Loading...
HomeMy WebLinkAbout20230908.tiffMs COLORADO Department of Public Health Er Environment Weld County - Clerk to the Board 1150O St PO Box 758 Greeley, CO 80632 March 20, 2023 To Whom it May Concern: RECEIVED MAR 2 0 2023 WELD COUNTY COMMISSIONERS On March 20, 2023, the Air Pollution Control Division will begin a 30 -day public notice period for PDC Energy, Inc. - Wacker 10 Sec HZ. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. Pvbr,c Revre.c.J OH /03/23 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director Gv.PL('Tr•MN),Nt(os), 0G(T), P., (CH /ERI /DD/DN) 93 /2q /23 2023-0908 ar. 4 Notice of a Proposed Project or Activity Warranting Public „..:4,. Comment Air Pollution Control Division Website Title: PDC Energy, Inc. - Wacker 10 Sec HZ - Weld County Notice Period Begins: March 20, 2023 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: PDC Energy, Inc. Facility: Wacker 10 Sec HZ Well Production Facility SWNW quadrant of Section 10, Township 5N, Range 64W Weld County The proposed project or activity is as follows: Applicant proposes to decrease requested emissions by decreasing the condensate throughput to point 001 while maintaining previously approved site specific emission factors. The facility is in the severe ozone nonattainment area and is synthetic minor for VOC and NOx NANSR and OP programs. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 18WE0951 are available on the Division's website at https://www.colorado.Rov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: Use the web form at https://www.colorado.Qov/cdphe/air-permit-public-notices. This page also includes guidance for public participation Send an email to cdphe_apcd_airpermitcomments®state.co.us Send written comments to our mailing address: Air Pollution Control Division - Oil Et Gas Unit Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.02 COLORApo 1aWIR...}D"wr.r.= NOTE: Comments submitted to the division will be uploaded to an online document repository and will be accessible to the public. Your comments and the division's responses are not considered confidential and will be publicly accessible, including your name and any other personal information you provide in your comments. 2.02 2 In COLORADO Da�paranentotPu6lie Htatlth 6 Envlmttmext Hello