HomeMy WebLinkAbout20232048.tiffRESOLUTION RE: REGULATING, WARNING, AND GUIDING TRAFFIC DURING EXTENSION OF EMERGENCY TEMPORARY CLOSURE OF COUNTY ROAD 8 BETWEEN COUNTY ROADS 49 AND 51 FOR APPROXIMATELY AN ADDITIONAL TWO (2) WEEKS, FOR UNANTICIPATED SUPPLY CHAIN DELAYS AND HIGH IRRIGATION WATER LEVELS WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, on the 28th day of June, 2023, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board determined that conditions existed which made it necessary to temporarily close County Road 8, between County Roads 49 and 51, to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, with said closure being effective June 26, 2023, for approximately one (1) month, through July 31, 2023, for a culvert replacement due to flooding, and WHEREAS, on the 19th day of July, 2023, pursuant to said statute and upon the basis of traffic and personnel investigations, the Board has determined that conditions continue to exist which make it necessary to extend said temporary closure of County Road 8, between County Roads 49 and 51, with said extended closure being effective July 31, 2023, for approximately an additional two (2) weeks through August 11, 2023, for unanticipated supply chain delays and high irrigation water levels, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. CC:So(R5), P Sp0i-ct. CSP O1(2Si /23 2023-2048 EG0024 EXTEND TEMPORARY CLOSURE - COUNTY ROAD 8 PAGE 2 BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the closure of County Road 8, between County Roads 49 and 51, be, and hereby is, extended, with said extended closure being effective July 31, 2023, for approximately an additional two (2) weeks through August 11, 2023, for unanticipated supply chain delays and high irrigation water levels, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 19th day of July, A.D., 2023. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: Weld County Clerk to the Board BY: jyH( . LJebwrtb Deputy Clerk to the Board APP an rD AS T ttorney Date of signature: (221 ' Z, Mike Per L. Buoy(, Pro-Tem sine 2023-2048 EG0024 MEMORANDUM TO: Clerk to the Board DATE: July 17, 2023 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting approval from the board for an extension for the closure on WCR 8 between WCR 49 and WCR 51. The original closure dates were June 26, 2023, through July 31, 2023. Public Works would like to extend this project to open on August 11, 2023, due to supply chain delays in purchasing the culvert as well as irrigation water levels being too high for the work to be completed. See attached closure diagram. 2023-2048 7/19 ECI 0024 www.invarion.com AL - i J-' r • -TT*- i i l■ a a. rrirnr 1 _ -r a a -1111-4-4- W20-1F 1 d 1 i 1 I q a I i r 4 Me mi. ‘Cl —L-•-- J� M4-9 sate.i-...ilia-111-111- • • • a a i / 1 4 I I I a +.f r • • ref a Or r dB 44110•1111r �n ,'orZ o 0 D T'mQ -4O \Ai 2 W20-3 $ ri aci 1 • W20 -1F .a a a a aan sr • a a -a-a-0- a•• a / 1 1 1 f t rw r ra -a- t1 • 1 r Z• p p a M4 - a • .. p t a -b L..•a;•_S.0 a a - - - SOAPS C tart, IIeWINV-T-ra i 111 —IL P_ 1 • • • 41-•-•-E • • • .. i-... • ..-a-a... • ■ aay-D-1 PROJECT # Emergency Closure ROAD CLOSURE DESCRIPTION WCR closed for washed 8 6/26/2023 between out culvert WCR thru 49 8/11/2023 and WCR 51 NOTICE TO PUBLIC Road signs and barricaded DETOUR ROUTE WCR SH 49 52 between between WCR WCR 8 49 and and SH WCR 52 2 53 2 mile mile gravel paved NOTES ADT Culverts of WCR replaced is: No is irrigation: Count Prepared 6/26/2023 by: Ryan Reynolds Hello