A building permit must be issued prior to the start of construction (Department of Building Inspection) 34 Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Facility Fee, County -Wide Road Impact Fee, and Drainage Impact Fee Programs 35 The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code (Department of Planning Services) 36 All buildings shall comply with the setback from oil and gas wells per Section 23 -4-700, as amended 37 Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations (Department of Planning Services) 38 The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations Substantial changes from the plans or Development Standards, as shown or stated, shall require the approval of an amendment -of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted Any other changes shall be filed in the office of the Department of Planning Services (Department of Planning Services) RESOLUTION USR23-0030 Louis and Gina Fabnzius c/o CBEP Solar 30, LLC Page 12 39 The property owner or operator shall be responsible for complying with all of the foregoing Development Standards Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners (Department of Planning Services) 40 Construction or use pursuant to approval of a Use by Special Review Permit shall be commenced within three (3) years from the date of Board of County Commissioners signed Resolution, unless otherwise specified by the Board of County Commissioners when issuing the original Permit, or the Permit shall be vacated 41 A Use by Special Review shall terminate when the USE is discontinued for a period of three (3) consecutive years, the USE of the land changes or the time period established by the Board of County Commissioners through the approval process expires The landowner may notify the Department of Planning Services of a termination of the USE, or Planning Services staff may observe that the USE has been terminated When either the Department of Planning Services is notified by the landowner, or when the Department of Planning Services observes that the USE may have been terminated, the Planner shall send certified written notice to the landowner asking that the landowner request to vacate the Use by Special Review Permit 42 RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the state's commercial mineral deposits are essential to the state's economy, (b) the populous counties of the state face a critical shortage of such deposits, and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state Mineral resource locations are widespread throughout the County and people moving into these areas must recognize the various impacts associated with this development Often times, mineral resource sites are fixed to their geographical and geophysical locations Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource 43 WELD COUNTY'S RIGHT TO FARM STATEMENT Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long - standing agricultural practices and a lower level of services than in town Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever Agricultural users of the land should not be expected to change their long -established agricultural practices to accommodate the intrusions of urban users into a rural area Well -run agricultural activities will generate off -site impacts, including noise from tractors and equipment, slow -moving farm vehicles on rural roads, dust from animal pens, field work, RESOLUTION USR23-0030 Louis and Gina Fabr¢ws c/o CBEP Solar 30, LLC Page 13 harvest and gravel roads, odor from animal confinement, silage and manure, smoke from ditch burning, flies and mosquitoes, hunting and trapping activities, shooting sports, legal hazing of nuisance wildlife, and the use of pesticides and fertilizers in the fields, including the use of aerial spraying It is common practice for agricultural producers to -utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County Section 35-3 5-102, C R S , provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production Water has been, and continues to be, the lifeline for the agricultural community It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and county roads outside of municipalities The sheer magnitude of the area to be served stretches available resources -Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and f ire Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm Services in rural areas, in many cases, will not be equivalent to municipal services Rural dwellers must, by necessity, be more self -sufficient than urban dwellers People are exposed to different hazards in the County than in an urban or suburban setting Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sandburs, puncture vines, territorial farm dogs and livestock, and open burning present real threats Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood Motion Forward Case USR23-0030 to the Board of County Commissioners along with the Conditions of Approval and Development Standards with the Planning Commission's recommendation of approval, Moved by Butch White, Seconded by Michael Pahzzi Vote Motion carried by unanimous roll call vote (summary Yes = 8) Yes Barney Hammond, Butch White, Elijah Hatch, Michael Pahzzi, Michael Wailes, Pamela Edens, Skip Holland, Virginia Guderjahn The Chair asked the public if there were other items of business that they would like to discuss No one wished to speak The Chair asked the Planning Commission members if there was any new business to discuss No one wished to speak Meeting adjourned at 6 02 pm Respectfully submitted, emcee, c, u,el-e- Michelle Wall Secretary Hello