HomeMy WebLinkAbout20230613.tiff�/ill� -r r +1•
a
COLORADO
Department of Public
Health b Environment
Weld County - Clerk to the Board
1150O St
PO Box 758
Greeley, CO 80632
February 15, 2023
To Whom it May Concern:
RECEIVED
FEB 15 2023
WCOUNTY
COMMISSIONERS
On February 15, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for
PED Energy, Inc. - Ram Land 30K-123, 403; 30O-303, 443. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
P06i;c Rev,e-,„1
03/06/23
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
cc: Pi- (TP/MO, HL (Ds), OG(m\
Pu(cH/ER/cK/DD/ON)
03/01/23
2023-0613
Notice of a Proposed Project or Activity Warranting Public
a Comment
Air Pollution Control Division
Website Title: PED Energy, Inc. - Ram Land 30K-123, 403; 30O-303, 443 - Weld County
Notice Period Begins: February 15, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PED Energy, Inc.
Facility: Ram Land 30K-123, 403; 30O-303, 443
Well production facility where initial construction permits 22WE0268 is being
established for the following equipment: condensate storage tanks.
NWSW quadrant of Section 30, Township 4N, Range 66W
Weld County
The proposed project or activity is as follows: Operator requested the initial construction permits for
condensate storage tanks currently permitted under General Permit 01 coverage. Also, new throughput of
condensate tanks is requested. This facility will be considered new synthetic minor of VOC by
reclassification on 11/07/2022 through this project.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application; the Division's analysis, and a draft of Construction Permit 22WE0268 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission.' The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe_apcd_airpermitcomments@state.co.us
• Send comments to our mailing address:
Andrew Lee
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02
1 AO
COLORADO
v�
Heakh 6 Environment
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02
arelDCOLORADO
2epartment of Public
Health F Envlronnunt
Hello