March 1, 2023
To Whom it May Concern:
RECEIVED
MAR 01 2023
COMMISSIONERS
On March 1, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC
Energy, Inc. - Becker Ranch 5MRU Pads 3 Et 4. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
Pub I;G. Rev;e-c)
o3/I$ /23
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
cc: PI.(TP/MN), Ht.. (Ds), o6(st-t)
PI ) (cri/ER/CK/oo/DN)
03/,3(23
2023-0711
Ntief
Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: PDC Energy, Inc. - Becker Ranch 5MRU Pads 3 Et 4 - Weld County
Notice Period Begins: March 1, 2023
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc.
Facility: Becker Ranch 5MRU Pads 3 a 4
Well Production Facility
NENE of Section 5, Township 3N, Range 64W
Weld County
The proposed project or activity is as follows: The operator is requesting to modify the condensate storage
vessels and hydrocarbon liquid loadout at an existing well production facility located in the severe ozone
nonattainment area. With this application, the operator is requesting to cancel existing general permit
coverage for both sources and obtain traditional permits. Additionally, the throughput for the condensate
storage vessels is being increased. Finally, the throughput for the loadout is being decreased and emissions
from this source are now controlled using vapor balance and enclosed combustors.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 22WE0377 Et 22WE0378
are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.cotorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe_apcd_airpermitcomments®state.co.us
• Send comments to our mailing address:
Harrison Slaughter, P.E.
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.02
1 aWl=11::=
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
be publicly accessible, including your name and any other personal information you provide in your
comments.